{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/10779"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/10779","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"United States Navy contracting officer warranting process","abstract":"The purpose of this project was to investigate how Navy contracting activities warrant the contracting officers under their purview. The FAR and DAWIA establishes minimum training, education, and experience requirements for federal contracting officers. However, most commands implement supplementary requirements. Additionally, we wanted to discover the basis for the selection criteria utilized. The goal was to discover the general, \"unwritten\" requirements for Navy warranting, and whether the process created inconsistencies in the contracting workforce. We expected to find that all commands set different internal procedures for warranting above DAWIA minimums. Furthermore, we expected to find ad hoc processes tailored to the organization's mission and to the individual Appointing Official. According to this research, we discovered that warranting procedures were fragmented within and across Navy contracting commands. This fragmentation could potentially lead to inconsistencies in contracting officer knowledge, abilities, and capabilities. While this project was limited in scope, it is an initial step into the much broader research area of DoD contracting officer-warranting processes.","abstract_html":"The purpose of this project was to investigate how Navy contracting activities warrant the contracting officers under their purview. The FAR and DAWIA establishes minimum training, education, and experience requirements for federal contracting officers. However, most commands implement supplementary requirements. Additionally, we wanted to discover the basis for the selection criteria utilized. The goal was to discover the general, &quot;unwritten&quot; requirements for Navy warranting, and whether the process created inconsistencies in the contracting workforce. We expected to find that all commands set different internal procedures for warranting above DAWIA minimums. Furthermore, we expected to find ad hoc processes tailored to the organization&#x27;s mission and to the individual Appointing Official. According to this research, we discovered that warranting procedures were fragmented within and across Navy contracting commands. This fragmentation could potentially lead to inconsistencies in contracting officer knowledge, abilities, and capabilities. While this project was limited in scope, it is an initial step into the much broader research area of DoD contracting officer-warranting processes.","abstract_has_math":false,"creators":["Cowans, Mark A.","Kremer, Matthew D."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Kidalov, Max V.","Maddox, Janie L."],"committee_chairs":[],"committee_members":[],"year":2011,"date_issued":"2011-03","date_published":"2011-03","updated_at":"2026-11-19T06:02:42Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/10779","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/10779","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F10779","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F10779","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Kidalov, Max V.","Maddox, Janie L."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Human Systems Integration (HSI) Certificate Program","Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Cowans, Mark A.","Kremer, Matthew D."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:33:35Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:33:35Z"]},{"key":"dc:date.issued","label":"Date","values":["2011-03"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Joint Applied Projects"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b1db68f8-fa8c-4d10-b118-8166cdacdb4c","689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["5e5d89a9-08b3-46c1-9247-fc96704340b4"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School (U.S.)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Contracting","Warranting","DAWIA","COMFISCS","NAVSEA","NAVAIR","SPAWAR"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/10779"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Joint Applied Project"]},{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this project was to investigate how Navy contracting activities warrant the contracting officers under their purview. The FAR and DAWIA establishes minimum training, education, and experience requirements for federal contracting officers. However, most commands implement supplementary requirements. Additionally, we wanted to discover the basis for the selection criteria utilized. The goal was to discover the general, \"unwritten\" requirements for Navy warranting, and whether the process created inconsistencies in the contracting workforce. We expected to find that all commands set different internal procedures for warranting above DAWIA minimums. Furthermore, we expected to find ad hoc processes tailored to the organization's mission and to the individual Appointing Official. According to this research, we discovered that warranting procedures were fragmented within and across Navy contracting commands. This fragmentation could potentially lead to inconsistencies in contracting officer knowledge, abilities, and capabilities. While this project was limited in scope, it is an initial step into the much broader research area of DoD contracting officer-warranting processes."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/unitedstatesnavy1094510779"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["165 p."]},{"key":"dc:title","label":"Title","values":["United States Navy contracting officer warranting process"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy","Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Kidalov, Max V.","Maddox, Janie L."],"dc:contributor.other":["Human Systems Integration (HSI) Certificate Program","Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Cowans, Mark A.","Kremer, Matthew D."],"dc:date.accessioned":["2012-08-22T15:33:35Z"],"dc:date.available":["2012-08-22T15:33:35Z"],"dc:date.issued":["2011-03"],"dc:description":["Joint Applied Project"],"dc:description.abstract":["The purpose of this project was to investigate how Navy contracting activities warrant the contracting officers under their purview. The FAR and DAWIA establishes minimum training, education, and experience requirements for federal contracting officers. However, most commands implement supplementary requirements. Additionally, we wanted to discover the basis for the selection criteria utilized. The goal was to discover the general, \"unwritten\" requirements for Navy warranting, and whether the process created inconsistencies in the contracting workforce. We expected to find that all commands set different internal procedures for warranting above DAWIA minimums. Furthermore, we expected to find ad hoc processes tailored to the organization's mission and to the individual Appointing Official. According to this research, we discovered that warranting procedures were fragmented within and across Navy contracting commands. This fragmentation could potentially lead to inconsistencies in contracting officer knowledge, abilities, and capabilities. While this project was limited in scope, it is an initial step into the much broader research area of DoD contracting officer-warranting processes."],"dc:description.uri":["http://archive.org/details/unitedstatesnavy1094510779"],"dc:format.extent":["165 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/10779"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Joint Applied Projects"],"dc:relation.orgunit":["b1db68f8-fa8c-4d10-b118-8166cdacdb4c","689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:relation.seriesentity":["5e5d89a9-08b3-46c1-9247-fc96704340b4"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"dc:subject.keyword":["Contracting","Warranting","DAWIA","COMFISCS","NAVSEA","NAVAIR","SPAWAR"],"dc:title":["United States Navy contracting officer warranting process"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy","Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School (U.S.)"]},"updated_at":"2026-11-19T06:02:42Z"}