{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/11037"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/11037","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Planning and implementation of non-potable water reuse projects at U.S. Naval installations","abstract":"With the passage of Executive Orders 12902 and 13123, the U.S. Navy has been forced to develop water conservation programs and evaluate how water is used at each of its installations. The central goal of these orders is to reduce potable water consumption at federal facilities. Water reuse and recycling has been listed as a best management practice for achieving this goal. However, only a handful of Navy facilities have implemented water reuse projects to date. One of the reasons for this phenomenon is the lack of comprehensive guidance for planning and executing water reuse projects. Consequently, very few Navy facility and energy managers have experience or knowledge regarding water reuse applications. This paper addresses the key factors that must be considered when attempting to execute water reuse projects on Navy installations. Specifically, the following areas are examined: (1) scope and requirements of the U.S. Navy Water Conservation Program, (2) Federal, state, and local regulations, guidance, and other legal issues relating to water reuse, (3) treatment processes used to remove contaminants in order to meet process or regulatory requirements, (4) potential water reuse applications, (5) water storage, (6) risk management, (7) economic considerations, and (8) the project implementation process. Finally, a case study of the U.S. Naval Construction Battalion Center, Gulfport, MS that evaluates various options for water reuse is included at the end of the paper. This paper is intended to establish baseline guidance for planning and implementing water reuse projects at Navy installations. However, site-specific requirements must be considered when planning individual projects. Each base and community will view water reuse differently. The availability of water, public perceptions, intended applications, funding availability, and a host of other issues will determine a water reuse project's success. It is up to facility managers to balance technical requirements, benefits, risks, and local concerns in the planning process.","abstract_html":"With the passage of Executive Orders 12902 and 13123, the U.S. Navy has been forced to develop water conservation programs and evaluate how water is used at each of its installations. The central goal of these orders is to reduce potable water consumption at federal facilities. Water reuse and recycling has been listed as a best management practice for achieving this goal. However, only a handful of Navy facilities have implemented water reuse projects to date. One of the reasons for this phenomenon is the lack of comprehensive guidance for planning and executing water reuse projects. Consequently, very few Navy facility and energy managers have experience or knowledge regarding water reuse applications. This paper addresses the key factors that must be considered when attempting to execute water reuse projects on Navy installations. Specifically, the following areas are examined: (1) scope and requirements of the U.S. Navy Water Conservation Program, (2) Federal, state, and local regulations, guidance, and other legal issues relating to water reuse, (3) treatment processes used to remove contaminants in order to meet process or regulatory requirements, (4) potential water reuse applications, (5) water storage, (6) risk management, (7) economic considerations, and (8) the project implementation process. Finally, a case study of the U.S. Naval Construction Battalion Center, Gulfport, MS that evaluates various options for water reuse is included at the end of the paper. This paper is intended to establish baseline guidance for planning and implementing water reuse projects at Navy installations. However, site-specific requirements must be considered when planning individual projects. Each base and community will view water reuse differently. The availability of water, public perceptions, intended applications, funding availability, and a host of other issues will determine a water reuse project&#x27;s success. It is up to facility managers to balance technical requirements, benefits, risks, and local concerns in the planning process.","abstract_has_math":false,"creators":["Malkin, Joshua Benjamin"],"institution":"University of Maryland, College Park","degree_name":"Master of Science in Civil Engineering","degree_level":"Masters","degree_discipline":"Civil Engineering","degree_department":null,"school":null,"contributors":[],"advisors":["Torrents, Alba"],"committee_chairs":[],"committee_members":[],"year":2003,"date_issued":"2003-08","date_published":"2003-08","updated_at":"2026-11-19T06:02:42Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/11037","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/11037","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F11037","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Torrents, Alba"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["Malkin, Joshua Benjamin"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:34:49Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:34:49Z"]},{"key":"dc:date.issued","label":"Date","values":["2003-08"]},{"key":"dc:publisher","label":"Institution","values":["University of Maryland, College Park"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Civil Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Maryland, College