{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/10949"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/10949","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Analysis and application of earned value management to the Naval Construction Force","abstract":"This paper investigates the application of Earned Value Methodology to Naval Construction Force (NCF) projects. Earned Value Management integrates technical performance, cost, and schedule goals into a comprehensive analysis tool. A guide to the elements, metrics, and steps required in implementing an Earned Value Management System is provided from an extensive literature review on the subject matter. Application to the Naval Construction Force is made through comparison with existing project management fundamentals and sample project analysis. While these existing fundamentals include some of the basics components of earned value analysis, a full utilization of the analysis and forecasting techniques afforded by the earned value approach is not in place. Conclusions and recommendations for future research are presented.","abstract_html":"This paper investigates the application of Earned Value Methodology to Naval Construction Force (NCF) projects. Earned Value Management integrates technical performance, cost, and schedule goals into a comprehensive analysis tool. A guide to the elements, metrics, and steps required in implementing an Earned Value Management System is provided from an extensive literature review on the subject matter. Application to the Naval Construction Force is made through comparison with existing project management fundamentals and sample project analysis. While these existing fundamentals include some of the basics components of earned value analysis, a full utilization of the analysis and forecasting techniques afforded by the earned value approach is not in place. Conclusions and recommendations for future research are presented.","abstract_has_math":false,"creators":["Hayes, Richard D."],"institution":"Purdue University","degree_name":"Master of Science in Engineering","degree_level":"Masters","degree_discipline":"Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2001,"date_issued":"2001-06","date_published":"2001-06","updated_at":"2026-11-19T06:02:42Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/10949","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/10949","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F10949","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F10949","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["Hayes, Richard D."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:34:26Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:34:26Z"]},{"key":"dc:date.issued","label":"Date","values":["2001-06"]},{"key":"dc:publisher","label":"Institution","values":["Purdue University"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Purdue University"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/10949"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This paper investigates the application of Earned Value Methodology to Naval Construction Force (NCF) projects. Earned Value Management integrates technical performance, cost, and schedule goals into a comprehensive analysis tool. A guide to the elements, metrics, and steps required in implementing an Earned Value Management System is provided from an extensive literature review on the subject matter. Application to the Naval Construction Force is made through comparison with existing project management fundamentals and sample project analysis. While these existing fundamentals include some of the basics components of earned value analysis, a full utilization of the analysis and forecasting techniques afforded by the earned value approach is not in place. Conclusions and recommendations for future research are presented."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/analysisndpplica1094510949"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["81 p."]},{"key":"dc:title","label":"Title","values":["Analysis and application of earned value management to the Naval Construction Force"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["Hayes, Richard D."],"dc:date.accessioned":["2012-08-22T15:34:26Z"],"dc:date.available":["2012-08-22T15:34:26Z"],"dc:date.issued":["2001-06"],"dc:description.abstract":["This paper investigates the application of Earned Value Methodology to Naval Construction Force (NCF) projects. Earned Value Management integrates technical performance, cost, and schedule goals into a comprehensive analysis tool. A guide to the elements, metrics, and steps required in implementing an Earned Value Management System is provided from an extensive literature review on the subject matter. Application to the Naval Construction Force is made through comparison with existing project management fundamentals and sample project analysis. While these existing fundamentals include some of the basics components of earned value analysis, a full utilization of the analysis and forecasting techniques afforded by the earned value approach is not in place. Conclusions and recommendations for future research are presented."],"dc:description.uri":["http://archive.org/details/analysisndpplica1094510949"],"dc:format.extent":["81 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/10949"],"dc:publisher":["Purdue University"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"dc:title":["Analysis and application of earned value management to the Naval Construction Force"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Engineering"],"thesis:institution_name":["Purdue University"]},"updated_at":"2026-11-19T06:02:42Z"}