{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/10434"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/10434","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Analysis of the Arliegh Burke Destroyer Class Damage Control shipboard phased-replacement process","abstract":"The primary objective of this project was to provide recommendations for process changes in order to implement an effective phased-replacement program for damage control gear on Arliegh Burke Destroyer Class ships. The research for this report focused on that Damage Control equipment in Repair Locker Two. The authors analyzed the shipboard phased-replacement process to assess whether or not it was effective and adequately supporting the readiness of Repair Locker Two. The analysis was limited in scope to Fiscal Years (FYs) 2007 and 2008. A data analysis, oriented toward process improvement, was conducted based on STARS Federal Supply Group (FSG) data, shipboard interviews, Repair Locker inventories as well as ATG Subject Matter Expert (SME) opinion. The analysis was conducted on ten ships, five from the West Coast, and five from the East Coast. The analysis revealed that phased-replacement support from a standardized process in Repair Locker Two was lacking on multiple ships in the study. Based on the analysis conducted, the authors provided recommendations for a suggested phased-replacement support plan as well as recommendations for process improvement.","abstract_html":"The primary objective of this project was to provide recommendations for process changes in order to implement an effective phased-replacement program for damage control gear on Arliegh Burke Destroyer Class ships. The research for this report focused on that Damage Control equipment in Repair Locker Two. The authors analyzed the shipboard phased-replacement process to assess whether or not it was effective and adequately supporting the readiness of Repair Locker Two. The analysis was limited in scope to Fiscal Years (FYs) 2007 and 2008. A data analysis, oriented toward process improvement, was conducted based on STARS Federal Supply Group (FSG) data, shipboard interviews, Repair Locker inventories as well as ATG Subject Matter Expert (SME) opinion. The analysis was conducted on ten ships, five from the West Coast, and five from the East Coast. The analysis revealed that phased-replacement support from a standardized process in Repair Locker Two was lacking on multiple ships in the study. Based on the analysis conducted, the authors provided recommendations for a suggested phased-replacement support plan as well as recommendations for process improvement.","abstract_has_math":false,"creators":["Erno, Vincent V.","Snyder, Mike"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Euske, K. J.","Wagner, Brett"],"committee_chairs":[],"committee_members":[],"year":2009,"date_issued":"2009-06","date_published":"2009-06","updated_at":"2026-11-19T06:02:29Z","subjects":["Ships|xMaintenance and repair."],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/10434","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/10434","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F10434","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F10434","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Euske, K. J.","Wagner, Brett"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Erno, Vincent V.","Snyder, Mike"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:32:19Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:32:19Z"]},{"key":"dc:date.issued","label":"Date","values":["2009-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School (U.S.)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Phased Replacement","Arliegh Burke Class Destroyer","Damage Control","Process Improvement","DDGRON","CNSF","COMNAVSURFOR","AFMP"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Ships|xMaintenance and repair."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/10434"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["The primary objective of this project was to provide recommendations for process changes in order to implement an effective phased-replacement program for damage control gear on Arliegh Burke Destroyer Class ships. The research for this report focused on that Damage Control equipment in Repair Locker Two. The authors analyzed the shipboard phased-replacement process to assess whether or not it was effective and adequately supporting the readiness of Repair Locker Two. The analysis was limited in scope to Fiscal Years (FYs) 2007 and 2008. A data analysis, oriented toward process improvement, was conducted based on STARS Federal Supply Group (FSG) data, shipboard interviews, Repair Locker inventories as well as ATG Subject Matter Expert (SME) opinion. The analysis was conducted on ten ships, five from the West Coast, and five from the East Coast. The analysis revealed that phased-replacement support from a standardized process in Repair Locker Two was lacking on multiple ships in the study. Based on the analysis conducted, the authors provided recommendations for a suggested phased-replacement support plan as well as recommendations for process improvement."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/analysisofarlieg1094510434"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xvi, 61 p. : ill. ; 28 cm."]},{"key":"dc:title","label":"Title","values":["Analysis of the Arliegh Burke Destroyer Class Damage Control shipboard phased-replacement process"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Euske, K. J.","Wagner, Brett"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Erno, Vincent V.","Snyder, Mike"],"dc:date.accessioned":["2012-08-22T15:32:19Z"],"dc:date.available":["2012-08-22T15:32:19Z"],"dc:date.issued":["2009-06"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["The primary objective of this project was to provide recommendations for process changes in order to implement an effective phased-replacement program for damage control gear on Arliegh Burke Destroyer Class ships. The research for this report focused on that Damage Control equipment in Repair Locker Two. The authors analyzed the shipboard phased-replacement process to assess whether or not it was effective and adequately supporting the readiness of Repair Locker Two. The analysis was limited in scope to Fiscal Years (FYs) 2007 and 2008. A data analysis, oriented toward process improvement, was conducted based on STARS Federal Supply Group (FSG) data, shipboard interviews, Repair Locker inventories as well as ATG Subject Matter Expert (SME) opinion. The analysis was conducted on ten ships, five from the West Coast, and five from the East Coast. The analysis revealed that phased-replacement support from a standardized process in Repair Locker Two was lacking on multiple ships in the study. Based on the analysis conducted, the authors provided recommendations for a suggested phased-replacement support plan as well as recommendations for process improvement."],"dc:description.uri":["http://archive.org/details/analysisofarlieg1094510434"],"dc:format.extent":["xvi, 61 p. : ill. ; 28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/10434"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Phased Replacement","Arliegh Burke Class Destroyer","Damage Control","Process Improvement","DDGRON","CNSF","COMNAVSURFOR","AFMP"],"dc:subject.lcsh":["Ships|xMaintenance and repair."],"dc:title":["Analysis of the Arliegh Burke Destroyer Class Damage Control shipboard phased-replacement process"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School (U.S.)"]},"updated_at":"2026-11-19T06:02:29Z"}