{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/10432"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/10432","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Analyzing C2 Greyhound capacity at Fleet Readiness Center Southwest (FRC SW)","abstract":"In an effort to foster process improvement and ensure cost-wise support of the ongoing military operations throughout the world, Fleet Readiness Center Southwest (FRC SW) created its Continuous Process Improvement (CPI) as a vehicle to establish cost-wise readiness throughout its organization. The goal of this MBA project is to determine a reasonable range of production at Fleet Readiness Center Southwest (FRC SW) while attempting to maximize flexibility to support the fleet. The success of our project depended on to conducting capacity measurement analysis to support our findings and recommendations in assisting FRC SW. We used several modeling tools to assess capacity, which assisted in locating some of the constraints on the C2 production line at FRC SW. We found that the scope of the C2 production line requires further capacity analysis using tools beyond our project. We concluded our project with a recommendation for future research using modeling and simulation.","abstract_html":"In an effort to foster process improvement and ensure cost-wise support of the ongoing military operations throughout the world, Fleet Readiness Center Southwest (FRC SW) created its Continuous Process Improvement (CPI) as a vehicle to establish cost-wise readiness throughout its organization. The goal of this MBA project is to determine a reasonable range of production at Fleet Readiness Center Southwest (FRC SW) while attempting to maximize flexibility to support the fleet. The success of our project depended on to conducting capacity measurement analysis to support our findings and recommendations in assisting FRC SW. We used several modeling tools to assess capacity, which assisted in locating some of the constraints on the C2 production line at FRC SW. We found that the scope of the C2 production line requires further capacity analysis using tools beyond our project. We concluded our project with a recommendation for future research using modeling and simulation.","abstract_has_math":false,"creators":["Dewar, Althea C.","Savanh, Bobby B."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Heath, Susan","Euske, Kenneth"],"committee_chairs":[],"committee_members":[],"year":2009,"date_issued":"2009-06","date_published":"2009-06","updated_at":"2026-11-19T06:02:29Z","subjects":["Risk management."],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/10432","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/10432","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F10432","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F10432","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Heath, Susan","Euske, Kenneth"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Dewar, Althea C.","Savanh, Bobby B."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:32:19Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:32:19Z"]},{"key":"dc:date.issued","label":"Date","values":["2009-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["C2 Greyhound; Capacity Analysis; AirSpeed Toolset; Process Flow; Precedence Diagram; Work Breakdown Structure (WBS); PMI3.;"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Risk management."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/10432"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["In an effort to foster process improvement and ensure cost-wise support of the ongoing military operations throughout the world, Fleet Readiness Center Southwest (FRC SW) created its Continuous Process Improvement (CPI) as a vehicle to establish cost-wise readiness throughout its organization. The goal of this MBA project is to determine a reasonable range of production at Fleet Readiness Center Southwest (FRC SW) while attempting to maximize flexibility to support the fleet. The success of our project depended on to conducting capacity measurement analysis to support our findings and recommendations in assisting FRC SW. We used several modeling tools to assess capacity, which assisted in locating some of the constraints on the C2 production line at FRC SW. We found that the scope of the C2 production line requires further capacity analysis using tools beyond our project. We concluded our project with a recommendation for future research using modeling and simulation."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/analyzingcgreyho1094510432"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xvi, 45 p. : col. ill.","28 cm."]},{"key":"dc:title","label":"Title","values":["Analyzing C2 Greyhound capacity at Fleet Readiness Center Southwest (FRC SW)"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Heath, Susan","Euske, Kenneth"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Dewar, Althea C.","Savanh, Bobby B."],"dc:date.accessioned":["2012-08-22T15:32:19Z"],"dc:date.available":["2012-08-22T15:32:19Z"],"dc:date.issued":["2009-06"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["In an effort to foster process improvement and ensure cost-wise support of the ongoing military operations throughout the world, Fleet Readiness Center Southwest (FRC SW) created its Continuous Process Improvement (CPI) as a vehicle to establish cost-wise readiness throughout its organization. The goal of this MBA project is to determine a reasonable range of production at Fleet Readiness Center Southwest (FRC SW) while attempting to maximize flexibility to support the fleet. The success of our project depended on to conducting capacity measurement analysis to support our findings and recommendations in assisting FRC SW. We used several modeling tools to assess capacity, which assisted in locating some of the constraints on the C2 production line at FRC SW. We found that the scope of the C2 production line requires further capacity analysis using tools beyond our project. We concluded our project with a recommendation for future research using modeling and simulation."],"dc:description.uri":["http://archive.org/details/analyzingcgreyho1094510432"],"dc:format.extent":["xvi, 45 p. : col. ill.","28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/10432"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["C2 Greyhound; Capacity Analysis; AirSpeed Toolset; Process Flow; Precedence Diagram; Work Breakdown Structure (WBS); PMI3.;"],"dc:subject.lcsh":["Risk management."],"dc:title":["Analyzing C2 Greyhound capacity at Fleet Readiness Center Southwest (FRC SW)"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:02:29Z"}