{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/17712"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/17712","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A construction Superintendent's project monitoring system","abstract":"Computerized methods have not been widely accepted by the construction industry with regard to project cost control and scheduling. As computer technology advances and the economic pressures on contractors increase, it will become apparent that a unified management information system will be needed to adequately control a large to medium size construction company. A project monitoring system is developed which applies management information theory to the practical problem of providing a construction Superintendent with a usable computerized schedule.","abstract_html":"Computerized methods have not been widely accepted by the construction industry with regard to project cost control and scheduling. As computer technology advances and the economic pressures on contractors increase, it will become apparent that a unified management information system will be needed to adequately control a large to medium size construction company. A project monitoring system is developed which applies management information theory to the practical problem of providing a construction Superintendent with a usable computerized schedule.","abstract_has_math":false,"creators":["Bromilow, Neil Frank"],"institution":"Pennsylvania State University","degree_name":"M.S. in Architectural Engineering","degree_level":"Masters","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["McLaughlin, Everett R.","Albright, Gifford H."],"committee_chairs":[],"committee_members":[],"year":1976,"date_issued":"1976-08","date_published":"1976-08","updated_at":"2026-11-19T06:07:50Z","subjects":[],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/17712","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/17712","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F17712","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F17712","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["McLaughlin, Everett R.","Albright, Gifford H."]},{"key":"dc:creator","label":"Author","values":["Bromilow, Neil Frank"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-16T18:47:09Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-16T18:47:09Z"]},{"key":"dc:date.issued","label":"Date","values":["1976-08"]},{"key":"dc:publisher","label":"Institution","values":["Pennsylvania State University"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Architectural Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Pennsylvania State University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Project Management","Construction Superintendent","Critical Path","Scheduling","Management Information System","Cost Control"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/17712"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Computerized methods have not been widely accepted by the construction industry with regard to project cost control and scheduling. As computer technology advances and the economic pressures on contractors increase, it will become apparent that a unified management information system will be needed to adequately control a large to medium size construction company. A project monitoring system is developed which applies management information theory to the practical problem of providing a construction Superintendent with a usable computerized schedule."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/aconstructionsup1094517712"]},{"key":"dc:title","label":"Title","values":["A construction Superintendent's project monitoring system"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["McLaughlin, Everett R.","Albright, Gifford H."],"dc:creator":["Bromilow, Neil Frank"],"dc:date.accessioned":["2012-11-16T18:47:09Z"],"dc:date.available":["2012-11-16T18:47:09Z"],"dc:date.issued":["1976-08"],"dc:description.abstract":["Computerized methods have not been widely accepted by the construction industry with regard to project cost control and scheduling. As computer technology advances and the economic pressures on contractors increase, it will become apparent that a unified management information system will be needed to adequately control a large to medium size construction company. A project monitoring system is developed which applies management information theory to the practical problem of providing a construction Superintendent with a usable computerized schedule."],"dc:description.uri":["http://archive.org/details/aconstructionsup1094517712"],"dc:identifier.uri":["https://hdl.handle.net/10945/17712"],"dc:publisher":["Pennsylvania State University"],"dc:subject.keyword":["Project Management","Construction Superintendent","Critical Path","Scheduling","Management Information System","Cost Control"],"dc:title":["A construction Superintendent's project monitoring system"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Architectural Engineering"],"thesis:institution_name":["Pennsylvania State University"]},"updated_at":"2026-11-19T06:07:50Z"}