{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/17608"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/17608","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Identification of causes and analysis of techniques for reducing delinquent deliveries in Department of Defense production contracts","abstract":"Approximately one in four Department of Defense production contracts are being carried in a delinquent status. These late deliveries have a value of several billion dollars, and eighty percent of the delinquent contracts are over ninety days late. The impact of these last deliveries affects many military organizations in a variety of ways. The causes of delinquency stem from actions of the Government and of the contractor. The Government attempts to use a number of incentives to motivate the contractor to provide timely delivery of the required items. It also utilizes a variety of procedures in an attempt to control and reduce the number of delinquent contracts. Yet a significant portion of the contracts are delinquent. The objective of this research effort was to provide a survey study of the delinquency problem, with a particular view of stimulating further in-depth research into its various aspects.","abstract_html":"Approximately one in four Department of Defense production contracts are being carried in a delinquent status. These late deliveries have a value of several billion dollars, and eighty percent of the delinquent contracts are over ninety days late. The impact of these last deliveries affects many military organizations in a variety of ways. The causes of delinquency stem from actions of the Government and of the contractor. The Government attempts to use a number of incentives to motivate the contractor to provide timely delivery of the required items. It also utilizes a variety of procedures in an attempt to control and reduce the number of delinquent contracts. Yet a significant portion of the contracts are delinquent. The objective of this research effort was to provide a survey study of the delinquency problem, with a particular view of stimulating further in-depth research into its various aspects.","abstract_has_math":false,"creators":["Dunbar, Glen Berry, III"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Lamm, David V."],"committee_chairs":[],"committee_members":["Boger, Dan C."],"year":1980,"date_issued":"1980-12","date_published":"1980-12","updated_at":"2026-11-26T00:16:00Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/17608","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/17608","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F17608","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F17608","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Lamm, David V."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Boger, Dan C."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Dunbar, Glen Berry, III"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1980"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-16T18:30:48Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-16T18:30:48Z"]},{"key":"dc:date.issued","label":"Date","values":["1980-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Delinquent deliveries","Schedule incentives","Late deliveries","Schedule changes"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/17608"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Approximately one in four Department of Defense production contracts are being carried in a delinquent status. These late deliveries have a value of several billion dollars, and eighty percent of the delinquent contracts are over ninety days late. The impact of these last deliveries affects many military organizations in a variety of ways. The causes of delinquency stem from actions of the Government and of the contractor. The Government attempts to use a number of incentives to motivate the contractor to provide timely delivery of the required items. It also utilizes a variety of procedures in an attempt to control and reduce the number of delinquent contracts. Yet a significant portion of the contracts are delinquent. The objective of this research effort was to provide a survey study of the delinquency problem, with a particular view of stimulating further in-depth research into its various aspects."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/identificationof1094517608"]},{"key":"dc:title","label":"Title","values":["Identification of causes and analysis of techniques for reducing delinquent deliveries in Department of Defense production contracts"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Captain, United States Army"]}]}],"canonical_facts":{"dc:contributor.advisor":["Lamm, David V."],"dc:contributor.committeemember":["Boger, Dan C."],"dc:contributor.department":["Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Dunbar, Glen Berry, III"],"dc:date":["December 1980"],"dc:date.accessioned":["2012-11-16T18:30:48Z"],"dc:date.available":["2012-11-16T18:30:48Z"],"dc:date.issued":["1980-12"],"dc:description.abstract":["Approximately one in four Department of Defense production contracts are being carried in a delinquent status. These late deliveries have a value of several billion dollars, and eighty percent of the delinquent contracts are over ninety days late. The impact of these last deliveries affects many military organizations in a variety of ways. The causes of delinquency stem from actions of the Government and of the contractor. The Government attempts to use a number of incentives to motivate the contractor to provide timely delivery of the required items. It also utilizes a variety of procedures in an attempt to control and reduce the number of delinquent contracts. Yet a significant portion of the contracts are delinquent. The objective of this research effort was to provide a survey study of the delinquency problem, with a particular view of stimulating further in-depth research into its various aspects."],"dc:description.uri":["http://archive.org/details/identificationof1094517608"],"dc:identifier.uri":["https://hdl.handle.net/10945/17608"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Delinquent deliveries","Schedule incentives","Late deliveries","Schedule changes"],"dc:subject.lcsh":["Management"],"dc:title":["Identification of causes and analysis of techniques for reducing delinquent deliveries in Department of Defense production contracts"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Captain, United States Army"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-26T00:16:00Z"}