{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/10242"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/10242","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Estimating the total cost of a personnel security clearance","abstract":"The purpose of this MBA project was to identify, classify, and summarize elements of the total cost of human, physical, and financial resources used in the Personnel Security system. This project was conducted at the request of the Defense Personnel Security Research Center. Costs associated with the Personnel Security Clearance system were estimated, and areas for potential cost avoidance were identified. The purpose of this MBA project was to identify, classify, and summarize elements of the total cost of human, physical, and financial resources used in the Personnel Security system. This project was conducted at the request of the Defense Personnel Security Research Center. Costs associated with the Personnel Security Clearance system were estimated, and areas for potential cost avoidance were identified. Activity-based Costing was used to help identify time-related costs that are often unclear and unbudgeted under the current process. The findings indicate that time-related costs were several times higher than fees charged per investigation.","abstract_html":"The purpose of this MBA project was to identify, classify, and summarize elements of the total cost of human, physical, and financial resources used in the Personnel Security system. This project was conducted at the request of the Defense Personnel Security Research Center. Costs associated with the Personnel Security Clearance system were estimated, and areas for potential cost avoidance were identified. The purpose of this MBA project was to identify, classify, and summarize elements of the total cost of human, physical, and financial resources used in the Personnel Security system. This project was conducted at the request of the Defense Personnel Security Research Center. Costs associated with the Personnel Security Clearance system were estimated, and areas for potential cost avoidance were identified. Activity-based Costing was used to help identify time-related costs that are often unclear and unbudgeted under the current process. The findings indicate that time-related costs were several times higher than fees charged per investigation.","abstract_has_math":false,"creators":["Cullen, Maurice"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["San Miguel, Joseph G.","Timm, Howard"],"committee_chairs":[],"committee_members":[],"year":2007,"date_issued":"2007-06","date_published":"2007-06","updated_at":"2026-11-19T06:02:29Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/10242","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/10242","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F10242","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F10242","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["San Miguel, Joseph G.","Timm, Howard"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Cullen, Maurice"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:31:41Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:31:41Z"]},{"key":"dc:date.issued","label":"Date","values":["2007-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Personnel Security","cost avoidance","Activity-based costing"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/10242"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this MBA project was to identify, classify, and summarize elements of the total cost of human, physical, and financial resources used in the Personnel Security system. This project was conducted at the request of the Defense Personnel Security Research Center. Costs associated with the Personnel Security Clearance system were estimated, and areas for potential cost avoidance were identified. The purpose of this MBA project was to identify, classify, and summarize elements of the total cost of human, physical, and financial resources used in the Personnel Security system. This project was conducted at the request of the Defense Personnel Security Research Center. Costs associated with the Personnel Security Clearance system were estimated, and areas for potential cost avoidance were identified. Activity-based Costing was used to help identify time-related costs that are often unclear and unbudgeted under the current process. The findings indicate that time-related costs were several times higher than fees charged per investigation."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/estimatingtotalc1094510242"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["88 p."]},{"key":"dc:title","label":"Title","values":["Estimating the total cost of a personnel security clearance"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Major, United States Air Force"]}]}],"canonical_facts":{"dc:contributor.advisor":["San Miguel, Joseph G.","Timm, Howard"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Cullen, Maurice"],"dc:date.accessioned":["2012-08-22T15:31:41Z"],"dc:date.available":["2012-08-22T15:31:41Z"],"dc:date.issued":["2007-06"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["The purpose of this MBA project was to identify, classify, and summarize elements of the total cost of human, physical, and financial resources used in the Personnel Security system. This project was conducted at the request of the Defense Personnel Security Research Center. Costs associated with the Personnel Security Clearance system were estimated, and areas for potential cost avoidance were identified. The purpose of this MBA project was to identify, classify, and summarize elements of the total cost of human, physical, and financial resources used in the Personnel Security system. This project was conducted at the request of the Defense Personnel Security Research Center. Costs associated with the Personnel Security Clearance system were estimated, and areas for potential cost avoidance were identified. Activity-based Costing was used to help identify time-related costs that are often unclear and unbudgeted under the current process. The findings indicate that time-related costs were several times higher than fees charged per investigation."],"dc:description.uri":["http://archive.org/details/estimatingtotalc1094510242"],"dc:format.extent":["88 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/10242"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"dc:subject.keyword":["Personnel Security","cost avoidance","Activity-based costing"],"dc:title":["Estimating the total cost of a personnel security clearance"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Major, United States Air Force"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:02:29Z"}