{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/10055"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/10055","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Increasing operational availability of H-60 calibration support equipment","abstract":"The purpose of this MBA Project was to identify inefficiencies in the H-60 support equipment calibration process at Naval Air Station, North Island and analyze their impact on operational availability. To conduct this analysis, the researchers mapped the standard calibration process at North Island from beginning to end from a using unit perspective. After identifying the process, the researchers calculated the inherent and operational availability and determined the impacts of process inefficiencies on asset operational availability. The researchers proposed changes to reduce the effects of process inefficiencies on using unit asset availability and provided guidance for further study.","abstract_html":"The purpose of this MBA Project was to identify inefficiencies in the H-60 support equipment calibration process at Naval Air Station, North Island and analyze their impact on operational availability. To conduct this analysis, the researchers mapped the standard calibration process at North Island from beginning to end from a using unit perspective. After identifying the process, the researchers calculated the inherent and operational availability and determined the impacts of process inefficiencies on asset operational availability. The researchers proposed changes to reduce the effects of process inefficiencies on using unit asset availability and provided guidance for further study.","abstract_has_math":false,"creators":["Bevel, Kenneth D.","Stonaker, Robert N.","Johnson, Kelly M."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Kang, Keebom","Apte, Uday M."],"committee_chairs":[],"committee_members":[],"year":2006,"date_issued":"2006-12","date_published":"2006-12","updated_at":"2026-11-19T06:02:29Z","subjects":["Helicopters."],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/10055","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/10055","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F10055","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Kang, Keebom","Apte, Uday M."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Bevel, Kenneth D.","Stonaker, Robert N.","Johnson, Kelly M."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:31:03Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:31:03Z"]},{"key":"dc:date.issued","label":"Date","values":["2006-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Calibration","Support Equipment","Operational Availability","Process Inefficiencies"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Helicopters."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/10055"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this MBA Project was to identify inefficiencies in the H-60 support equipment calibration process at Naval Air Station, North Island and analyze their impact on operational availability. To conduct this analysis, the researchers mapped the standard calibration process at North Island from beginning to end from a using unit perspective. After identifying the process, the researchers calculated the inherent and operational availability and determined the impacts of process inefficiencies on asset operational availability. The researchers proposed changes to reduce the effects of process inefficiencies on using unit asset availability and provided guidance for further study."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/increasingoperat1094510055"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xx, 72 p. : ill. (some col.)","28 cm."]},{"key":"dc:title","label":"Title","values":["Increasing operational availability of H-60 calibration support equipment"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["US Marine Corps (USMC) authors."]}]}],"canonical_facts":{"dc:contributor.advisor":["Kang, Keebom","Apte, Uday M."],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Bevel, Kenneth D.","Stonaker, Robert N.","Johnson, Kelly M."],"dc:date.accessioned":["2012-08-22T15:31:03Z"],"dc:date.available":["2012-08-22T15:31:03Z"],"dc:date.issued":["2006-12"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["The purpose of this MBA Project was to identify inefficiencies in the H-60 support equipment calibration process at Naval Air Station, North Island and analyze their impact on operational availability. To conduct this analysis, the researchers mapped the standard calibration process at North Island from beginning to end from a using unit perspective. After identifying the process, the researchers calculated the inherent and operational availability and determined the impacts of process inefficiencies on asset operational availability. The researchers proposed changes to reduce the effects of process inefficiencies on using unit asset availability and provided guidance for further study."],"dc:description.uri":["http://archive.org/details/increasingoperat1094510055"],"dc:format.extent":["xx, 72 p. : ill. (some col.)","28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/10055"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Calibration","Support Equipment","Operational Availability","Process Inefficiencies"],"dc:subject.lcsh":["Helicopters."],"dc:title":["Increasing operational availability of H-60 calibration support equipment"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["US Marine Corps (USMC) authors."],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:02:29Z"}