{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/10086"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/10086","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Cost valuation: a model for comparing dissimilar aircraft platforms","abstract":"The purpose of this MBA Project was to investigate and provide an overview of current cost valuation methods used to compare aircraft and then determine if the current methods were satisfactory for comparing dissimilar aircraft platforms. The goal of the project was to develop a model using OandS and procurement cost inputs together with aircraft inventory and utilization data in order to produce a cost per unit hour for any given aircraft. A demonstration of the modelb2ss validity using aircraft and cost data from the Predator UAV and the F-16 was then performed to illustrate how it can be used to aid comparisons of dissimilar aircraft platforms that perform similar missions.","abstract_html":"The purpose of this MBA Project was to investigate and provide an overview of current cost valuation methods used to compare aircraft and then determine if the current methods were satisfactory for comparing dissimilar aircraft platforms. The goal of the project was to develop a model using OandS and procurement cost inputs together with aircraft inventory and utilization data in order to produce a cost per unit hour for any given aircraft. A demonstration of the modelb2ss validity using aircraft and cost data from the Predator UAV and the F-16 was then performed to illustrate how it can be used to aid comparisons of dissimilar aircraft platforms that perform similar missions.","abstract_has_math":false,"creators":["Long, Eric J."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Brook, Douglas A.","Gates, William"],"committee_chairs":[],"committee_members":[],"year":2006,"date_issued":"2006-12","date_published":"2006-12","updated_at":"2026-11-19T06:02:29Z","subjects":["Methodology."],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/10086","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/10086","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F10086","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F10086","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Brook, Douglas A.","Gates, William"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Long, Eric J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:31:10Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:31:10Z"]},{"key":"dc:date.issued","label":"Date","values":["2006-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Cost valuation methods","dissimilar aircraft platforms"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Methodology."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/10086"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this MBA Project was to investigate and provide an overview of current cost valuation methods used to compare aircraft and then determine if the current methods were satisfactory for comparing dissimilar aircraft platforms. The goal of the project was to develop a model using OandS and procurement cost inputs together with aircraft inventory and utilization data in order to produce a cost per unit hour for any given aircraft. A demonstration of the modelb2ss validity using aircraft and cost data from the Predator UAV and the F-16 was then performed to illustrate how it can be used to aid comparisons of dissimilar aircraft platforms that perform similar missions."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/costvaluationmod1094510086"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xii, 45 p.","28 cm."]},{"key":"dc:title","label":"Title","values":["Cost valuation: a model for comparing dissimilar aircraft platforms"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["US Marine Corps (USMC) author."]}]}],"canonical_facts":{"dc:contributor.advisor":["Brook, Douglas A.","Gates, William"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Long, Eric J."],"dc:date.accessioned":["2012-08-22T15:31:10Z"],"dc:date.available":["2012-08-22T15:31:10Z"],"dc:date.issued":["2006-12"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["The purpose of this MBA Project was to investigate and provide an overview of current cost valuation methods used to compare aircraft and then determine if the current methods were satisfactory for comparing dissimilar aircraft platforms. The goal of the project was to develop a model using OandS and procurement cost inputs together with aircraft inventory and utilization data in order to produce a cost per unit hour for any given aircraft. A demonstration of the modelb2ss validity using aircraft and cost data from the Predator UAV and the F-16 was then performed to illustrate how it can be used to aid comparisons of dissimilar aircraft platforms that perform similar missions."],"dc:description.uri":["http://archive.org/details/costvaluationmod1094510086"],"dc:format.extent":["xii, 45 p.","28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/10086"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Cost valuation methods","dissimilar aircraft platforms"],"dc:subject.lcsh":["Methodology."],"dc:title":["Cost valuation: a model for comparing dissimilar aircraft platforms"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["US Marine Corps (USMC) author."],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:02:29Z"}