{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/16595"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/16595","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Estimation of destroyer type naval ship procurement costs","abstract":"This study presents three models by which the total procurement cost of Destroyer and Destroyer Escorts may be estimated. One model utilizes 9 subsystem costs estimating relationships (CERs) to obtain a total cost estimate; the second model utilizes subsystem CERs; the final model is a single total cost equation. The CERs were developed using the linear least squares regression technique on a data base of ships built from 1954-66. The CERs utilize input variables that may be determined long before actual ship construction begins. This fact, and the precision of the model estimates, recommend usage of these models in cost-effectiveness analysis. The Patrol Frigate is utilized as a sample application, wherein model estimates compare favorably with the current NAVSHIPS cost estimates. This study uses the data base from Resource Management Corporation Report CR-058, The NAVSHIPS Cost Model, and critiques that report.","abstract_html":"This study presents three models by which the total procurement cost of Destroyer and Destroyer Escorts may be estimated. One model utilizes 9 subsystem costs estimating relationships (CERs) to obtain a total cost estimate; the second model utilizes subsystem CERs; the final model is a single total cost equation. The CERs were developed using the linear least squares regression technique on a data base of ships built from 1954-66. The CERs utilize input variables that may be determined long before actual ship construction begins. This fact, and the precision of the model estimates, recommend usage of these models in cost-effectiveness analysis. The Patrol Frigate is utilized as a sample application, wherein model estimates compare favorably with the current NAVSHIPS cost estimates. This study uses the data base from Resource Management Corporation Report CR-058, The NAVSHIPS Cost Model, and critiques that report.","abstract_has_math":false,"creators":["Hernon, Donald Mearns","McCumber, Ralph Ray, Jr."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Operations Research and Administrative Sciences","school":null,"contributors":[],"advisors":["Womer, Norman K."],"committee_chairs":[],"committee_members":["Sovereign, Michael G."],"year":1973,"date_issued":"1973-03","date_published":"1973-03","updated_at":"2026-11-21T22:50:44Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/16595","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/16595","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F16595","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F16595","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Womer, Norman K."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Sovereign, Michael G."]},{"key":"dc:contributor.department","label":"Department","values":["Operations Research and Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Hernon, Donald Mearns","McCumber, Ralph Ray, Jr."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["March 1973"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-13T23:51:07Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-13T23:51:07Z"]},{"key":"dc:date.issued","label":"Date","values":["1973-03"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Costing","Ship construction costs","DD procurement costs","Cost estimating","Cost effectiveness","CERs","PF cost estimates","NAVSHIPS cost model","DD parameters and costs"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/16595"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This study presents three models by which the total procurement cost of Destroyer and Destroyer Escorts may be estimated. One model utilizes 9 subsystem costs estimating relationships (CERs) to obtain a total cost estimate; the second model utilizes subsystem CERs; the final model is a single total cost equation. The CERs were developed using the linear least squares regression technique on a data base of ships built from 1954-66. The CERs utilize input variables that may be determined long before actual ship construction begins. This fact, and the precision of the model estimates, recommend usage of these models in cost-effectiveness analysis. The Patrol Frigate is utilized as a sample application, wherein model estimates compare favorably with the current NAVSHIPS cost estimates. This study uses the data base from Resource Management Corporation Report CR-058, The NAVSHIPS Cost Model, and critiques that report."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/estimationofdest1094516595"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["121 leaves"]},{"key":"dc:title","label":"Title","values":["Estimation of destroyer type naval ship procurement costs"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy","Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Womer, Norman K."],"dc:contributor.committeemember":["Sovereign, Michael G."],"dc:contributor.department":["Operations Research and Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Hernon, Donald Mearns","McCumber, Ralph Ray, Jr."],"dc:date":["March 1973"],"dc:date.accessioned":["2012-11-13T23:51:07Z"],"dc:date.available":["2012-11-13T23:51:07Z"],"dc:date.issued":["1973-03"],"dc:description.abstract":["This study presents three models by which the total procurement cost of Destroyer and Destroyer Escorts may be estimated. One model utilizes 9 subsystem costs estimating relationships (CERs) to obtain a total cost estimate; the second model utilizes subsystem CERs; the final model is a single total cost equation. The CERs were developed using the linear least squares regression technique on a data base of ships built from 1954-66. The CERs utilize input variables that may be determined long before actual ship construction begins. This fact, and the precision of the model estimates, recommend usage of these models in cost-effectiveness analysis. The Patrol Frigate is utilized as a sample application, wherein model estimates compare favorably with the current NAVSHIPS cost estimates. This study uses the data base from Resource Management Corporation Report CR-058, The NAVSHIPS Cost Model, and critiques that report."],"dc:description.uri":["http://archive.org/details/estimationofdest1094516595"],"dc:format.extent":["121 leaves"],"dc:identifier.uri":["https://hdl.handle.net/10945/16595"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Costing","Ship construction costs","DD procurement costs","Cost estimating","Cost effectiveness","CERs","PF cost estimates","NAVSHIPS cost model","DD parameters and costs"],"dc:title":["Estimation of destroyer type naval ship procurement costs"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy","Lieutenant, United States Navy"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:50:44Z"}