{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/16758"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/16758","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Project management for the production phase of system acquisition","abstract":"Military project management for the production phase of system acquisition is discussed. A management framework based on analysis of five principles—planning , organizing, staffing, directing, and controlling—is constructed. Organization alternatives for production management are proposed to the Aegis Weapon System Project Manager, who sponsored this research. The results of this analysis indicate that when a project manager's background is categorized as being operational, administrative or technical, significant conclusions can be drawn concerning the characteristics of the project manager best suited to manage the production phase and the structure of his production organization. Investigation also revealed that the primary functions of military project organizations in the Production phase of system acquisition are: Business Management, Systems Engineering, Production Control, Quality and Testing, and Fleet Support. Departmentation along these functional lines during the Production phase of system acquisition appears to reflect the economic division of work in the military project organization.","abstract_html":"Military project management for the production phase of system acquisition is discussed. A management framework based on analysis of five principles—planning , organizing, staffing, directing, and controlling—is constructed. Organization alternatives for production management are proposed to the Aegis Weapon System Project Manager, who sponsored this research. The results of this analysis indicate that when a project manager&#x27;s background is categorized as being operational, administrative or technical, significant conclusions can be drawn concerning the characteristics of the project manager best suited to manage the production phase and the structure of his production organization. Investigation also revealed that the primary functions of military project organizations in the Production phase of system acquisition are: Business Management, Systems Engineering, Production Control, Quality and Testing, and Fleet Support. Departmentation along these functional lines during the Production phase of system acquisition appears to reflect the economic division of work in the military project organization.","abstract_has_math":false,"creators":["Bergman, Richard H.","Israel, Stephen S."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":null,"school":null,"contributors":[],"advisors":["Capra, James R."],"committee_chairs":[],"committee_members":["Creighton, J.W."],"year":1973,"date_issued":"1973-03","date_published":"1973-03","updated_at":"2026-11-26T00:03:15Z","subjects":["Management"],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/16758","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/16758","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F16758","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F16758","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Capra, James R."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Creighton, J.W."]},{"key":"dc:creator","label":"Author","values":["Bergman, Richard H.","Israel, Stephen S."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-13T23:52:22Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-13T23:52:22Z"]},{"key":"dc:date.issued","label":"Date","values":["1973-03"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/16758"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Military project management for the production phase of system acquisition is discussed. A management framework based on analysis of five principles—planning , organizing, staffing, directing, and controlling—is constructed. Organization alternatives for production management are proposed to the Aegis Weapon System Project Manager, who sponsored this research. The results of this analysis indicate that when a project manager's background is categorized as being operational, administrative or technical, significant conclusions can be drawn concerning the characteristics of the project manager best suited to manage the production phase and the structure of his production organization. Investigation also revealed that the primary functions of military project organizations in the Production phase of system acquisition are: Business Management, Systems Engineering, Production Control, Quality and Testing, and Fleet Support. Departmentation along these functional lines during the Production phase of system acquisition appears to reflect the economic division of work in the military project organization."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/projectmanagemen1094516758"]},{"key":"dc:title","label":"Title","values":["Project management for the production phase of system acquisition"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, Supply Corps","Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Capra, James R."],"dc:contributor.committeemember":["Creighton, J.W."],"dc:creator":["Bergman, Richard H.","Israel, Stephen S."],"dc:date.accessioned":["2012-11-13T23:52:22Z"],"dc:date.available":["2012-11-13T23:52:22Z"],"dc:date.issued":["1973-03"],"dc:description.abstract":["Military project management for the production phase of system acquisition is discussed. A management framework based on analysis of five principles—planning , organizing, staffing, directing, and controlling—is constructed. Organization alternatives for production management are proposed to the Aegis Weapon System Project Manager, who sponsored this research. The results of this analysis indicate that when a project manager's background is categorized as being operational, administrative or technical, significant conclusions can be drawn concerning the characteristics of the project manager best suited to manage the production phase and the structure of his production organization. Investigation also revealed that the primary functions of military project organizations in the Production phase of system acquisition are: Business Management, Systems Engineering, Production Control, Quality and Testing, and Fleet Support. Departmentation along these functional lines during the Production phase of system acquisition appears to reflect the economic division of work in the military project organization."],"dc:description.uri":["http://archive.org/details/projectmanagemen1094516758"],"dc:identifier.uri":["https://hdl.handle.net/10945/16758"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.lcsh":["Management"],"dc:title":["Project management for the production phase of system acquisition"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, Supply Corps","Lieutenant, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-26T00:03:15Z"}