{"id":{"repo_id":"nodak","oai_identifier":"oai:commons.und.edu:senior-projects-1090"},"canonical_url":"https://search.ndltd.org/etd/nodak/oai:commons.und.edu:senior-projects-1090","repository":{"repo_id":"nodak","name":"University of North Dakota","base_url":"https://commons.und.edu/do/oai/"},"display":{"title":"Mark Scott Wetland Impoundment Near Polson, MT: Design Proposal","abstract":"<p>This is a design proposal for a wetland is going to be built by Ducks Unlimited northwest of Ronan, MT to promote waterfowl habitat using an embankment structure to pool water. </p><p>•The area has a soil conservation runoff curve number of 71 </p><p>•The time of concentration was found to be two hours </p><p>•The overflow elevation of that wetland is at 2998 feet above sea level </p><p>•The impoundment will be approximately nine acres and have a drainage basin area of 1,200 acres. </p><p>•The Embankment will pass the 100-year-24 hour storm, and maintenance to the structure and embankment will be minimal. </p><p>•The control structure in the embankment will consist of a broad-crested weir with stop-logs. </p><p>•A final design of using a five foot weir with two emergency spillway locations was chosen </p><p>•The cost of the proposed design is $14,760 </p>","abstract_html":"&lt;p&gt;This is a design proposal for a wetland is going to be built by Ducks Unlimited northwest of Ronan, MT to promote waterfowl habitat using an embankment structure to pool water. &lt;/p&gt;&lt;p&gt;•The area has a soil conservation runoff curve number of 71 &lt;/p&gt;&lt;p&gt;•The time of concentration was found to be two hours &lt;/p&gt;&lt;p&gt;•The overflow elevation of that wetland is at 2998 feet above sea level &lt;/p&gt;&lt;p&gt;•The impoundment will be approximately nine acres and have a drainage basin area of 1,200 acres. &lt;/p&gt;&lt;p&gt;•The Embankment will pass the 100-year-24 hour storm, and maintenance to the structure and embankment will be minimal. &lt;/p&gt;&lt;p&gt;•The control structure in the embankment will consist of a broad-crested weir with stop-logs. &lt;/p&gt;&lt;p&gt;•A final design of using a five foot weir with two emergency spillway locations was chosen &lt;/p&gt;&lt;p&gt;•The cost of the proposed design is $14,760 &lt;/p&gt;","abstract_has_math":false,"creators":["Knutson, Sean"],"institution":null,"degree_name":"Bachelor of Science (BS)","degree_level":"Senior Project","degree_discipline":"Geological Engineering","degree_department":null,"school":null,"contributors":["Dr. Scott F. Korom"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-27T04:04:34Z","subjects":[],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://commons.und.edu/senior-projects/91","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://commons.und.edu/senior-projects/91","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anodak%3Aoai%3Acommons.und.edu%3Asenior-projects-1090","prefix":"oai_dc"},"source_record":{"url":"https://commons.und.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Acommons.und.edu%3Asenior-projects-1090","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Dr. Scott F. Korom"]},{"key":"dc:creator","label":"Author","values":["Knutson, Sean"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.created","label":"Dc Date Created","values":["2007-01-01T08:00:00Z"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Geological Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Senior Project"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Bachelor of Science (BS)"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://commons.und.edu/senior-projects/91"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["<p>This is a design proposal for a wetland is going to be built by Ducks Unlimited northwest of Ronan, MT to promote waterfowl habitat using an embankment structure to pool water. </p><p>•The area has a soil conservation runoff curve number of 71 </p><p>•The time of concentration was found to be two hours </p><p>•The overflow elevation of that wetland is at 2998 feet above sea level </p><p>•The impoundment will be approximately nine acres and have a drainage basin area of 1,200 acres. </p><p>•The Embankment will pass the 100-year-24 hour storm, and maintenance to the structure and embankment will be minimal. </p><p>•The control structure in the embankment will consist of a broad-crested weir with stop-logs. </p><p>•A final design of using a five foot weir with two emergency spillway locations was chosen </p><p>•The cost of the proposed design is $14,760 </p>","This is a design proposal for a wetland is going to be built by Ducks Unlimited northwest of Ronan, MT to promote waterfowl habitat using an embankment structure to pool water. •The area has a soil conservation runoff curve number of 71 •The time of concentration was found to be two hours •The overflow elevation of that wetland is at 2998 feet above sea level •The impoundment will be approximately nine acres and have a drainage basin area of 1,200 acres. •The Embankment will pass the 100-year-24 hour storm, and maintenance to the structure and embankment will be minimal. •The control structure in the embankment will consist of a broad-crested weir with stop-logs. •A final design of using a five foot weir with two emergency spillway locations was chosen •The cost of the proposed design is $14,760"]},{"key":"dc:title","label":"Title","values":["Mark Scott Wetland Impoundment Near Polson, MT: Design Proposal"]}]}],"canonical_facts":{"dc:contributor":["Dr. Scott F. Korom"],"dc:creator":["Knutson, Sean"],"dc:date.created":["2007-01-01T08:00:00Z"],"dc:description.abstract":["<p>This is a design proposal for a wetland is going to be built by Ducks Unlimited northwest of Ronan, MT to promote waterfowl habitat using an embankment structure to pool water. </p><p>•The area has a soil conservation runoff curve number of 71 </p><p>•The time of concentration was found to be two hours </p><p>•The overflow elevation of that wetland is at 2998 feet above sea level </p><p>•The impoundment will be approximately nine acres and have a drainage basin area of 1,200 acres. </p><p>•The Embankment will pass the 100-year-24 hour storm, and maintenance to the structure and embankment will be minimal. </p><p>•The control structure in the embankment will consist of a broad-crested weir with stop-logs. </p><p>•A final design of using a five foot weir with two emergency spillway locations was chosen </p><p>•The cost of the proposed design is $14,760 </p>","This is a design proposal for a wetland is going to be built by Ducks Unlimited northwest of Ronan, MT to promote waterfowl habitat using an embankment structure to pool water. •The area has a soil conservation runoff curve number of 71 •The time of concentration was found to be two hours •The overflow elevation of that wetland is at 2998 feet above sea level •The impoundment will be approximately nine acres and have a drainage basin area of 1,200 acres. •The Embankment will pass the 100-year-24 hour storm, and maintenance to the structure and embankment will be minimal. •The control structure in the embankment will consist of a broad-crested weir with stop-logs. •A final design of using a five foot weir with two emergency spillway locations was chosen •The cost of the proposed design is $14,760"],"dc:identifier":["https://commons.und.edu/senior-projects/91"],"dc:title":["Mark Scott Wetland Impoundment Near Polson, MT: Design Proposal"],"thesis:degree_discipline":["Geological Engineering"],"thesis:degree_level":["Senior Project"],"thesis:degree_name":["Bachelor of Science (BS)"]},"updated_at":"2026-11-27T04:04:34Z"}