{"id":{"repo_id":"njit","oai_identifier":"oai:digitalcommons.njit.edu:theses-4696"},"canonical_url":"https://search.ndltd.org/etd/njit/oai:digitalcommons.njit.edu:theses-4696","repository":{"repo_id":"njit","name":"NJIT","base_url":"https://digitalcommons.njit.edu/do/oai/"},"display":{"title":"Owner management of engineering/construction projects","abstract":"<p>The engineering and construction of process plants require that many people work together towards completion of one common project. Getting all these people successfully working together is both the primary function of management and the topic of this thesis.</p><p>This thesis avoids dealing with an abstract subject by attempting to adapt elements of the engineering/construction industry to an owner situation. The model is the engineering/ construction division of a major manufacturing company; therefore all three hats of owner, architect/engineer and general contractor are worn. A general survey of actual model members was conducted soliciting which management areas were considered most important to performance. The seven major topics of this thesis are the result of this unscientific survey.</p><p>The major findings include that because the model's task is complex and resources are limited, a matrix organization best suits overall needs. In communication and decision making simple and routine tasks are best handled by individuals within a centralized network; while complex and novel problems are best handled by decentralized groups. In planning and cost, the plans and controls are opposite sides of the same coin and require participation by all. The most neglected yet most important aspect of managing projects is dealing with the human resource - people. The first step in improving this area is to study human behavior in order to better deal with it. Finally, the common ingredients for all successful endeavors include that systems must be flexible in adapting to change, both management and workers must show visible support, and all areas must consider the needs of people.</p>","abstract_html":"&lt;p&gt;The engineering and construction of process plants require that many people work together towards completion of one common project. Getting all these people successfully working together is both the primary function of management and the topic of this thesis.&lt;/p&gt;&lt;p&gt;This thesis avoids dealing with an abstract subject by attempting to adapt elements of the engineering/construction industry to an owner situation. The model is the engineering/ construction division of a major manufacturing company; therefore all three hats of owner, architect/engineer and general contractor are worn. A general survey of actual model members was conducted soliciting which management areas were considered most important to performance. The seven major topics of this thesis are the result of this unscientific survey.&lt;/p&gt;&lt;p&gt;The major findings include that because the model&#x27;s task is complex and resources are limited, a matrix organization best suits overall needs. In communication and decision making simple and routine tasks are best handled by individuals within a centralized network; while complex and novel problems are best handled by decentralized groups. In planning and cost, the plans and controls are opposite sides of the same coin and require participation by all. The most neglected yet most important aspect of managing projects is dealing with the human resource - people. The first step in improving this area is to study human behavior in order to better deal with it. Finally, the common ingredients for all successful endeavors include that systems must be flexible in adapting to change, both management and workers must show visible support, and all areas must consider the needs of people.&lt;/p&gt;","abstract_has_math":false,"creators":["Flaherty, James Joseph"],"institution":null,"degree_name":"Master of Science in Engineering Management - (M.S.)","degree_level":null,"degree_discipline":"Industrial and Management Engineering","degree_department":null,"school":null,"contributors":["John M. Ciborski"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-19T08:44:18Z","subjects":["Construction industry -- Management","Industrial project management","Business Administration, Management, and Operations","Operations Research, Systems Engineering and Industrial Engineering"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://digitalcommons.njit.edu/theses/3672","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://digitalcommons.njit.edu/theses/3672","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://digitalcommons.njit.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Adigitalcommons.njit.edu%3Atheses-4696","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["John M. Ciborski"]},{"key":"dc:creator","label":"Author","values":["Flaherty, James Joseph"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.created","label":"Dc Date Created","values":["1981-05-31T07:00:00Z"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Industrial and Management Engineering"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Engineering Management - (M.S.)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Construction industry -- Management","Industrial project management","Business Administration, Management, and Operations","Operations Research, Systems Engineering and Industrial Engineering"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://digitalcommons.njit.edu/theses/3672"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["<p>The engineering and construction of process plants require that many people work together towards completion of one common project. Getting all these people successfully working together is both the primary function of management and the topic of this thesis.</p><p>This thesis avoids dealing with an abstract subject by attempting to adapt elements of the engineering/construction industry to an owner situation. The model is the engineering/ construction division of a major manufacturing company; therefore all three hats of owner, architect/engineer and general contractor are worn. A general survey of actual model members was conducted soliciting which management areas were considered most important to performance. The seven major topics of this thesis are the result of this unscientific survey.</p><p>The major findings include that because the model's task is complex and resources are limited, a matrix organization best suits overall needs. In communication and decision making simple and routine tasks are best handled by individuals within a centralized network; while complex and novel problems are best handled by decentralized groups. In planning and cost, the plans and controls are opposite sides of the same coin and require participation by all. The most neglected yet most important aspect of managing projects is dealing with the human resource - people. The first step in improving this area is to study human behavior in order to better deal with it. Finally, the common ingredients for all successful endeavors include that systems must be flexible in adapting to change, both management and workers must show visible support, and all areas must consider the needs of people.</p>"]},{"key":"dc:title","label":"Title","values":["Owner management of engineering/construction projects"]}]}],"canonical_facts":{"dc:contributor":["John M. Ciborski"],"dc:creator":["Flaherty, James Joseph"],"dc:date.created":["1981-05-31T07:00:00Z"],"dc:description.abstract":["<p>The engineering and construction of process plants require that many people work together towards completion of one common project. Getting all these people successfully working together is both the primary function of management and the topic of this thesis.</p><p>This thesis avoids dealing with an abstract subject by attempting to adapt elements of the engineering/construction industry to an owner situation. The model is the engineering/ construction division of a major manufacturing company; therefore all three hats of owner, architect/engineer and general contractor are worn. A general survey of actual model members was conducted soliciting which management areas were considered most important to performance. The seven major topics of this thesis are the result of this unscientific survey.</p><p>The major findings include that because the model's task is complex and resources are limited, a matrix organization best suits overall needs. In communication and decision making simple and routine tasks are best handled by individuals within a centralized network; while complex and novel problems are best handled by decentralized groups. In planning and cost, the plans and controls are opposite sides of the same coin and require participation by all. The most neglected yet most important aspect of managing projects is dealing with the human resource - people. The first step in improving this area is to study human behavior in order to better deal with it. Finally, the common ingredients for all successful endeavors include that systems must be flexible in adapting to change, both management and workers must show visible support, and all areas must consider the needs of people.</p>"],"dc:identifier":["https://digitalcommons.njit.edu/theses/3672"],"dc:subject":["Construction industry -- Management","Industrial project management","Business Administration, Management, and Operations","Operations Research, Systems Engineering and Industrial Engineering"],"dc:title":["Owner management of engineering/construction projects"],"dc:type":["Thesis"],"thesis:degree_discipline":["Industrial and Management Engineering"],"thesis:degree_name":["Master of Science in Engineering Management - (M.S.)"]},"updated_at":"2026-11-19T08:44:18Z"}