{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/17875"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/17875","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A normative view of the pre-overhaul planning process.","abstract":"This paper derives from the author's understanding and appreciation of the importance of the various events in the Pre-Overhaul Planning Phase. This thesis describes the Pre-Overhaul Planning Process for a destroyer type ship scheduled for overhaul at a naval shipyard. The Pre-Overhaul Planning Process is then examined from a normative viewpoint which concurrently provides a basic framework for the decision maker to utilize in the detailed analysis of each component of the overhaul repair work package. In conducting this detailed analysis, numerous tradeoffs are required between the overhaul objective, the constraints and the resources available to accomplish the overhaul repairs. The environment the decision-maker encounters in the Pre- Overhaul Planning Process is also described. By presenting how the Pre-Overhaul Planning System works, how it should work and the environment that must be contended with, this thesis will lead to an increased awareness of the requirements and the importance of Pre- Overhaul Planning.","abstract_html":"This paper derives from the author&#x27;s understanding and appreciation of the importance of the various events in the Pre-Overhaul Planning Phase. This thesis describes the Pre-Overhaul Planning Process for a destroyer type ship scheduled for overhaul at a naval shipyard. The Pre-Overhaul Planning Process is then examined from a normative viewpoint which concurrently provides a basic framework for the decision maker to utilize in the detailed analysis of each component of the overhaul repair work package. In conducting this detailed analysis, numerous tradeoffs are required between the overhaul objective, the constraints and the resources available to accomplish the overhaul repairs. The environment the decision-maker encounters in the Pre- Overhaul Planning Process is also described. By presenting how the Pre-Overhaul Planning System works, how it should work and the environment that must be contended with, this thesis will lead to an increased awareness of the requirements and the importance of Pre- Overhaul Planning.","abstract_has_math":false,"creators":["House, Michael Edward"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Sovereign, Michael D."],"committee_chairs":[],"committee_members":["Buttinger, James D."],"year":1976,"date_issued":"1976-09","date_published":"1976-09","updated_at":"2026-11-20T22:12:57Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/17875","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/17875","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F17875","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Sovereign, Michael D."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Buttinger, James D."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["House, Michael Edward"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["September 1976"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-16T18:48:25Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-16T18:48:25Z"]},{"key":"dc:date.issued","label":"Date","values":["1976-09"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["pre-overhaul planning","shipyard overhaul","maintenance planning","maintenance management"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/17875"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This paper derives from the author's understanding and appreciation of the importance of the various events in the Pre-Overhaul Planning Phase. This thesis describes the Pre-Overhaul Planning Process for a destroyer type ship scheduled for overhaul at a naval shipyard. The Pre-Overhaul Planning Process is then examined from a normative viewpoint which concurrently provides a basic framework for the decision maker to utilize in the detailed analysis of each component of the overhaul repair work package. In conducting this detailed analysis, numerous tradeoffs are required between the overhaul objective, the constraints and the resources available to accomplish the overhaul repairs. The environment the decision-maker encounters in the Pre- Overhaul Planning Process is also described. By presenting how the Pre-Overhaul Planning System works, how it should work and the environment that must be contended with, this thesis will lead to an increased awareness of the requirements and the importance of Pre- Overhaul Planning."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/anormativeviewof1094517875"]},{"key":"dc:title","label":"Title","values":["A normative view of the pre-overhaul planning process."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Sovereign, Michael D."],"dc:contributor.committeemember":["Buttinger, James D."],"dc:contributor.department":["Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["House, Michael Edward"],"dc:date":["September 1976"],"dc:date.accessioned":["2012-11-16T18:48:25Z"],"dc:date.available":["2012-11-16T18:48:25Z"],"dc:date.issued":["1976-09"],"dc:description.abstract":["This paper derives from the author's understanding and appreciation of the importance of the various events in the Pre-Overhaul Planning Phase. This thesis describes the Pre-Overhaul Planning Process for a destroyer type ship scheduled for overhaul at a naval shipyard. The Pre-Overhaul Planning Process is then examined from a normative viewpoint which concurrently provides a basic framework for the decision maker to utilize in the detailed analysis of each component of the overhaul repair work package. In conducting this detailed analysis, numerous tradeoffs are required between the overhaul objective, the constraints and the resources available to accomplish the overhaul repairs. The environment the decision-maker encounters in the Pre- Overhaul Planning Process is also described. By presenting how the Pre-Overhaul Planning System works, how it should work and the environment that must be contended with, this thesis will lead to an increased awareness of the requirements and the importance of Pre- Overhaul Planning."],"dc:description.uri":["http://archive.org/details/anormativeviewof1094517875"],"dc:identifier.uri":["https://hdl.handle.net/10945/17875"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["pre-overhaul planning","shipyard overhaul","maintenance planning","maintenance management"],"dc:subject.lcsh":["Management"],"dc:title":["A normative view of the pre-overhaul planning process."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-20T22:12:57Z"}