Park"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/11037"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["With the passage of Executive Orders 12902 and 13123, the U.S. Navy has been forced to develop water conservation programs and evaluate how water is used at each of its installations. The central goal of these orders is to reduce potable water consumption at federal facilities. Water reuse and recycling has been listed as a best management practice for achieving this goal. However, only a handful of Navy facilities have implemented water reuse projects to date. One of the reasons for this phenomenon is the lack of comprehensive guidance for planning and executing water reuse projects. Consequently, very few Navy facility and energy managers have experience or knowledge regarding water reuse applications. This paper addresses the key factors that must be considered when attempting to execute water reuse projects on Navy installations. Specifically, the following areas are examined: (1) scope and requirements of the U.S. Navy Water Conservation Program, (2) Federal, state, and local regulations, guidance, and other legal issues relating to water reuse, (3) treatment processes used to remove contaminants in order to meet process or regulatory requirements, (4) potential water reuse applications, (5) water storage, (6) risk management, (7) economic considerations, and (8) the project implementation process. Finally, a case study of the U.S. Naval Construction Battalion Center, Gulfport, MS that evaluates various options for water reuse is included at the end of the paper. This paper is intended to establish baseline guidance for planning and implementing water reuse projects at Navy installations. However, site-specific requirements must be considered when planning individual projects. Each base and community will view water reuse differently. The availability of water, public perceptions, intended applications, funding availability, and a host of other issues will determine a water reuse project's success. It is up to facility managers to balance technical requirements, benefits, risks, and local concerns in the planning process."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/planningndimplem1094511037"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["190 p."]},{"key":"dc:title","label":"Title","values":["Planning and implementation of non-potable water reuse projects at U.S. Naval installations"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, Civil Engineer Corps, U.S. Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Torrents, Alba"],"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["Malkin, Joshua Benjamin"],"dc:date.accessioned":["2012-08-22T15:34:49Z"],"dc:date.available":["2012-08-22T15:34:49Z"],"dc:date.issued":["2003-08"],"dc:description.abstract":["With the passage of Executive Orders 12902 and 13123, the U.S. Navy has been forced to develop water conservation programs and evaluate how water is used at each of its installations. The central goal of these orders is to reduce potable water consumption at federal facilities. Water reuse and recycling has been listed as a best management practice for achieving this goal. However, only a handful of Navy facilities have implemented water reuse projects to date. One of the reasons for this phenomenon is the lack of comprehensive guidance for planning and executing water reuse projects. Consequently, very few Navy facility and energy managers have experience or knowledge regarding water reuse applications. This paper addresses the key factors that must be considered when attempting to execute water reuse projects on Navy installations. Specifically, the following areas are examined: (1) scope and requirements of the U.S. Navy Water Conservation Program, (2) Federal, state, and local regulations, guidance, and other legal issues relating to water reuse, (3) treatment processes used to remove contaminants in order to meet process or regulatory requirements, (4) potential water reuse applications, (5) water storage, (6) risk management, (7) economic considerations, and (8) the project implementation process. Finally, a case study of the U.S. Naval Construction Battalion Center, Gulfport, MS that evaluates various options for water reuse is included at the end of the paper. This paper is intended to establish baseline guidance for planning and implementing water reuse projects at Navy installations. However, site-specific requirements must be considered when planning individual projects. Each base and community will view water reuse differently. The availability of water, public perceptions, intended applications, funding availability, and a host of other issues will determine a water reuse project's success. It is up to facility managers to balance technical requirements, benefits, risks, and local concerns in the planning process."],"dc:description.uri":["http://archive.org/details/planningndimplem1094511037"],"dc:format.extent":["190 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/11037"],"dc:publisher":["University of Maryland, College Park"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"dc:title":["Planning and implementation of non-potable water reuse projects at U.S. Naval installations"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, Civil Engineer Corps, U.S. Navy"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Civil Engineering"],"thesis:institution_name":["University of Maryland, College Park"]},"updated_at":"2026-11-19T06:02:42Z"}