{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/10971"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/10971","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"The 12-Phase Acquisition Process: a comparison of theory vs. practice","abstract":"The 12-Phase Acquisition Process was developed by the faculty of the Graduate School of Business and Public Policy, Naval Postgraduate School (NPS), and is a cornerstone concept for every contracting class at NPS. The 12-Phases provide a distinct roadmap for the equipment user and a Contracting Officer to navigate the cycle to procure an equipment item. For this thesis, each phase in the 12-Phases is supplied with the pertinent elements (e.g., actions, analyses, events) primarily from the Federal Acquisition Regulation (FAR) Part 12 (Acquisition of Commercial Items) and the FAR Part 13 (Simplified Acquisition Procedures). Additionally, the thesis outlines and analyzes the acquisition process of 2nd Battalion, 1st Special Forces Group (A) using the 12-Phases. Results of the analysis reveal eight problems and shortcomings in the battalion's process. These problems hinder the battalion from achieving its goals of a best-price or best-value, minimum delay, detachment satisfying acquisition. Recommendations are made for the battalion to incorporate elements of the 12- Phases into its acquisition process to better achieve its goals.","abstract_html":"The 12-Phase Acquisition Process was developed by the faculty of the Graduate School of Business and Public Policy, Naval Postgraduate School (NPS), and is a cornerstone concept for every contracting class at NPS. The 12-Phases provide a distinct roadmap for the equipment user and a Contracting Officer to navigate the cycle to procure an equipment item. For this thesis, each phase in the 12-Phases is supplied with the pertinent elements (e.g., actions, analyses, events) primarily from the Federal Acquisition Regulation (FAR) Part 12 (Acquisition of Commercial Items) and the FAR Part 13 (Simplified Acquisition Procedures). Additionally, the thesis outlines and analyzes the acquisition process of 2nd Battalion, 1st Special Forces Group (A) using the 12-Phases. Results of the analysis reveal eight problems and shortcomings in the battalion&#x27;s process. These problems hinder the battalion from achieving its goals of a best-price or best-value, minimum delay, detachment satisfying acquisition. Recommendations are made for the battalion to incorporate elements of the 12- Phases into its acquisition process to better achieve its goals.","abstract_has_math":false,"creators":["Lehner, Christopher"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":null,"school":null,"contributors":[],"advisors":["Yoder, E. Cory","Nissen, Mark E."],"committee_chairs":[],"committee_members":[],"year":2001,"date_issued":"2001-06","date_published":"2001-06","updated_at":"2026-11-19T06:02:42Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/10971","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/10971","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F10971","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F10971","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Yoder, E. Cory","Nissen, Mark E."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Lehner, Christopher"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:34:32Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:34:32Z"]},{"key":"dc:date.issued","label":"Date","values":["2001-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["12-Phase Acquisition Process","Defense Acquisition","Simplified Acquisition Process"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/10971"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The 12-Phase Acquisition Process was developed by the faculty of the Graduate School of Business and Public Policy, Naval Postgraduate School (NPS), and is a cornerstone concept for every contracting class at NPS. The 12-Phases provide a distinct roadmap for the equipment user and a Contracting Officer to navigate the cycle to procure an equipment item. For this thesis, each phase in the 12-Phases is supplied with the pertinent elements (e.g., actions, analyses, events) primarily from the Federal Acquisition Regulation (FAR) Part 12 (Acquisition of Commercial Items) and the FAR Part 13 (Simplified Acquisition Procedures). Additionally, the thesis outlines and analyzes the acquisition process of 2nd Battalion, 1st Special Forces Group (A) using the 12-Phases. Results of the analysis reveal eight problems and shortcomings in the battalion's process. These problems hinder the battalion from achieving its goals of a best-price or best-value, minimum delay, detachment satisfying acquisition. Recommendations are made for the battalion to incorporate elements of the 12- Phases into its acquisition process to better achieve its goals."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/thephaseacquisit1094510971"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["122 p."]},{"key":"dc:title","label":"Title","values":["The 12-Phase Acquisition Process: a comparison of theory vs. practice"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Yoder, E. Cory","Nissen, Mark E."],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Lehner, Christopher"],"dc:date.accessioned":["2012-08-22T15:34:32Z"],"dc:date.available":["2012-08-22T15:34:32Z"],"dc:date.issued":["2001-06"],"dc:description.abstract":["The 12-Phase Acquisition Process was developed by the faculty of the Graduate School of Business and Public Policy, Naval Postgraduate School (NPS), and is a cornerstone concept for every contracting class at NPS. The 12-Phases provide a distinct roadmap for the equipment user and a Contracting Officer to navigate the cycle to procure an equipment item. For this thesis, each phase in the 12-Phases is supplied with the pertinent elements (e.g., actions, analyses, events) primarily from the Federal Acquisition Regulation (FAR) Part 12 (Acquisition of Commercial Items) and the FAR Part 13 (Simplified Acquisition Procedures). Additionally, the thesis outlines and analyzes the acquisition process of 2nd Battalion, 1st Special Forces Group (A) using the 12-Phases. Results of the analysis reveal eight problems and shortcomings in the battalion's process. These problems hinder the battalion from achieving its goals of a best-price or best-value, minimum delay, detachment satisfying acquisition. Recommendations are made for the battalion to incorporate elements of the 12- Phases into its acquisition process to better achieve its goals."],"dc:description.uri":["http://archive.org/details/thephaseacquisit1094510971"],"dc:format.extent":["122 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/10971"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:subject.keyword":["12-Phase Acquisition Process","Defense Acquisition","Simplified Acquisition Process"],"dc:title":["The 12-Phase Acquisition Process: a comparison of theory vs. practice"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:02:42Z"}