{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/10029"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/10029","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Decision-support quantitative models for valuing incentives in performance based contracts","abstract":"The purpose of this MBA project is to identify the actual cost savings when a Performance Based Logistics (PBL) contract, with incentives, is awarded to replace a specified maintenance echelon for critical components or subcomponents of systems. We will examine the impact on system availability to determine if a proposed investment will be practical. The entire logistics flow and maintenance processes, to include all associated subactivities, will be analyzed. In order to do this, we must initially identify all costs of operating the current organic maintenance echelon, which will become the PBL baseline. This will be used to determine the value added of any incremental percentage change in readiness or elimination of organic maintenance echelon(s). We propose to develop a simulation based decision support tool to assist Program Managers (PM) with issues of valuing options for the improvement of system availability, and making appropriate investment options. Ultimately, this project will determine the financial viability and practicality of implementing a PBL incentive contract.","abstract_html":"The purpose of this MBA project is to identify the actual cost savings when a Performance Based Logistics (PBL) contract, with incentives, is awarded to replace a specified maintenance echelon for critical components or subcomponents of systems. We will examine the impact on system availability to determine if a proposed investment will be practical. The entire logistics flow and maintenance processes, to include all associated subactivities, will be analyzed. In order to do this, we must initially identify all costs of operating the current organic maintenance echelon, which will become the PBL baseline. This will be used to determine the value added of any incremental percentage change in readiness or elimination of organic maintenance echelon(s). We propose to develop a simulation based decision support tool to assist Program Managers (PM) with issues of valuing options for the improvement of system availability, and making appropriate investment options. Ultimately, this project will determine the financial viability and practicality of implementing a PBL incentive contract.","abstract_has_math":false,"creators":["Aguilar, Michael","Estrada, George C.","Myers, Jeffrey J."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Kang, Keebom","Eaton, Don","Doerr, Ken","Apte, Uday"],"committee_chairs":[],"committee_members":[],"year":2005,"date_issued":"2005-06","date_published":"2005-06","updated_at":"2026-11-19T06:02:29Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/10029","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/10029","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F10029","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F10029","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Kang, Keebom","Eaton, Don","Doerr, Ken","Apte, Uday"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Aguilar, Michael","Estrada, George C.","Myers, Jeffrey J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:30:58Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:30:58Z"]},{"key":"dc:date.issued","label":"Date","values":["2005-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Performance Based Logistics","Inherent Reliability","Contract Incentives","Decision Support Tool"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/10029"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this MBA project is to identify the actual cost savings when a Performance Based Logistics (PBL) contract, with incentives, is awarded to replace a specified maintenance echelon for critical components or subcomponents of systems. We will examine the impact on system availability to determine if a proposed investment will be practical. The entire logistics flow and maintenance processes, to include all associated subactivities, will be analyzed. In order to do this, we must initially identify all costs of operating the current organic maintenance echelon, which will become the PBL baseline. This will be used to determine the value added of any incremental percentage change in readiness or elimination of organic maintenance echelon(s). We propose to develop a simulation based decision support tool to assist Program Managers (PM) with issues of valuing options for the improvement of system availability, and making appropriate investment options. Ultimately, this project will determine the financial viability and practicality of implementing a PBL incentive contract."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/decisionsupportq1094510029"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["112 p."]},{"key":"dc:title","label":"Title","values":["Decision-support quantitative models for valuing incentives in performance based contracts"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy","Captain, United States Marine Corp","Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Kang, Keebom","Eaton, Don","Doerr, Ken","Apte, Uday"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Aguilar, Michael","Estrada, George C.","Myers, Jeffrey J."],"dc:date.accessioned":["2012-08-22T15:30:58Z"],"dc:date.available":["2012-08-22T15:30:58Z"],"dc:date.issued":["2005-06"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["The purpose of this MBA project is to identify the actual cost savings when a Performance Based Logistics (PBL) contract, with incentives, is awarded to replace a specified maintenance echelon for critical components or subcomponents of systems. We will examine the impact on system availability to determine if a proposed investment will be practical. The entire logistics flow and maintenance processes, to include all associated subactivities, will be analyzed. In order to do this, we must initially identify all costs of operating the current organic maintenance echelon, which will become the PBL baseline. This will be used to determine the value added of any incremental percentage change in readiness or elimination of organic maintenance echelon(s). We propose to develop a simulation based decision support tool to assist Program Managers (PM) with issues of valuing options for the improvement of system availability, and making appropriate investment options. Ultimately, this project will determine the financial viability and practicality of implementing a PBL incentive contract."],"dc:description.uri":["http://archive.org/details/decisionsupportq1094510029"],"dc:format.extent":["112 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/10029"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"dc:subject.keyword":["Performance Based Logistics","Inherent Reliability","Contract Incentives","Decision Support Tool"],"dc:title":["Decision-support quantitative models for valuing incentives in performance based contracts"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy","Captain, United States Marine Corp","Lieutenant, United States Navy"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:02:29Z"}