{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/10399"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/10399","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Factors affecting Navy Working Capital Fund (NWCF) net operating result: a case study of Naval Facilities Engineering Command Washington, Washington D.C.","abstract":"Over the past four years, Naval Facilities Engineering Command (NAVFAC) Washington has encountered net operating result (NOR) losses not anticipated in the Navy Working Capital Fund (NWCF) budget. These unanticipated losses primarily stemmed from three major factors associated with financial operations. The first factor is the creation of stabilized rates that turned out to be insufficient during fiscal years 2006, 2007 and 2008. The second factor is the disparity between the budgeted and actual average labor hours worked. The third factor is the continued rising cost of purchased utility commodities in support of the services rendered to the customers, coupled with the inadequate revenues generated from utilities services performed. This MBA research project uses the labor and budget information provided by the command to assist them: (1) determining the financial impacts due to inaccurate projected labor hours, (2) evaluating the current policy concerning stabilized rates, (3) mitigating the impact associated with the rising cost of purchased utilities, and (4) developing an improved model for estimating future expenses and revenues.","abstract_html":"Over the past four years, Naval Facilities Engineering Command (NAVFAC) Washington has encountered net operating result (NOR) losses not anticipated in the Navy Working Capital Fund (NWCF) budget. These unanticipated losses primarily stemmed from three major factors associated with financial operations. The first factor is the creation of stabilized rates that turned out to be insufficient during fiscal years 2006, 2007 and 2008. The second factor is the disparity between the budgeted and actual average labor hours worked. The third factor is the continued rising cost of purchased utility commodities in support of the services rendered to the customers, coupled with the inadequate revenues generated from utilities services performed. This MBA research project uses the labor and budget information provided by the command to assist them: (1) determining the financial impacts due to inaccurate projected labor hours, (2) evaluating the current policy concerning stabilized rates, (3) mitigating the impact associated with the rising cost of purchased utilities, and (4) developing an improved model for estimating future expenses and revenues.","abstract_has_math":false,"creators":["Duong, Tamanh Q.","Uribe, Juan C.","Johnson, Greg R."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Jones, Lawrence R.","Potvin, Lisa"],"committee_chairs":[],"committee_members":[],"year":2009,"date_issued":"2009-12","date_published":"2009-12","updated_at":"2026-11-19T06:02:29Z","subjects":["Analysis of variance."],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/10399","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/10399","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F10399","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Jones, Lawrence R.","Potvin, Lisa"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Duong, Tamanh Q.","Uribe, Juan C.","Johnson, Greg R."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:32:11Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:32:11Z"]},{"key":"dc:date.issued","label":"Date","values":["2009-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Navy Working Capital Fund","Net Operating Result (NOR)","Accumulative Operating Result (AOR)","Naval Facilities Engineering Command (NAVFAC)","Public Works Department (PWD)","Utilities","Labor Hours","Expenses","Revenues","Break Even","Budget Forecasting","Business Model","Variance Analysis","Stabilized Rate","Financial Management","Operations","Policy","Workload","Industrial Business Information System (IBIS)"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Analysis of variance."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/10399"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["Over the past four years, Naval Facilities Engineering Command (NAVFAC) Washington has encountered net operating result (NOR) losses not anticipated in the Navy Working Capital Fund (NWCF) budget. These unanticipated losses primarily stemmed from three major factors associated with financial operations. The first factor is the creation of stabilized rates that turned out to be insufficient during fiscal years 2006, 2007 and 2008. The second factor is the disparity between the budgeted and actual average labor hours worked. The third factor is the continued rising cost of purchased utility commodities in support of the services rendered to the customers, coupled with the inadequate revenues generated from utilities services performed. This MBA research project uses the labor and budget information provided by the command to assist them: (1) determining the financial impacts due to inaccurate projected labor hours, (2) evaluating the current policy concerning stabilized rates, (3) mitigating the impact associated with the rising cost of purchased utilities, and (4) developing an improved model for estimating future expenses and revenues."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/factorsffectingn1094510399"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xxii, 76 p. : 1 col. map","28 cm."]},{"key":"dc:title","label":"Title","values":["Factors affecting Navy Working Capital Fund (NWCF) net operating result: a case study of Naval Facilities Engineering Command Washington, Washington D.C."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Jones, Lawrence R.","Potvin, Lisa"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Duong, Tamanh Q.","Uribe, Juan C.","Johnson, Greg R."],"dc:date.accessioned":["2012-08-22T15:32:11Z"],"dc:date.available":["2012-08-22T15:32:11Z"],"dc:date.issued":["2009-12"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["Over the past four years, Naval Facilities Engineering Command (NAVFAC) Washington has encountered net operating result (NOR) losses not anticipated in the Navy Working Capital Fund (NWCF) budget. These unanticipated losses primarily stemmed from three major factors associated with financial operations. The first factor is the creation of stabilized rates that turned out to be insufficient during fiscal years 2006, 2007 and 2008. The second factor is the disparity between the budgeted and actual average labor hours worked. The third factor is the continued rising cost of purchased utility commodities in support of the services rendered to the customers, coupled with the inadequate revenues generated from utilities services performed. This MBA research project uses the labor and budget information provided by the command to assist them: (1) determining the financial impacts due to inaccurate projected labor hours, (2) evaluating the current policy concerning stabilized rates, (3) mitigating the impact associated with the rising cost of purchased utilities, and (4) developing an improved model for estimating future expenses and revenues."],"dc:description.uri":["http://archive.org/details/factorsffectingn1094510399"],"dc:format.extent":["xxii, 76 p. : 1 col. map","28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/10399"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Navy Working Capital Fund","Net Operating Result (NOR)","Accumulative Operating Result (AOR)","Naval Facilities Engineering Command (NAVFAC)","Public Works Department (PWD)","Utilities","Labor Hours","Expenses","Revenues","Break Even","Budget Forecasting","Business Model","Variance Analysis","Stabilized Rate","Financial Management","Operations","Policy","Workload","Industrial Business Information System (IBIS)"],"dc:subject.lcsh":["Analysis of variance."],"dc:title":["Factors affecting Navy Working Capital Fund (NWCF) net operating result: a case study of Naval Facilities Engineering Command Washington, Washington D.C."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:02:29Z"}