{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/10505"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/10505","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Lean six sigma belt certification goals and standings for TACOM Life Cycle Management Command","abstract":"The purpose of this Joint Applied Project was to investigate and provide a comprehensive overview of the Lean Six Sigma Belt Certification Goals and Standings for those sites associated with TACOM Life Cycle Management Command (LCMC). Sites identified as applicable to this study were queried for their data pertaining to their Lean Six Sigma site goals, their current standings and any guidance/regulations being used to guide their programs. In addition, information was gathered through the Department of the Army Lean Six Sigma channels to provide further direction as to what the goals and standings should be from the Army standpoint. The results of the investigation showed inconsistencies between each of the sites on both setting the certification goals and properly reporting certification goals and standings using the same, standardized methods across the command.","abstract_html":"The purpose of this Joint Applied Project was to investigate and provide a comprehensive overview of the Lean Six Sigma Belt Certification Goals and Standings for those sites associated with TACOM Life Cycle Management Command (LCMC). Sites identified as applicable to this study were queried for their data pertaining to their Lean Six Sigma site goals, their current standings and any guidance/regulations being used to guide their programs. In addition, information was gathered through the Department of the Army Lean Six Sigma channels to provide further direction as to what the goals and standings should be from the Army standpoint. The results of the investigation showed inconsistencies between each of the sites on both setting the certification goals and properly reporting certification goals and standings using the same, standardized methods across the command.","abstract_has_math":false,"creators":["Sullivan, Michelle L.","Davidson, Kimberly"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Program Management","degree_level":null,"degree_discipline":"Program Management","degree_department":null,"school":null,"contributors":[],"advisors":["Boudreau, Michael","Galarza, Daniel"],"committee_chairs":[],"committee_members":[],"year":2010,"date_issued":"2010-12","date_published":"2010-12","updated_at":"2026-11-19T06:02:29Z","subjects":["Standardization."],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/10505","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/10505","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F10505","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F10505","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Boudreau, Michael","Galarza, Daniel"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Human Systems Integration (HSI) Certificate Program"]},{"key":"dc:creator","label":"Author","values":["Sullivan, Michelle L.","Davidson, Kimberly"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 2010"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:32:33Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:32:33Z"]},{"key":"dc:date.issued","label":"Date","values":["2010-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Joint Applied Projects"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b1db68f8-fa8c-4d10-b118-8166cdacdb4c"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["5e5d89a9-08b3-46c1-9247-fc96704340b4"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Program Management"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Program Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Lean Six Sigma","TACOM Life Cycle Management Command","Lean Six Sigma Belt Certification","Black Belt","Green Belt"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Standardization."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/10505"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this Joint Applied Project was to investigate and provide a comprehensive overview of the Lean Six Sigma Belt Certification Goals and Standings for those sites associated with TACOM Life Cycle Management Command (LCMC). Sites identified as applicable to this study were queried for their data pertaining to their Lean Six Sigma site goals, their current standings and any guidance/regulations being used to guide their programs. In addition, information was gathered through the Department of the Army Lean Six Sigma channels to provide further direction as to what the goals and standings should be from the Army standpoint. The results of the investigation showed inconsistencies between each of the sites on both setting the certification goals and properly reporting certification goals and standings using the same, standardized methods across the command."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/lesixsigmbeltcer1094510505"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xvi, 73 p. : col. ill. ; 28 cm."]},{"key":"dc:title","label":"Title","values":["Lean six sigma belt certification goals and standings for TACOM Life Cycle Management Command"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Boudreau, Michael","Galarza, Daniel"],"dc:contributor.other":["Human Systems Integration (HSI) Certificate Program"],"dc:creator":["Sullivan, Michelle L.","Davidson, Kimberly"],"dc:date":["December 2010"],"dc:date.accessioned":["2012-08-22T15:32:33Z"],"dc:date.available":["2012-08-22T15:32:33Z"],"dc:date.issued":["2010-12"],"dc:description.abstract":["The purpose of this Joint Applied Project was to investigate and provide a comprehensive overview of the Lean Six Sigma Belt Certification Goals and Standings for those sites associated with TACOM Life Cycle Management Command (LCMC). Sites identified as applicable to this study were queried for their data pertaining to their Lean Six Sigma site goals, their current standings and any guidance/regulations being used to guide their programs. In addition, information was gathered through the Department of the Army Lean Six Sigma channels to provide further direction as to what the goals and standings should be from the Army standpoint. The results of the investigation showed inconsistencies between each of the sites on both setting the certification goals and properly reporting certification goals and standings using the same, standardized methods across the command."],"dc:description.uri":["http://archive.org/details/lesixsigmbeltcer1094510505"],"dc:format.extent":["xvi, 73 p. : col. ill. ; 28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/10505"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Joint Applied Projects"],"dc:relation.orgunit":["b1db68f8-fa8c-4d10-b118-8166cdacdb4c"],"dc:relation.seriesentity":["5e5d89a9-08b3-46c1-9247-fc96704340b4"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:subject.keyword":["Lean Six Sigma","TACOM Life Cycle Management Command","Lean Six Sigma Belt Certification","Black Belt","Green Belt"],"dc:subject.lcsh":["Standardization."],"dc:title":["Lean six sigma belt certification goals and standings for TACOM Life Cycle Management Command"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Program Management"],"thesis:degree_name":["Master of Science in Program Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:02:29Z"}