{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/17649"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/17649","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"OMB A-76 : full costing and its impact at installation level within the U.S. Army.","abstract":"This thesis evaluates the methods for accumulating costs attributable to the overhead pools of an Army in-house estimate for Government performance of Commercial or Industrial Type Activities (CITA) . The full costing requirement of Office of Management and Budget (OMB A-76) of March 1979 is investigated vis-a-vis its impact at the installation level within the Army. Initial discussion addresses the evolution of the comparative cost analysis as a basis for in-house operation of a CITA function and explores the guidance provided by OMB, the Department of Defense, and the Department of the Army (DA). The concept of \"full cost\" was reviewed as used by private industry. A case was developed around Government contractors/ and nonprofit organizations. A major DA installation was used to illustrate the cost accumulation process and sources of cost data available to a typical DA installation. It was concluded that collection of relevant cost data to support CITA cost analysis was unnecessarily tedious and time consuming; and two steps were recommended to improve this process.","abstract_html":"This thesis evaluates the methods for accumulating costs attributable to the overhead pools of an Army in-house estimate for Government performance of Commercial or Industrial Type Activities (CITA) . The full costing requirement of Office of Management and Budget (OMB A-76) of March 1979 is investigated vis-a-vis its impact at the installation level within the Army. Initial discussion addresses the evolution of the comparative cost analysis as a basis for in-house operation of a CITA function and explores the guidance provided by OMB, the Department of Defense, and the Department of the Army (DA). The concept of &quot;full cost&quot; was reviewed as used by private industry. A case was developed around Government contractors/ and nonprofit organizations. A major DA installation was used to illustrate the cost accumulation process and sources of cost data available to a typical DA installation. It was concluded that collection of relevant cost data to support CITA cost analysis was unnecessarily tedious and time consuming; and two steps were recommended to improve this process.","abstract_has_math":false,"creators":["Hintze, Grant G."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Bobulinski, R.A."],"committee_chairs":[],"committee_members":["Liao, Shu S."],"year":1980,"date_issued":"1980-09","date_published":"1980-09","updated_at":"2026-11-20T22:20:15Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/17649","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/17649","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F17649","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F17649","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Bobulinski, R.A."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Liao, Shu S."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Hintze, Grant G."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["September 1980"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-16T18:31:14Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-16T18:31:14Z"]},{"key":"dc:date.issued","label":"Date","values":["1980-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["OMB circular no. A-76","make-or-buy","contracted services","service contracting","commercial and industrial type activities","CITA","cost comparisons","full costing","overhead","cost collection","indirect costs"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/17649"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis evaluates the methods for accumulating costs attributable to the overhead pools of an Army in-house estimate for Government performance of Commercial or Industrial Type Activities (CITA) . The full costing requirement of Office of Management and Budget (OMB A-76) of March 1979 is investigated vis-a-vis its impact at the installation level within the Army. Initial discussion addresses the evolution of the comparative cost analysis as a basis for in-house operation of a CITA function and explores the guidance provided by OMB, the Department of Defense, and the Department of the Army (DA). The concept of \"full cost\" was reviewed as used by private industry. A case was developed around Government contractors/ and nonprofit organizations. A major DA installation was used to illustrate the cost accumulation process and sources of cost data available to a typical DA installation. It was concluded that collection of relevant cost data to support CITA cost analysis was unnecessarily tedious and time consuming; and two steps were recommended to improve this process."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/ombafullcostingn1094517649"]},{"key":"dc:title","label":"Title","values":["OMB A-76 : full costing and its impact at installation level within the U.S. Army."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Captain, United States Army"]}]}],"canonical_facts":{"dc:contributor.advisor":["Bobulinski, R.A."],"dc:contributor.committeemember":["Liao, Shu S."],"dc:contributor.department":["Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Hintze, Grant G."],"dc:date":["September 1980"],"dc:date.accessioned":["2012-11-16T18:31:14Z"],"dc:date.available":["2012-11-16T18:31:14Z"],"dc:date.issued":["1980-09"],"dc:description.abstract":["This thesis evaluates the methods for accumulating costs attributable to the overhead pools of an Army in-house estimate for Government performance of Commercial or Industrial Type Activities (CITA) . The full costing requirement of Office of Management and Budget (OMB A-76) of March 1979 is investigated vis-a-vis its impact at the installation level within the Army. Initial discussion addresses the evolution of the comparative cost analysis as a basis for in-house operation of a CITA function and explores the guidance provided by OMB, the Department of Defense, and the Department of the Army (DA). The concept of \"full cost\" was reviewed as used by private industry. A case was developed around Government contractors/ and nonprofit organizations. A major DA installation was used to illustrate the cost accumulation process and sources of cost data available to a typical DA installation. It was concluded that collection of relevant cost data to support CITA cost analysis was unnecessarily tedious and time consuming; and two steps were recommended to improve this process."],"dc:description.uri":["http://archive.org/details/ombafullcostingn1094517649"],"dc:identifier.uri":["https://hdl.handle.net/10945/17649"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["OMB circular no. A-76","make-or-buy","contracted services","service contracting","commercial and industrial type activities","CITA","cost comparisons","full costing","overhead","cost collection","indirect costs"],"dc:subject.lcsh":["Management"],"dc:title":["OMB A-76 : full costing and its impact at installation level within the U.S. Army."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Captain, United States Army"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-20T22:20:15Z"}