{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/17396"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/17396","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Network Vulnerability Assessment of the U.S. Crude Pipeline Infrastructure","abstract":"The potential for cascade failure of the U.S. crude oil pipeline infrastructure is analyzed using Model Based Risk Assessment software. The pipeline system that distributes crude oil to refineries across the United States has gained much media attention with President Obamas denial of a permit to complete a key portion the Keystone-XL pipeline that will carry oil from Alberta, Canada to the Cushing Oil Trading Hub (COTH) in Cushing, OK. The analysis identified the COTH as the primary critical hub. The COTH is one of the worlds major oil terminals. A disruption of the COTH, Midwest/West Coast oil distribution networks, or critical hubs would have far-reaching negative consequences affecting global trade. The analysis also identified regional differences in network resiliency and susceptibility to cascade failure. Protecting all 55,000 miles of the U.S. crude oil pipeline infrastructure from catastrophic failure is an unachievable goal, but protection of the network from cascade failure and a Black Swan event can be achieved by protecting network hubs. The results of this analysis should be used as a starting point to increase network resiliency and prioritize the use of resources to secure the crude oil pipeline network against cascade failure.","abstract_html":"The potential for cascade failure of the U.S. crude oil pipeline infrastructure is analyzed using Model Based Risk Assessment software. The pipeline system that distributes crude oil to refineries across the United States has gained much media attention with President Obamas denial of a permit to complete a key portion the Keystone-XL pipeline that will carry oil from Alberta, Canada to the Cushing Oil Trading Hub (COTH) in Cushing, OK. The analysis identified the COTH as the primary critical hub. The COTH is one of the worlds major oil terminals. A disruption of the COTH, Midwest/West Coast oil distribution networks, or critical hubs would have far-reaching negative consequences affecting global trade. The analysis also identified regional differences in network resiliency and susceptibility to cascade failure. Protecting all 55,000 miles of the U.S. crude oil pipeline infrastructure from catastrophic failure is an unachievable goal, but protection of the network from cascade failure and a Black Swan event can be achieved by protecting network hubs. The results of this analysis should be used as a starting point to increase network resiliency and prioritize the use of resources to secure the crude oil pipeline network against cascade failure.","abstract_has_math":false,"creators":["Larranaga, Michael D."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Arts in Security Studies (Homeland Security and Defense)","degree_level":"Masters","degree_discipline":"Security Studies (Homeland Security And Defense)","degree_department":"National Security Affairs (CHDS)","school":null,"contributors":[],"advisors":["Darken, Rudy","Lewis, Ted"],"committee_chairs":[],"committee_members":[],"year":2012,"date_issued":"2012-09","date_published":"2012-09","updated_at":"2026-11-19T06:06:58Z","subjects":[],"languages":[],"rights":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/17396","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/17396","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F17396","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F17396","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Darken, Rudy","Lewis, Ted"]},{"key":"dc:contributor.department","label":"Department","values":["National Security Affairs (CHDS)"]},{"key":"dc:creator","label":"Author","values":["Larranaga, Michael D."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-14T00:02:44Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-14T00:02:44Z"]},{"key":"dc:date.issued","label":"Date","values":["2012-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["e769687a-13cb-4eed-90f8-88ecc27b5855"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Security Studies (Homeland Security And Defense)"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Arts in Security Studies (Homeland Security and Defense)"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Critical Infrastructure","Crude Oil Pipeline","Probable Maximum Loss","Model Based Risk Analysis","Risk Assessment","Risk Management","Black Swan","Network Analysis","Fat Tail","Simulation","Pipeline Safety","Safety Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/17396"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The potential for cascade failure of the U.S. crude oil pipeline infrastructure is analyzed using Model Based Risk Assessment software. The pipeline system that distributes crude oil to refineries across the United States has gained much media attention with President Obamas denial of a permit to complete a key portion the Keystone-XL pipeline that will carry oil from Alberta, Canada to the Cushing Oil Trading Hub (COTH) in Cushing, OK. The analysis identified the COTH as the primary critical hub. The COTH is one of the worlds major oil terminals. A disruption of the COTH, Midwest/West Coast oil distribution networks, or critical hubs would have far-reaching negative consequences affecting global trade. The analysis also identified regional differences in network resiliency and susceptibility to cascade failure. Protecting all 55,000 miles of the U.S. crude oil pipeline infrastructure from catastrophic failure is an unachievable goal, but protection of the network from cascade failure and a Black Swan event can be achieved by protecting network hubs. The results of this analysis should be used as a starting point to increase network resiliency and prioritize the use of resources to secure the crude oil pipeline network against cascade failure."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/networkvulnerabi1094517396"]},{"key":"dc:title","label":"Title","values":["Network Vulnerability Assessment of the U.S. Crude Pipeline Infrastructure"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Simplex Professor, School of Fire Protection and Safety-Oklahoma State University, Stillwater, Oklahoma"]}]}],"canonical_facts":{"dc:contributor.advisor":["Darken, Rudy","Lewis, Ted"],"dc:contributor.department":["National Security Affairs (CHDS)"],"dc:creator":["Larranaga, Michael D."],"dc:date.accessioned":["2012-11-14T00:02:44Z"],"dc:date.available":["2012-11-14T00:02:44Z"],"dc:date.issued":["2012-09"],"dc:description.abstract":["The potential for cascade failure of the U.S. crude oil pipeline infrastructure is analyzed using Model Based Risk Assessment software. The pipeline system that distributes crude oil to refineries across the United States has gained much media attention with President Obamas denial of a permit to complete a key portion the Keystone-XL pipeline that will carry oil from Alberta, Canada to the Cushing Oil Trading Hub (COTH) in Cushing, OK. The analysis identified the COTH as the primary critical hub. The COTH is one of the worlds major oil terminals. A disruption of the COTH, Midwest/West Coast oil distribution networks, or critical hubs would have far-reaching negative consequences affecting global trade. The analysis also identified regional differences in network resiliency and susceptibility to cascade failure. Protecting all 55,000 miles of the U.S. crude oil pipeline infrastructure from catastrophic failure is an unachievable goal, but protection of the network from cascade failure and a Black Swan event can be achieved by protecting network hubs. The results of this analysis should be used as a starting point to increase network resiliency and prioritize the use of resources to secure the crude oil pipeline network against cascade failure."],"dc:description.uri":["http://archive.org/details/networkvulnerabi1094517396"],"dc:identifier.uri":["https://hdl.handle.net/10945/17396"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["e769687a-13cb-4eed-90f8-88ecc27b5855"],"dc:rights":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Critical Infrastructure","Crude Oil Pipeline","Probable Maximum Loss","Model Based Risk Analysis","Risk Assessment","Risk Management","Black Swan","Network Analysis","Fat Tail","Simulation","Pipeline Safety","Safety Management"],"dc:title":["Network Vulnerability Assessment of the U.S. Crude Pipeline Infrastructure"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Simplex Professor, School of Fire Protection and Safety-Oklahoma State University, Stillwater, Oklahoma"],"thesis:degree_discipline":["Security Studies (Homeland Security And Defense)"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Arts in Security Studies (Homeland Security and Defense)"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:06:58Z"}