{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/10003"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/10003","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Filling H-60 helicopter readiness shortfalls by streamlining and revising depot level maintenance procedures","abstract":"Recognizing the need to extend aircraft service lives, Naval Air Systems Command developed the Integrated Maintenance Concept (IMC). IMC was seen as an opportunity to integrate tasks over all levels of maintenance and balance the operational, engineering, and fiscal aspects of an aircraft's preventative maintenance program. Implementation of IMC has resulted in several unintended consequences, most importantly degraded readiness. Aircraft rebuild and in-process work required of squadron personnel interrupt maintenance at the squadrons and work stoppages interrupt flow at the depot. The result is wider variability in both processes, increasing inventory at the depot and squadron workloads, degrading operational availability by limiting aircraft inventory and interrupting production at the squadron. The authors built a simulation model using Arena software to test the hypothesis that assigning organizational-level tasks to depot personnel would reduce variability in the process, and thereby decrease cycle times and depot work-in-process inventory. We concluded that implementing our project at a cost of 1.4 million per year would be equivalent to having six additional aircraft, which implies savings of between 3 6 million and 150 million. Additionally, we concluded that the squadron labor freed from working on depot aircraft should result in increased operational readiness levels.","abstract_html":"Recognizing the need to extend aircraft service lives, Naval Air Systems Command developed the Integrated Maintenance Concept (IMC). IMC was seen as an opportunity to integrate tasks over all levels of maintenance and balance the operational, engineering, and fiscal aspects of an aircraft&#x27;s preventative maintenance program. Implementation of IMC has resulted in several unintended consequences, most importantly degraded readiness. Aircraft rebuild and in-process work required of squadron personnel interrupt maintenance at the squadrons and work stoppages interrupt flow at the depot. The result is wider variability in both processes, increasing inventory at the depot and squadron workloads, degrading operational availability by limiting aircraft inventory and interrupting production at the squadron. The authors built a simulation model using Arena software to test the hypothesis that assigning organizational-level tasks to depot personnel would reduce variability in the process, and thereby decrease cycle times and depot work-in-process inventory. We concluded that implementing our project at a cost of 1.4 million per year would be equivalent to having six additional aircraft, which implies savings of between 3 6 million and 150 million. Additionally, we concluded that the squadron labor freed from working on depot aircraft should result in increased operational readiness levels.","abstract_has_math":false,"creators":["Snowden, Timothy M.","Sullivan, Douglas R."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Kang, Keebom","Eaton, Don"],"committee_chairs":[],"committee_members":[],"year":2005,"date_issued":"2005-12","date_published":"2005-12","updated_at":"2026-11-19T06:02:29Z","subjects":["Helicopters."],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/10003","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/10003","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F10003","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F10003","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Kang, Keebom","Eaton, Don"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Snowden, Timothy M.","Sullivan, Douglas R."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:30:54Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:30:54Z"]},{"key":"dc:date.issued","label":"Date","values":["2005-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School (U.S.)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Naval Aviation Maintenance","H-60 Helicopter Depot Level Maintenance","Integrated Maintenance Plan","Simulation Modeling"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Helicopters."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/10003"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["Recognizing the need to extend aircraft service lives, Naval Air Systems Command developed the Integrated Maintenance Concept (IMC). IMC was seen as an opportunity to integrate tasks over all levels of maintenance and balance the operational, engineering, and fiscal aspects of an aircraft's preventative maintenance program. Implementation of IMC has resulted in several unintended consequences, most importantly degraded readiness. Aircraft rebuild and in-process work required of squadron personnel interrupt maintenance at the squadrons and work stoppages interrupt flow at the depot. The result is wider variability in both processes, increasing inventory at the depot and squadron workloads, degrading operational availability by limiting aircraft inventory and interrupting production at the squadron. The authors built a simulation model using Arena software to test the hypothesis that assigning organizational-level tasks to depot personnel would reduce variability in the process, and thereby decrease cycle times and depot work-in-process inventory. We concluded that implementing our project at a cost of 1.4 million per year would be equivalent to having six additional aircraft, which implies savings of between 3 6 million and 150 million. Additionally, we concluded that the squadron labor freed from working on depot aircraft should result in increased operational readiness levels."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/fillinghhelicopt1094510003"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xvi, 30 p. : ill. ; 28 cm."]},{"key":"dc:title","label":"Title","values":["Filling H-60 helicopter readiness shortfalls by streamlining and revising depot level maintenance procedures"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["US Navy (USN) authors."]}]}],"canonical_facts":{"dc:contributor.advisor":["Kang, Keebom","Eaton, Don"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Snowden, Timothy M.","Sullivan, Douglas R."],"dc:date.accessioned":["2012-08-22T15:30:54Z"],"dc:date.available":["2012-08-22T15:30:54Z"],"dc:date.issued":["2005-12"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["Recognizing the need to extend aircraft service lives, Naval Air Systems Command developed the Integrated Maintenance Concept (IMC). IMC was seen as an opportunity to integrate tasks over all levels of maintenance and balance the operational, engineering, and fiscal aspects of an aircraft's preventative maintenance program. Implementation of IMC has resulted in several unintended consequences, most importantly degraded readiness. Aircraft rebuild and in-process work required of squadron personnel interrupt maintenance at the squadrons and work stoppages interrupt flow at the depot. The result is wider variability in both processes, increasing inventory at the depot and squadron workloads, degrading operational availability by limiting aircraft inventory and interrupting production at the squadron. The authors built a simulation model using Arena software to test the hypothesis that assigning organizational-level tasks to depot personnel would reduce variability in the process, and thereby decrease cycle times and depot work-in-process inventory. We concluded that implementing our project at a cost of 1.4 million per year would be equivalent to having six additional aircraft, which implies savings of between 3 6 million and 150 million. Additionally, we concluded that the squadron labor freed from working on depot aircraft should result in increased operational readiness levels."],"dc:description.uri":["http://archive.org/details/fillinghhelicopt1094510003"],"dc:format.extent":["xvi, 30 p. : ill. ; 28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/10003"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Naval Aviation Maintenance","H-60 Helicopter Depot Level Maintenance","Integrated Maintenance Plan","Simulation Modeling"],"dc:subject.lcsh":["Helicopters."],"dc:title":["Filling H-60 helicopter readiness shortfalls by streamlining and revising depot level maintenance procedures"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["US Navy (USN) authors."],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School (U.S.)"]},"updated_at":"2026-11-19T06:02:29Z"}