{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/10217"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/10217","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"U.S. Marine communication-electronics school training process: discrete event simulation and lean options","abstract":"This paper uses discrete-event simulation modeling, inventory-reduction, and process improvement concepts to identify and analyze possibilities for improving the training continuum at the Marine Corps Communication-Electronics School (MCCES), specifically in terms of reducing adverse effects of lost-time spent in the Marines Awaiting Training (MAT) Platoon queue. Every possible improvement that the local commander could make without spending any capital was tested using the Process Analyzer Function (PAN) in Arena. The researchers also tested increasing the number of instructors up to the quantity authorized. Potential effects on the MCCES operating budget are offered, i.e., a cost-benefit analysis based on average salaries was conducted with recommendations for making the training system more efficient while examining potential changes to reduce costs. The premise of the study is that Marines Awaiting Training (MAT) are potential warfighters not gaining value-added training nor benefiting the Marine Corps when waiting in a queue to begin Military Occupational Specialty (MOS) training, i.e., adversely affecting Fleet Marine Forces operational readiness. The study coincides with current emphasis on reducing the Training, Transients, Patients, and Prisoners (T2P2) account. The researchers determined that changing from the present MCCES process of scheduling classes to an on-demand scheduling method, and, in some MOSs, changes to the minimum and maximum class sizes and the number of instructors, would result in a reduction in the average days spent in MAT and the average number of Marines in MAT. By utilizing all recommendations, the researchers identified a potential value savings in terms of salary of $1 1.6 million and a potential cost savings to the barracks and base support costs of $1 .9 million.","abstract_html":"This paper uses discrete-event simulation modeling, inventory-reduction, and process improvement concepts to identify and analyze possibilities for improving the training continuum at the Marine Corps Communication-Electronics School (MCCES), specifically in terms of reducing adverse effects of lost-time spent in the Marines Awaiting Training (MAT) Platoon queue. Every possible improvement that the local commander could make without spending any capital was tested using the Process Analyzer Function (PAN) in Arena. The researchers also tested increasing the number of instructors up to the quantity authorized. Potential effects on the MCCES operating budget are offered, i.e., a cost-benefit analysis based on average salaries was conducted with recommendations for making the training system more efficient while examining potential changes to reduce costs. The premise of the study is that Marines Awaiting Training (MAT) are potential warfighters not gaining value-added training nor benefiting the Marine Corps when waiting in a queue to begin Military Occupational Specialty (MOS) training, i.e., adversely affecting Fleet Marine Forces operational readiness. The study coincides with current emphasis on reducing the Training, Transients, Patients, and Prisoners (T2P2) account. The researchers determined that changing from the present MCCES process of scheduling classes to an on-demand scheduling method, and, in some MOSs, changes to the minimum and maximum class sizes and the number of instructors, would result in a reduction in the average days spent in MAT and the average number of Marines in MAT. By utilizing all recommendations, the researchers identified a potential value savings in terms of salary of $1 1.6 million and a potential cost savings to the barracks and base support costs of $1 .9 million.","abstract_has_math":true,"creators":["Neu, Charles R.","Smith, William R.","Davenport, Jon"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Heath, Susan","Simon, Cary","Summers, Don"],"committee_chairs":[],"committee_members":[],"year":2007,"date_issued":"2007-12","date_published":"2007-12","updated_at":"2026-11-19T06:02:29Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/10217","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/10217","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F10217","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F10217","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Heath, Susan","Simon, Cary","Summers, Don"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Neu, Charles R.","Smith, William R.","Davenport, Jon"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:31:37Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:31:37Z"]},{"key":"dc:date.issued","label":"Date","values":["2007-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports","NPS Outstanding Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050","c5e66392-520c-4aaf-9b4f-370ce82b601f"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Queuing Theory","Lean","Theory of Constraints","Training","Scheduling","Marine Corps Communicationselectronics School","Little's Law","Activity-based Costing","Process Improvement","Simulation and Modeling","Cost-benefit Analysis"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/10217"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["This paper uses discrete-event simulation modeling, inventory-reduction, and