{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/10513"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/10513","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Impact of logistics on readiness and life cycle cost : a life cycle management approach","abstract":"Operational commanders are concerned with maintaining an optimal operational availability (Ao) for their weapons systems while balancing with readiness risk (probability of not achieving a threshold Ao), and cost. Operational availability has been integrated in the acquisition process (Department of Defense, 2009), affecting decision making to a great extent. In the early phase of an acquisition, an initial Ao threshold is created to support mission requirements. The initial Ao threshold is used in performancebased contracts in order to reduce the buyers' risk and the total life cycle cost (TLCC). Utilizing logistics modeling, cost analysis, a test platform, which is the Light Armored Vehicle equipped with a 25mm Gun System (LAV-25) currently employed by the United States Marine Corps (USMC), the authors will determine the effects of logistics on Ao and the TLCC utilizing specific critical factors, such as mean time between maintenance (MTBM), mean down time (MDT), and operational tempo. The authors' research will show which of the Ao's synthetic parameters are more sensitive to maintaining specific levels of Ao and readiness risk in conjunction with the cost, and the authors will suggest alternatives to achieve Ao and readiness risk thresholds under specific cost constraints.","abstract_html":"Operational commanders are concerned with maintaining an optimal operational availability (Ao) for their weapons systems while balancing with readiness risk (probability of not achieving a threshold Ao), and cost. Operational availability has been integrated in the acquisition process (Department of Defense, 2009), affecting decision making to a great extent. In the early phase of an acquisition, an initial Ao threshold is created to support mission requirements. The initial Ao threshold is used in performancebased contracts in order to reduce the buyers&#x27; risk and the total life cycle cost (TLCC). Utilizing logistics modeling, cost analysis, a test platform, which is the Light Armored Vehicle equipped with a 25mm Gun System (LAV-25) currently employed by the United States Marine Corps (USMC), the authors will determine the effects of logistics on Ao and the TLCC utilizing specific critical factors, such as mean time between maintenance (MTBM), mean down time (MDT), and operational tempo. The authors&#x27; research will show which of the Ao&#x27;s synthetic parameters are more sensitive to maintaining specific levels of Ao and readiness risk in conjunction with the cost, and the authors will suggest alternatives to achieve Ao and readiness risk thresholds under specific cost constraints.","abstract_has_math":false,"creators":["Balafas, Andreas","Stage, John","Krimizas, Stavros"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Kang, Keebom","Yoder, E. Cory"],"committee_chairs":[],"committee_members":[],"year":2010,"date_issued":"2010-06","date_published":"2010-06","updated_at":"2026-11-19T06:02:29Z","subjects":["Decision making."],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/10513","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/10513","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F10513","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F10513","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Kang, Keebom","Yoder, E. Cory"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Balafas, Andreas","Stage, John","Krimizas, Stavros"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:32:35Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:32:35Z"]},{"key":"dc:date.issued","label":"Date","values":["2010-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School (U.S.)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Operational Availability","Readiness Risk","Total Life Cycle Cost","Performance-Based Logistics","Reliability","Maintainability","Operational Tempo"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Decision making."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/10513"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["Operational commanders are concerned with maintaining an optimal operational availability (Ao) for their weapons systems while balancing with readiness risk (probability of not achieving a threshold Ao), and cost. Operational availability has been integrated in the acquisition process (Department of Defense, 2009), affecting decision making to a great extent. In the early phase of an acquisition, an initial Ao threshold is created to support mission requirements. The initial Ao threshold is used in performancebased contracts in order to reduce the buyers' risk and the total life cycle cost (TLCC). Utilizing logistics modeling, cost analysis, a test platform, which is the Light Armored Vehicle equipped with a 25mm Gun System (LAV-25) currently employed by the United States Marine Corps (USMC), the authors will determine the effects of logistics on Ao and the TLCC utilizing specific critical factors, such as mean time between maintenance (MTBM), mean down time (MDT), and operational tempo. The authors' research will show which of the Ao's synthetic parameters are more sensitive to maintaining specific levels of Ao and readiness risk in conjunction with the cost, and the authors will suggest alternatives to achieve Ao and readiness risk thresholds under specific cost constraints."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/impactoflogistic1094510513"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xvi, 107 p. : ill. ; 28 cm."]},{"key":"dc:title","label":"Title","values":["Impact of logistics on readiness and life cycle cost : a life cycle management approach"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Kang, Keebom","Yoder, E. Cory"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Balafas, Andreas","Stage, John","Krimizas, Stavros"],"dc:date.accessioned":["2012-08-22T15:32:35Z"],"dc:date.available":["2012-08-22T15:32:35Z"],"dc:date.issued":["2010-06"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["Operational commanders are concerned with maintaining an optimal operational availability (Ao) for their weapons systems while balancing with readiness risk (probability of not achieving a threshold Ao), and cost. Operational availability has been integrated in the acquisition process (Department of Defense, 2009), affecting decision making to a great extent. In the early phase of an acquisition, an initial Ao threshold is created to support mission requirements. The initial Ao threshold is used in performancebased contracts in order to reduce the buyers' risk and the total life cycle cost (TLCC). Utilizing logistics modeling, cost analysis, a test platform, which is the Light Armored Vehicle equipped with a 25mm Gun System (LAV-25) currently employed by the United States Marine Corps (USMC), the authors will determine the effects of logistics on Ao and the TLCC utilizing specific critical factors, such as mean time between maintenance (MTBM), mean down time (MDT), and operational tempo. The authors' research will show which of the Ao's synthetic parameters are more sensitive to maintaining specific levels of Ao and readiness risk in conjunction with the cost, and the authors will suggest alternatives to achieve Ao and readiness risk thresholds under specific cost constraints."],"dc:description.uri":["http://archive.org/details/impactoflogistic1094510513"],"dc:format.extent":["xvi, 107 p. : ill. ; 28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/10513"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:subject.keyword":["Operational Availability","Readiness Risk","Total Life Cycle Cost","Performance-Based Logistics","Reliability","Maintainability","Operational Tempo"],"dc:subject.lcsh":["Decision making."],"dc:title":["Impact of logistics on readiness and life cycle cost : a life cycle management approach"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School (U.S.)"]},"updated_at":"2026-11-19T06:02:29Z"}