{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/1566"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/1566","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An integer linear program to schedule an Army installation's maneuver training","abstract":"This thesis develops an integer linear program called MSAMT (Model to Schedule Army Maneuver Training) to schedule an Army installation's maneuver training. We demonstrate MSAMT using a data set containing 261 platoon-level, 67 company-level and 18 battalion-level units, and 7 major training areas located at Fort Hood, Texas. Using a typical near-term planning horizon from 6 to 8 weeks, MSAMT schedules daily training for a randomly selected set of the stationed units and training requirements. For a 6-week time period and almost 65% (63 platoons 16 companies and 5 battalions) of the units there are 151 platoon-level, 51 company-level and 11 battalion-level required tasks of which MSAMT can schedule 93%. When the subset of units is increased to 80% (75 platoons, 20 companies, 6 battalions), there are 187 platoon-level, 62 company-level and 11 battalion-level tasks of which MSAMT can schedule only 85%. Maintaining the 80% unit level but having an 8 weekperiod increases required training achieved to 94%. Such results can help determine the ability of an Army installation to satisfy training requirements of its stationed units as well as identify a shortage or excess in available training land. It can show the training impact of changing the quantity of units at an installation and thereby aid in base realignment and closure decisions.","abstract_html":"This thesis develops an integer linear program called MSAMT (Model to Schedule Army Maneuver Training) to schedule an Army installation&#x27;s maneuver training. We demonstrate MSAMT using a data set containing 261 platoon-level, 67 company-level and 18 battalion-level units, and 7 major training areas located at Fort Hood, Texas. Using a typical near-term planning horizon from 6 to 8 weeks, MSAMT schedules daily training for a randomly selected set of the stationed units and training requirements. For a 6-week time period and almost 65% (63 platoons 16 companies and 5 battalions) of the units there are 151 platoon-level, 51 company-level and 11 battalion-level required tasks of which MSAMT can schedule 93%. When the subset of units is increased to 80% (75 platoons, 20 companies, 6 battalions), there are 187 platoon-level, 62 company-level and 11 battalion-level tasks of which MSAMT can schedule only 85%. Maintaining the 80% unit level but having an 8 weekperiod increases required training achieved to 94%. Such results can help determine the ability of an Army installation to satisfy training requirements of its stationed units as well as identify a shortage or excess in available training land. It can show the training impact of changing the quantity of units at an installation and thereby aid in base realignment and closure decisions.","abstract_has_math":false,"creators":["Kasimoglu, Fatih"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Department of Operations Research","school":null,"contributors":[],"advisors":["Dell, Robert F."],"committee_chairs":[],"committee_members":["Olwell, David H."],"year":2004,"date_issued":"2004-06","date_published":"2004-06","updated_at":"2026-11-19T06:05:02Z","subjects":["Integer programming","Operations research"],"languages":[],"rights":["Copyright is reserved by the copyright owner","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/1566","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/1566","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F1566","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F1566","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Dell, Robert F."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Olwell, David H."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Operations Research"]},{"key":"dc:creator","label":"Author","values":["Kasimoglu, Fatih"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["June 2004"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-03-14T17:32:18Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-03-14T17:32:18Z"]},{"key":"dc:date.issued","label":"Date","values":["2004-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Operations research","Integer linear programming","Optimal stationing of army forces","Maneuver training scheduling","Optimal usage of army training lands"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Integer programming","Operations research"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Copyright is reserved by the copyright owner","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/1566"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis develops an integer linear program called MSAMT (Model to Schedule Army Maneuver Training) to schedule an Army installation's maneuver training. We demonstrate MSAMT using a data set containing 261 platoon-level, 67 company-level and 18 battalion-level units, and 7 major training areas located at Fort Hood, Texas. Using a typical near-term planning horizon from 6 to 8 weeks, MSAMT schedules daily training for a randomly selected set of the stationed units and training requirements. For a 6-week time period and almost 65% (63 platoons 16 companies and 5 battalions) of the units there are 151 platoon-level, 51 company-level and 11 battalion-level required tasks of which MSAMT can schedule 93%. When the subset of units is increased to 80% (75 platoons, 20 companies, 6 battalions), there are 187 platoon-level, 62 company-level and 11 battalion-level tasks of which MSAMT can schedule only 85%. Maintaining the 80% unit level but having an 8 weekperiod increases required training achieved to 94%. Such results can help determine the ability of an Army installation to satisfy training requirements of its stationed units as well as identify a shortage or excess in available training land. It can show the training impact of changing the quantity of units at an installation and thereby aid in base realignment and closure decisions."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/anintegerlinearp109451566"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xvi, 44 p."]},{"key":"dc:title","label":"Title","values":["An integer linear program to schedule an Army installation's maneuver training"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["First Lieutenant, Turkish Army"]},{"key":"local:etd.verified","label":"Local Etd Verified","values":["no"]}]}],"canonical_facts":{"dc:contributor.advisor":["Dell, Robert F."],"dc:contributor.committeemember":["Olwell, David H."],"dc:contributor.department":["Department of Operations Research"],"dc:creator":["Kasimoglu, Fatih"],"dc:date":["June 2004"],"dc:date.accessioned":["2012-03-14T17:32:18Z"],"dc:date.available":["2012-03-14T17:32:18Z"],"dc:date.issued":["2004-06"],"dc:description.abstract":["This thesis develops an integer linear program called MSAMT (Model to Schedule Army Maneuver Training) to schedule an Army installation's maneuver training. We demonstrate MSAMT using a data set containing 261 platoon-level, 67 company-level and 18 battalion-level units, and 7 major training areas located at Fort Hood, Texas. Using a typical near-term planning horizon from 6 to 8 weeks, MSAMT schedules daily training for a randomly selected set of the stationed units and training requirements. For a 6-week time period and almost 65% (63 platoons 16 companies and 5 battalions) of the units there are 151 platoon-level, 51 company-level and 11 battalion-level required tasks of which MSAMT can schedule 93%. When the subset of units is increased to 80% (75 platoons, 20 companies, 6 battalions), there are 187 platoon-level, 62 company-level and 11 battalion-level tasks of which MSAMT can schedule only 85%. Maintaining the 80% unit level but having an 8 weekperiod increases required training achieved to 94%. Such results can help determine the ability of an Army installation to satisfy training requirements of its stationed units as well as identify a shortage or excess in available training land. It can show the training impact of changing the quantity of units at an installation and thereby aid in base realignment and closure decisions."],"dc:description.uri":["http://archive.org/details/anintegerlinearp109451566"],"dc:format.extent":["xvi, 44 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/1566"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["Copyright is reserved by the copyright owner","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Operations research","Integer linear programming","Optimal stationing of army forces","Maneuver training scheduling","Optimal usage of army training lands"],"dc:subject.lcsh":["Integer programming","Operations research"],"dc:title":["An integer linear program to schedule an Army installation's maneuver training"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["First Lieutenant, Turkish Army"],"local:etd.verified":["no"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:05:02Z"}