{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/10333"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/10333","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An analysis of the factors generating the variance between the budgeted and actual operating results of the Naval Aviation Depot at North Island, California","abstract":"For six of the past eight years, naval aviation depot-level maintenances activities have encountered operating losses that were not anticipated in the Navy Working Capital Fund (NWCF) budgets. These unanticipated losses resulted in increases or surcharges to the stabilized rates as an offset. This project conducts a variance analysis to uncover possible causes of the unanticipated losses. The variance analysis between budgeted (projected) and actual financial results was performed on financial data collected on the E-2C aircraft program from Fleet Readiness Center Southwest (FRCSW) located in San Diego, California. The results of the variance analysis are interpreted and discussed in terms of labor sales quantity, mix, and rate variances, material sales variance, material expense variance, labor, production overhead, and general and administrative rate/spending and quantity variances. The results of this project reveal the factors that created the greatest variance in FRCSW's net operating results. The variance analysis suggests that the factors having the greatest affect on the operating results were the material sales variances, material expense variances, and the variances due to the quantity of work. Additionally, the analysis revealed that during the year analyzed (FY 2007) FRCSW was not reimbursed for 21 percent of its material costs.","abstract_html":"For six of the past eight years, naval aviation depot-level maintenances activities have encountered operating losses that were not anticipated in the Navy Working Capital Fund (NWCF) budgets. These unanticipated losses resulted in increases or surcharges to the stabilized rates as an offset. This project conducts a variance analysis to uncover possible causes of the unanticipated losses. The variance analysis between budgeted (projected) and actual financial results was performed on financial data collected on the E-2C aircraft program from Fleet Readiness Center Southwest (FRCSW) located in San Diego, California. The results of the variance analysis are interpreted and discussed in terms of labor sales quantity, mix, and rate variances, material sales variance, material expense variance, labor, production overhead, and general and administrative rate/spending and quantity variances. The results of this project reveal the factors that created the greatest variance in FRCSW&#x27;s net operating results. The variance analysis suggests that the factors having the greatest affect on the operating results were the material sales variances, material expense variances, and the variances due to the quantity of work. Additionally, the analysis revealed that during the year analyzed (FY 2007) FRCSW was not reimbursed for 21 percent of its material costs.","abstract_has_math":false,"creators":["Curran, Thomas","Schimpff, Joshua J."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Euske, Kenneth J.","Mutty, John E."],"committee_chairs":[],"committee_members":[],"year":2008,"date_issued":"2008-06","date_published":"2008-06","updated_at":"2026-11-19T06:02:29Z","subjects":[],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/10333","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/10333","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F10333","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F10333","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Euske, Kenneth J.","Mutty, John E."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Curran, Thomas","Schimpff, Joshua J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:31:59Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:31:59Z"]},{"key":"dc:date.issued","label":"Date","values":["2008-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School (U.S.)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Navy working capital fund","naval aviation depot","fleet readiness center","net operating result","variance analysis"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/10333"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["For six of the past eight years, naval aviation depot-level maintenances activities have encountered operating losses that were not anticipated in the Navy Working Capital Fund (NWCF) budgets. These unanticipated losses resulted in increases or surcharges to the stabilized rates as an offset. This project conducts a variance analysis to uncover possible causes of the unanticipated losses. The variance analysis between budgeted (projected) and actual financial results was performed on financial data collected on the E-2C aircraft program from Fleet Readiness Center Southwest (FRCSW) located in San Diego, California. The results of the variance analysis are interpreted and discussed in terms of labor sales quantity, mix, and rate variances, material sales variance, material expense variance, labor, production overhead, and general and administrative rate/spending and quantity variances. The results of this project reveal the factors that created the greatest variance in FRCSW's net operating results. The variance analysis suggests that the factors having the greatest affect on the operating results were the material sales variances, material expense variances, and the variances due to the quantity of work. Additionally, the analysis revealed that during the year analyzed (FY 2007) FRCSW was not reimbursed for 21 percent of its material costs."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/annalysisoffacto1094510333"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["87 p."]},{"key":"dc:title","label":"Title","values":["An analysis of the factors generating the variance between the budgeted and actual operating results of the Naval Aviation Depot at North Island, California"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Commander, United States Navy","Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Euske, Kenneth J.","Mutty, John E."],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Curran, Thomas","Schimpff, Joshua J."],"dc:date.accessioned":["2012-08-22T15:31:59Z"],"dc:date.available":["2012-08-22T15:31:59Z"],"dc:date.issued":["2008-06"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["For six of the past eight years, naval aviation depot-level maintenances activities have encountered operating losses that were not anticipated in the Navy Working Capital Fund (NWCF) budgets. These unanticipated losses resulted in increases or surcharges to the stabilized rates as an offset. This project conducts a variance analysis to uncover possible causes of the unanticipated losses. The variance analysis between budgeted (projected) and actual financial results was performed on financial data collected on the E-2C aircraft program from Fleet Readiness Center Southwest (FRCSW) located in San Diego, California. The results of the variance analysis are interpreted and discussed in terms of labor sales quantity, mix, and rate variances, material sales variance, material expense variance, labor, production overhead, and general and administrative rate/spending and quantity variances. The results of this project reveal the factors that created the greatest variance in FRCSW's net operating results. The variance analysis suggests that the factors having the greatest affect on the operating results were the material sales variances, material expense variances, and the variances due to the quantity of work. Additionally, the analysis revealed that during the year analyzed (FY 2007) FRCSW was not reimbursed for 21 percent of its material costs."],"dc:description.uri":["http://archive.org/details/annalysisoffacto1094510333"],"dc:format.extent":["87 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/10333"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Navy working capital fund","naval aviation depot","fleet readiness center","net operating result","variance analysis"],"dc:title":["An analysis of the factors generating the variance between the budgeted and actual operating results of the Naval Aviation Depot at North Island, California"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Commander, United States Navy","Lieutenant, United States Navy"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School (U.S.)"]},"updated_at":"2026-11-19T06:02:29Z"}