{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/17953"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/17953","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A statistical analysis of the effectiveness of program initial conditions as predictors of weapon system acquisition program success","abstract":"This thesis examines the relationship between weapon system acquisition program's initial conditions (project size, technical risk and program length) and program outcomes in the areas of cost, performance and schedule. The study employs a nonparametric correlation procedure and Mann-Whitney U Tests as the principal analytic tools of the examination process. The results of the analysis indicate that a definite relationship between cost/schedule growth and program size exists. In a significant number of cases, large programs incurred greater absolute cost growth with less schedule slippage than did programs of smaller size. The variance in project technical performance is largely unexplained by the methodology, although there are indications that it is related inversely to program length.","abstract_html":"This thesis examines the relationship between weapon system acquisition program&#x27;s initial conditions (project size, technical risk and program length) and program outcomes in the areas of cost, performance and schedule. The study employs a nonparametric correlation procedure and Mann-Whitney U Tests as the principal analytic tools of the examination process. The results of the analysis indicate that a definite relationship between cost/schedule growth and program size exists. In a significant number of cases, large programs incurred greater absolute cost growth with less schedule slippage than did programs of smaller size. The variance in project technical performance is largely unexplained by the methodology, although there are indications that it is related inversely to program length.","abstract_has_math":false,"creators":["Henry, Douglas Davies"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Applied Science","degree_level":"Masters","degree_discipline":"Applied Science","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Eoyang, Carson K."],"committee_chairs":[],"committee_members":["Sovereign, Michael G."],"year":1976,"date_issued":"1976-12","date_published":"1976-12","updated_at":"2026-11-20T22:18:15Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/17953","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/17953","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F17953","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F17953","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Eoyang, Carson K."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Sovereign, Michael G."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Henry, Douglas Davies"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1976"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-16T18:49:06Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-16T18:49:06Z"]},{"key":"dc:date.issued","label":"Date","values":["1976-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Applied Science"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Applied Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Weapons systems acquisition management"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/17953"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis examines the relationship between weapon system acquisition program's initial conditions (project size, technical risk and program length) and program outcomes in the areas of cost, performance and schedule. The study employs a nonparametric correlation procedure and Mann-Whitney U Tests as the principal analytic tools of the examination process. The results of the analysis indicate that a definite relationship between cost/schedule growth and program size exists. In a significant number of cases, large programs incurred greater absolute cost growth with less schedule slippage than did programs of smaller size. The variance in project technical performance is largely unexplained by the methodology, although there are indications that it is related inversely to program length."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/astatisticalnaly1094517953"]},{"key":"dc:title","label":"Title","values":["A statistical analysis of the effectiveness of program initial conditions as predictors of weapon system acquisition program success"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Eoyang, Carson K."],"dc:contributor.committeemember":["Sovereign, Michael G."],"dc:contributor.department":["Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Henry, Douglas Davies"],"dc:date":["December 1976"],"dc:date.accessioned":["2012-11-16T18:49:06Z"],"dc:date.available":["2012-11-16T18:49:06Z"],"dc:date.issued":["1976-12"],"dc:description.abstract":["This thesis examines the relationship between weapon system acquisition program's initial conditions (project size, technical risk and program length) and program outcomes in the areas of cost, performance and schedule. The study employs a nonparametric correlation procedure and Mann-Whitney U Tests as the principal analytic tools of the examination process. The results of the analysis indicate that a definite relationship between cost/schedule growth and program size exists. In a significant number of cases, large programs incurred greater absolute cost growth with less schedule slippage than did programs of smaller size. The variance in project technical performance is largely unexplained by the methodology, although there are indications that it is related inversely to program length."],"dc:description.uri":["http://archive.org/details/astatisticalnaly1094517953"],"dc:identifier.uri":["https://hdl.handle.net/10945/17953"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Weapons systems acquisition management"],"dc:subject.lcsh":["Management"],"dc:title":["A statistical analysis of the effectiveness of program initial conditions as predictors of weapon system acquisition program success"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Applied Science"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Applied Science"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-20T22:18:15Z"}