{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/13718"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/13718","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A probabilistic cost estimation model for unexploded ordnance removal","abstract":"The Department of Defense's proposed Range Rule greatly increases the number of unexploded ordnance (UXO) contaminated sites that the services must decontaminate. Existing models for estimating the cost of UXO removal often require a high level of expertise and provide only a point estimate for the costs; they do not provide a probability distribution of the potential costs. This thesis presents a probabilistic cost estimation model created as an \"add- in\" for Microsoft Excel. A test database consisting of descriptive and cost information on the historic cleanup of nineteen contaminated areas is created. To demonstrate the model, the thesis filters the database to find eight historic records characteristically similar to a fictitious cleanup scenario, and uses information from these historic records to build probability distributions for six cost elements. The model applies Monte Carlo simulation to these probability distributions to build a probability distribution for the total cleanup cost. The resulting distribution shows that for this cleanup scenario the most likely per acre cost is $8,400, but there is a 75% chance that costs fall between $8, 500 and $26,000. Results for a scenario composed of three cleanups predicts a most likely total cost of $ 1.7 million with a 50% probability of costs falling between $1.7 million and $2.2 million.","abstract_html":"The Department of Defense&#x27;s proposed Range Rule greatly increases the number of unexploded ordnance (UXO) contaminated sites that the services must decontaminate. Existing models for estimating the cost of UXO removal often require a high level of expertise and provide only a point estimate for the costs; they do not provide a probability distribution of the potential costs. This thesis presents a probabilistic cost estimation model created as an &quot;add- in&quot; for Microsoft Excel. A test database consisting of descriptive and cost information on the historic cleanup of nineteen contaminated areas is created. To demonstrate the model, the thesis filters the database to find eight historic records characteristically similar to a fictitious cleanup scenario, and uses information from these historic records to build probability distributions for six cost elements. The model applies Monte Carlo simulation to these probability distributions to build a probability distribution for the total cleanup cost. The resulting distribution shows that for this cleanup scenario the most likely per acre cost is $8,400, but there is a 75% chance that costs fall between $8, 500 and $26,000. Results for a scenario composed of three cleanups predicts a most likely total cost of $ 1.7 million with a 50% probability of costs falling between $1.7 million and $2.2 million.","abstract_has_math":true,"creators":["Poppe, Peter L."],"institution":"Monterey, California: Naval Postgraduate School","degree_name":"M.S. in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":null,"school":null,"contributors":[],"advisors":["Timothy P. Anderson."],"committee_chairs":[],"committee_members":[],"year":1999,"date_issued":"1999-09","date_published":"1999-09","updated_at":"2026-11-21T22:30:18Z","subjects":[],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/13718","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/13718","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F13718","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F13718","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Timothy P. Anderson."]},{"key":"dc:creator","label":"Author","values":["Poppe, Peter L."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["September, 1999"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-09-07T15:35:36Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-09-07T15:35:36Z"]},{"key":"dc:date.issued","label":"Date","values":["1999-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California: Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/13718"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The Department of Defense's proposed Range Rule greatly increases the number of unexploded ordnance (UXO) contaminated sites that the services must decontaminate. Existing models for estimating the cost of UXO removal often require a high level of expertise and provide only a point estimate for the costs; they do not provide a probability distribution of the potential costs. This thesis presents a probabilistic cost estimation model created as an \"add- in\" for Microsoft Excel. A test database consisting of descriptive and cost information on the historic cleanup of nineteen contaminated areas is created. To demonstrate the model, the thesis filters the database to find eight historic records characteristically similar to a fictitious cleanup scenario, and uses information from these historic records to build probability distributions for six cost elements. The model applies Monte Carlo simulation to these probability distributions to build a probability distribution for the total cleanup cost. The resulting distribution shows that for this cleanup scenario the most likely per acre cost is $8,400, but there is a 75% chance that costs fall between $8, 500 and $26,000. Results for a scenario composed of three cleanups predicts a most likely total cost of $ 1.7 million with a 50% probability of costs falling between $1.7 million and $2.2 million."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/aprobabilisticco1094513718"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xxiv, 101 p.;28 cm."]},{"key":"dc:title","label":"Title","values":["A probabilistic cost estimation model for unexploded ordnance removal"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["U.S. Marine Corps (U.S.M.C.) author."]}]}],"canonical_facts":{"dc:contributor.advisor":["Timothy P. Anderson."],"dc:creator":["Poppe, Peter L."],"dc:date":["September, 1999"],"dc:date.accessioned":["2012-09-07T15:35:36Z"],"dc:date.available":["2012-09-07T15:35:36Z"],"dc:date.issued":["1999-09"],"dc:description.abstract":["The Department of Defense's proposed Range Rule greatly increases the number of unexploded ordnance (UXO) contaminated sites that the services must decontaminate. Existing models for estimating the cost of UXO removal often require a high level of expertise and provide only a point estimate for the costs; they do not provide a probability distribution of the potential costs. This thesis presents a probabilistic cost estimation model created as an \"add- in\" for Microsoft Excel. A test database consisting of descriptive and cost information on the historic cleanup of nineteen contaminated areas is created. To demonstrate the model, the thesis filters the database to find eight historic records characteristically similar to a fictitious cleanup scenario, and uses information from these historic records to build probability distributions for six cost elements. The model applies Monte Carlo simulation to these probability distributions to build a probability distribution for the total cleanup cost. The resulting distribution shows that for this cleanup scenario the most likely per acre cost is $8,400, but there is a 75% chance that costs fall between $8, 500 and $26,000. Results for a scenario composed of three cleanups predicts a most likely total cost of $ 1.7 million with a 50% probability of costs falling between $1.7 million and $2.2 million."],"dc:description.uri":["http://archive.org/details/aprobabilisticco1094513718"],"dc:format.extent":["xxiv, 101 p.;28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/13718"],"dc:publisher":["Monterey, California: Naval Postgraduate School"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:title":["A probabilistic cost estimation model for unexploded ordnance removal"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["U.S. Marine Corps (U.S.M.C.) author."],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:30:18Z"}