process improvement concepts to identify and analyze possibilities for improving the training continuum at the Marine Corps Communication-Electronics School (MCCES), specifically in terms of reducing adverse effects of lost-time spent in the Marines Awaiting Training (MAT) Platoon queue. Every possible improvement that the local commander could make without spending any capital was tested using the Process Analyzer Function (PAN) in Arena. The researchers also tested increasing the number of instructors up to the quantity authorized. Potential effects on the MCCES operating budget are offered, i.e., a cost-benefit analysis based on average salaries was conducted with recommendations for making the training system more efficient while examining potential changes to reduce costs. The premise of the study is that Marines Awaiting Training (MAT) are potential warfighters not gaining value-added training nor benefiting the Marine Corps when waiting in a queue to begin Military Occupational Specialty (MOS) training, i.e., adversely affecting Fleet Marine Forces operational readiness. The study coincides with current emphasis on reducing the Training, Transients, Patients, and Prisoners (T2P2) account. The researchers determined that changing from the present MCCES process of scheduling classes to an on-demand scheduling method, and, in some MOSs, changes to the minimum and maximum class sizes and the number of instructors, would result in a reduction in the average days spent in MAT and the average number of Marines in MAT. By utilizing all recommendations, the researchers identified a potential value savings in terms of salary of $1 1.6 million and a potential cost savings to the barracks and base support costs of $1 .9 million."]},{"key":"dc:description.award","label":"Dc Description Award","values":["Outstanding Thesis"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/usmarinecommunic1094510217"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["113 p."]},{"key":"dc:title","label":"Title","values":["U.S. Marine communication-electronics school training process: discrete event simulation and lean options"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, Supply Corps, United States Navy","Major, United States Marine Corps","Captain, United States Marine Corps"]}]}],"canonical_facts":{"dc:contributor.advisor":["Heath, Susan","Simon, Cary","Summers, Don"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Neu, Charles R.","Smith, William R.","Davenport, Jon"],"dc:date.accessioned":["2012-08-22T15:31:37Z"],"dc:date.available":["2012-08-22T15:31:37Z"],"dc:date.issued":["2007-12"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["This paper uses discrete-event simulation modeling, inventory-reduction, and process improvement concepts to identify and analyze possibilities for improving the training continuum at the Marine Corps Communication-Electronics School (MCCES), specifically in terms of reducing adverse effects of lost-time spent in the Marines Awaiting Training (MAT) Platoon queue. Every possible improvement that the local commander could make without spending any capital was tested using the Process Analyzer Function (PAN) in Arena. The researchers also tested increasing the number of instructors up to the quantity authorized. Potential effects on the MCCES operating budget are offered, i.e., a cost-benefit analysis based on average salaries was conducted with recommendations for making the training system more efficient while examining potential changes to reduce costs. The premise of the study is that Marines Awaiting Training (MAT) are potential warfighters not gaining value-added training nor benefiting the Marine Corps when waiting in a queue to begin Military Occupational Specialty (MOS) training, i.e., adversely affecting Fleet Marine Forces operational readiness. The study coincides with current emphasis on reducing the Training, Transients, Patients, and Prisoners (T2P2) account. The researchers determined that changing from the present MCCES process of scheduling classes to an on-demand scheduling method, and, in some MOSs, changes to the minimum and maximum class sizes and the number of instructors, would result in a reduction in the average days spent in MAT and the average number of Marines in MAT. By utilizing all recommendations, the researchers identified a potential value savings in terms of salary of $1 1.6 million and a potential cost savings to the barracks and base support costs of $1 .9 million."],"dc:description.award":["Outstanding Thesis"],"dc:description.uri":["http://archive.org/details/usmarinecommunic1094510217"],"dc:format.extent":["113 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/10217"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports","NPS Outstanding Theses and Dissertations"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050","c5e66392-520c-4aaf-9b4f-370ce82b601f"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"dc:subject.keyword":["Queuing Theory","Lean","Theory of Constraints","Training","Scheduling","Marine Corps Communicationselectronics School","Little's Law","Activity-based Costing","Process Improvement","Simulation and Modeling","Cost-benefit Analysis"],"dc:title":["U.S. Marine communication-electronics school training process: discrete event simulation and lean options"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, Supply Corps, United States Navy","Major, United States Marine Corps","Captain, United States Marine Corps"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:02:29Z"}