{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/13700"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/13700","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A parametric cost model for estimating acquisition costs of conventional U.S. Navy Surface Ships","abstract":"When attempting to predict the acquisition costs of U.S. Navy surface ships, current models cannot produce a repeatable answer when the details of the acquisition program are not well defined. This thesis formulates a parametric model that predicts the average procurement cost of a conventional U.S. Navy surface ship based upon known (or assumed) physical and performance characteristics. The source data for the cost model is obtained from U.S. Weapons Systems Costs, a tabulation of annual procurement costs for major system programs, published by Data Search Associates. Standard regression techniques return cost estimating relationships able to predict average procurement cost from ship light displacement, ship overall length, ship propulsion shaft horsepower or number of propulsion engines. The formulated parametric cost model is approximate and appropriate only for rough order of magnitude studies, but can be used by the DoD cost community to produce justifiable estimates when other models do not have sufficient information to generate an answer.","abstract_html":"When attempting to predict the acquisition costs of U.S. Navy surface ships, current models cannot produce a repeatable answer when the details of the acquisition program are not well defined. This thesis formulates a parametric model that predicts the average procurement cost of a conventional U.S. Navy surface ship based upon known (or assumed) physical and performance characteristics. The source data for the cost model is obtained from U.S. Weapons Systems Costs, a tabulation of annual procurement costs for major system programs, published by Data Search Associates. Standard regression techniques return cost estimating relationships able to predict average procurement cost from ship light displacement, ship overall length, ship propulsion shaft horsepower or number of propulsion engines. The formulated parametric cost model is approximate and appropriate only for rough order of magnitude studies, but can be used by the DoD cost community to produce justifiable estimates when other models do not have sufficient information to generate an answer.","abstract_has_math":false,"creators":["Loftus, Kirk J."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":null,"school":null,"contributors":[],"advisors":["Timothy P. Anderson."],"committee_chairs":[],"committee_members":[],"year":1999,"date_issued":"1999-09","date_published":"1999-09","updated_at":"2026-11-26T00:14:12Z","subjects":[],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/13700","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/13700","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F13700","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F13700","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Timothy P. Anderson."]},{"key":"dc:creator","label":"Author","values":["Loftus, Kirk J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["September, 1999"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-09-07T15:35:31Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-09-07T15:35:31Z"]},{"key":"dc:date.issued","label":"Date","values":["1999-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/13700"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["When attempting to predict the acquisition costs of U.S. Navy surface ships, current models cannot produce a repeatable answer when the details of the acquisition program are not well defined. This thesis formulates a parametric model that predicts the average procurement cost of a conventional U.S. Navy surface ship based upon known (or assumed) physical and performance characteristics. The source data for the cost model is obtained from U.S. Weapons Systems Costs, a tabulation of annual procurement costs for major system programs, published by Data Search Associates. Standard regression techniques return cost estimating relationships able to predict average procurement cost from ship light displacement, ship overall length, ship propulsion shaft horsepower or number of propulsion engines. The formulated parametric cost model is approximate and appropriate only for rough order of magnitude studies, but can be used by the DoD cost community to produce justifiable estimates when other models do not have sufficient information to generate an answer."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/aparametriccostm1094513700"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xxii, 85 p.;28 cm."]},{"key":"dc:title","label":"Title","values":["A parametric cost model for estimating acquisition costs of conventional U.S. Navy Surface Ships"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["U.S. Navy (U.S.N.) author."]}]}],"canonical_facts":{"dc:contributor.advisor":["Timothy P. Anderson."],"dc:creator":["Loftus, Kirk J."],"dc:date":["September, 1999"],"dc:date.accessioned":["2012-09-07T15:35:31Z"],"dc:date.available":["2012-09-07T15:35:31Z"],"dc:date.issued":["1999-09"],"dc:description.abstract":["When attempting to predict the acquisition costs of U.S. Navy surface ships, current models cannot produce a repeatable answer when the details of the acquisition program are not well defined. This thesis formulates a parametric model that predicts the average procurement cost of a conventional U.S. Navy surface ship based upon known (or assumed) physical and performance characteristics. The source data for the cost model is obtained from U.S. Weapons Systems Costs, a tabulation of annual procurement costs for major system programs, published by Data Search Associates. Standard regression techniques return cost estimating relationships able to predict average procurement cost from ship light displacement, ship overall length, ship propulsion shaft horsepower or number of propulsion engines. The formulated parametric cost model is approximate and appropriate only for rough order of magnitude studies, but can be used by the DoD cost community to produce justifiable estimates when other models do not have sufficient information to generate an answer."],"dc:description.uri":["http://archive.org/details/aparametriccostm1094513700"],"dc:format.extent":["xxii, 85 p.;28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/13700"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:title":["A parametric cost model for estimating acquisition costs of conventional U.S. Navy Surface Ships"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["U.S. Navy (U.S.N.) author."],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-26T00:14:12Z"}