{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/16994"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/16994","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Escalation provisions in DoD procurement: a review of the problem and a framework for analysis.","abstract":"This study reviewed the opinions and concerns expressed by various government and private industry sources with regard to the use and structure of escalation (i.e., economic price adjustment) provisions in government procurement contracting. There was found to be little general agreement among these sources on many of the aspects of escalation provisions, including the \"proper\" objectives of such clauses. After this review a framework was designed to facilitate the analysis of the relationship of escalation provisions and price level uncertainty. The specific model employed examined interacting objectives of the government and a firm in a sole-source contract negotiation scenario. A method was developed to approximate the increase in contract price required by the firm as compensation for accepting the risk of uncertain price levels. A criterion was established for the employment of the escalation provision in the modeled scenario.","abstract_html":"This study reviewed the opinions and concerns expressed by various government and private industry sources with regard to the use and structure of escalation (i.e., economic price adjustment) provisions in government procurement contracting. There was found to be little general agreement among these sources on many of the aspects of escalation provisions, including the &quot;proper&quot; objectives of such clauses. After this review a framework was designed to facilitate the analysis of the relationship of escalation provisions and price level uncertainty. The specific model employed examined interacting objectives of the government and a firm in a sole-source contract negotiation scenario. A method was developed to approximate the increase in contract price required by the firm as compensation for accepting the risk of uncertain price levels. A criterion was established for the employment of the escalation provision in the modeled scenario.","abstract_has_math":false,"creators":["Eberth, Robert William"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Operations Research and Administrative Sciences","school":null,"contributors":[],"advisors":["Block, M.K."],"committee_chairs":[],"committee_members":[],"year":1974,"date_issued":"1974-12","date_published":"1974-12","updated_at":"2026-11-19T06:06:26Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/16994","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/16994","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F16994","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F16994","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Block, M.K."]},{"key":"dc:contributor.department","label":"Department","values":["Operations Research and Administrative Sciences"]},{"key":"dc:creator","label":"Author","values":["Eberth, Robert William"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-13T23:58:48Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-13T23:58:48Z"]},{"key":"dc:date.issued","label":"Date","values":["1974-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["b5a5a05c-9086-4e0f-adfd-321343da76ec"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Escalation","Economic Price Adjustment","Contingencies"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/16994"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This study reviewed the opinions and concerns expressed by various government and private industry sources with regard to the use and structure of escalation (i.e., economic price adjustment) provisions in government procurement contracting. There was found to be little general agreement among these sources on many of the aspects of escalation provisions, including the \"proper\" objectives of such clauses. After this review a framework was designed to facilitate the analysis of the relationship of escalation provisions and price level uncertainty. The specific model employed examined interacting objectives of the government and a firm in a sole-source contract negotiation scenario. A method was developed to approximate the increase in contract price required by the firm as compensation for accepting the risk of uncertain price levels. A criterion was established for the employment of the escalation provision in the modeled scenario."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/escalationprovis1094516994"]},{"key":"dc:title","label":"Title","values":["Escalation provisions in DoD procurement: a review of the problem and a framework for analysis."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Block, M.K."],"dc:contributor.department":["Operations Research and Administrative Sciences"],"dc:creator":["Eberth, Robert William"],"dc:date.accessioned":["2012-11-13T23:58:48Z"],"dc:date.available":["2012-11-13T23:58:48Z"],"dc:date.issued":["1974-12"],"dc:description.abstract":["This study reviewed the opinions and concerns expressed by various government and private industry sources with regard to the use and structure of escalation (i.e., economic price adjustment) provisions in government procurement contracting. There was found to be little general agreement among these sources on many of the aspects of escalation provisions, including the \"proper\" objectives of such clauses. After this review a framework was designed to facilitate the analysis of the relationship of escalation provisions and price level uncertainty. The specific model employed examined interacting objectives of the government and a firm in a sole-source contract negotiation scenario. A method was developed to approximate the increase in contract price required by the firm as compensation for accepting the risk of uncertain price levels. A criterion was established for the employment of the escalation provision in the modeled scenario."],"dc:description.uri":["http://archive.org/details/escalationprovis1094516994"],"dc:identifier.uri":["https://hdl.handle.net/10945/16994"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["b5a5a05c-9086-4e0f-adfd-321343da76ec"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Escalation","Economic Price Adjustment","Contingencies"],"dc:title":["Escalation provisions in DoD procurement: a review of the problem and a framework for analysis."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:06:26Z"}