{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/10006"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/10006","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Supportability for the V-22 Osprey","abstract":"The purpose of this MBA Project was to investigate and provide a comprehensive analysis of the supporting requirements for the V-22 Osprey from the perspective of the United States Navy and Marine Corps. The primary objective was to assist in determining the specifics that will be necessary to support the successful fielding of the weapons system. Various analysis techniques help identify and document specific requirements including training, spares, and the contracting options that will be necessary to support the overall weapons system from \"tip to tail\".. This report also includes potential outliers or issues related to the current plan. The benefit of choosing a commercial support plan in the form of Performance Based Logistics versus a traditional government supportability plan is measured in readiness. Impacts to cost over the lifecycle of the weapons system are measured in flying hours per dollar.","abstract_html":"The purpose of this MBA Project was to investigate and provide a comprehensive analysis of the supporting requirements for the V-22 Osprey from the perspective of the United States Navy and Marine Corps. The primary objective was to assist in determining the specifics that will be necessary to support the successful fielding of the weapons system. Various analysis techniques help identify and document specific requirements including training, spares, and the contracting options that will be necessary to support the overall weapons system from &quot;tip to tail&quot;.. This report also includes potential outliers or issues related to the current plan. The benefit of choosing a commercial support plan in the form of Performance Based Logistics versus a traditional government supportability plan is measured in readiness. Impacts to cost over the lifecycle of the weapons system are measured in flying hours per dollar.","abstract_has_math":false,"creators":["Torres, Angela S. Stanmore"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Hensel, Nayantara","Troy, Carmelita"],"committee_chairs":[],"committee_members":[],"year":2005,"date_issued":"2005-12","date_published":"2005-12","updated_at":"2026-11-19T06:02:29Z","subjects":["Logistics, Naval."],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/10006","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/10006","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F10006","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F10006","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Hensel, Nayantara","Troy, Carmelita"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Torres, Angela S. Stanmore"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:30:54Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:30:54Z"]},{"key":"dc:date.issued","label":"Date","values":["2005-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Performance Based Logistics","Program Management","Performance Contract Management","Major Force Programs"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Logistics, Naval."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/10006"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this MBA Project was to investigate and provide a comprehensive analysis of the supporting requirements for the V-22 Osprey from the perspective of the United States Navy and Marine Corps. The primary objective was to assist in determining the specifics that will be necessary to support the successful fielding of the weapons system. Various analysis techniques help identify and document specific requirements including training, spares, and the contracting options that will be necessary to support the overall weapons system from \"tip to tail\".. This report also includes potential outliers or issues related to the current plan. The benefit of choosing a commercial support plan in the form of Performance Based Logistics versus a traditional government supportability plan is measured in readiness. Impacts to cost over the lifecycle of the weapons system are measured in flying hours per dollar."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/supportabilityfo1094510006"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xxiv, 54 p. : ill.","28 cm."]},{"key":"dc:title","label":"Title","values":["Supportability for the V-22 Osprey"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["US Navy (USN) author."]}]}],"canonical_facts":{"dc:contributor.advisor":["Hensel, Nayantara","Troy, Carmelita"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Torres, Angela S. Stanmore"],"dc:date.accessioned":["2012-08-22T15:30:54Z"],"dc:date.available":["2012-08-22T15:30:54Z"],"dc:date.issued":["2005-12"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["The purpose of this MBA Project was to investigate and provide a comprehensive analysis of the supporting requirements for the V-22 Osprey from the perspective of the United States Navy and Marine Corps. The primary objective was to assist in determining the specifics that will be necessary to support the successful fielding of the weapons system. Various analysis techniques help identify and document specific requirements including training, spares, and the contracting options that will be necessary to support the overall weapons system from \"tip to tail\".. This report also includes potential outliers or issues related to the current plan. The benefit of choosing a commercial support plan in the form of Performance Based Logistics versus a traditional government supportability plan is measured in readiness. Impacts to cost over the lifecycle of the weapons system are measured in flying hours per dollar."],"dc:description.uri":["http://archive.org/details/supportabilityfo1094510006"],"dc:format.extent":["xxiv, 54 p. : ill.","28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/10006"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Performance Based Logistics","Program Management","Performance Contract Management","Major Force Programs"],"dc:subject.lcsh":["Logistics, Naval."],"dc:title":["Supportability for the V-22 Osprey"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["US Navy (USN) author."],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:02:29Z"}