{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/10738"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/10738","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An acquistion [i.e. acquisition] leader's model for building collaborative capacity","abstract":"This report begins by defining collaboration. Next, the report provides examples of how effective collaboration within the Defense's (DoD) acquisition community is lacking. Based on these examples, the project asks its main research question: \"How can DoD acquisition leaders improve their collaborative capacity to improve cost, schedule and performance?\" Next, the project provides a model for how to do just that. The project, \"An Acquisition Leader's Model for Building Collaborative Capacity\" presents a three-step model. Step one is to assess and analyze collaboration capacity with regard to the elements of one's own organization, the organization's stakeholders, and the network (or the relationships between stakeholders). Next, based on the analyses from step one, step two calls for making plans to improve collaboration capacity, again, along the same elements previously analyzed: one's organization, stakeholders, and the network. Lastly, the model calls for executing the plans made in step 2. This process is repeated until the desired collaboration capacity has been reached. Last, the project provides a detailed hypothetical example of how the model can be applied.","abstract_html":"This report begins by defining collaboration. Next, the report provides examples of how effective collaboration within the Defense&#x27;s (DoD) acquisition community is lacking. Based on these examples, the project asks its main research question: &quot;How can DoD acquisition leaders improve their collaborative capacity to improve cost, schedule and performance?&quot; Next, the project provides a model for how to do just that. The project, &quot;An Acquisition Leader&#x27;s Model for Building Collaborative Capacity&quot; presents a three-step model. Step one is to assess and analyze collaboration capacity with regard to the elements of one&#x27;s own organization, the organization&#x27;s stakeholders, and the network (or the relationships between stakeholders). Next, based on the analyses from step one, step two calls for making plans to improve collaboration capacity, again, along the same elements previously analyzed: one&#x27;s organization, stakeholders, and the network. Lastly, the model calls for executing the plans made in step 2. This process is repeated until the desired collaboration capacity has been reached. Last, the project provides a detailed hypothetical example of how the model can be applied.","abstract_has_math":false,"creators":["Bauer, Louis M.","Meeker, Marc M."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Thomas, Gail F.","Boudreau, Michael W."],"committee_chairs":[],"committee_members":[],"year":2011,"date_issued":"2011-12","date_published":"2011-12","updated_at":"2026-11-19T06:02:42Z","subjects":["Cost."],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/10738","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/10738","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F10738","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F10738","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Thomas, Gail F.","Boudreau, Michael W."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Bauer, Louis M.","Meeker, Marc M."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:33:26Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:33:26Z"]},{"key":"dc:date.issued","label":"Date","values":["2011-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School (U.S.)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Collaboration","Collaboration Capacity","Defense Acquisition","Acquisition Leader","Program Management","Project Management;"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Cost."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/10738"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["This report begins by defining collaboration. Next, the report provides examples of how effective collaboration within the Defense's (DoD) acquisition community is lacking. Based on these examples, the project asks its main research question: \"How can DoD acquisition leaders improve their collaborative capacity to improve cost, schedule and performance?\" Next, the project provides a model for how to do just that. The project, \"An Acquisition Leader's Model for Building Collaborative Capacity\" presents a three-step model. Step one is to assess and analyze collaboration capacity with regard to the elements of one's own organization, the organization's stakeholders, and the network (or the relationships between stakeholders). Next, based on the analyses from step one, step two calls for making plans to improve collaboration capacity, again, along the same elements previously analyzed: one's organization, stakeholders, and the network. Lastly, the model calls for executing the plans made in step 2. This process is repeated until the desired collaboration capacity has been reached. Last, the project provides a detailed hypothetical example of how the model can be applied."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/ancquistioniecqu1094510738"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xviii, 71 p. : ill. ; 28 cm."]},{"key":"dc:title","label":"Title","values":["An acquistion [i.e. acquisition] leader's model for building collaborative capacity"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Thomas, Gail F.","Boudreau, Michael W."],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Bauer, Louis M.","Meeker, Marc M."],"dc:date.accessioned":["2012-08-22T15:33:26Z"],"dc:date.available":["2012-08-22T15:33:26Z"],"dc:date.issued":["2011-12"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["This report begins by defining collaboration. Next, the report provides examples of how effective collaboration within the Defense's (DoD) acquisition community is lacking. Based on these examples, the project asks its main research question: \"How can DoD acquisition leaders improve their collaborative capacity to improve cost, schedule and performance?\" Next, the project provides a model for how to do just that. The project, \"An Acquisition Leader's Model for Building Collaborative Capacity\" presents a three-step model. Step one is to assess and analyze collaboration capacity with regard to the elements of one's own organization, the organization's stakeholders, and the network (or the relationships between stakeholders). Next, based on the analyses from step one, step two calls for making plans to improve collaboration capacity, again, along the same elements previously analyzed: one's organization, stakeholders, and the network. Lastly, the model calls for executing the plans made in step 2. This process is repeated until the desired collaboration capacity has been reached. Last, the project provides a detailed hypothetical example of how the model can be applied."],"dc:description.uri":["http://archive.org/details/ancquistioniecqu1094510738"],"dc:format.extent":["xviii, 71 p. : ill. ; 28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/10738"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:subject.keyword":["Collaboration","Collaboration Capacity","Defense Acquisition","Acquisition Leader","Program Management","Project Management;"],"dc:subject.lcsh":["Cost."],"dc:title":["An acquistion [i.e. acquisition] leader's model for building collaborative capacity"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School (U.S.)"]},"updated_at":"2026-11-19T06:02:42Z"}