{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/18011"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/18011","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An analysis of maintenance factors on selected U.S. Navy ships.","abstract":"This study examined certain reported maintenance factors to better understand how they influence the accomplishment of shipboard maintenance in cruisers and guided missile destroyers. The data was generated by the Equipment Maintenance and Related Maintenance (EMRM) Project, Pacific, and other reports normally submitted by the ships. Though part of the data was broken down to work center level, this research did not go below the ship level. This study showed 1) how the accomplishment of preventive maintenance varied as additional maintenance requirements were scheduled; 2) how the accomplishment of preventive versus corrective maintenance changed as funds for repair parts were increased; and 3) how the ships' employment schedules affected their accomplishment of shipboard maintenance Additionally, an hypothesis test was used to show that there was a difference in the maintenance activity of the EMRM test group ships compared to the EMRM control group ships.","abstract_html":"This study examined certain reported maintenance factors to better understand how they influence the accomplishment of shipboard maintenance in cruisers and guided missile destroyers. The data was generated by the Equipment Maintenance and Related Maintenance (EMRM) Project, Pacific, and other reports normally submitted by the ships. Though part of the data was broken down to work center level, this research did not go below the ship level. This study showed 1) how the accomplishment of preventive maintenance varied as additional maintenance requirements were scheduled; 2) how the accomplishment of preventive versus corrective maintenance changed as funds for repair parts were increased; and 3) how the ships&#x27; employment schedules affected their accomplishment of shipboard maintenance Additionally, an hypothesis test was used to show that there was a difference in the maintenance activity of the EMRM test group ships compared to the EMRM control group ships.","abstract_has_math":false,"creators":["Grigsby, Jerry Carson"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Operations Research","school":null,"contributors":[],"advisors":["Sovereign, M.G."],"committee_chairs":[],"committee_members":["Hartman, James K."],"year":1977,"date_issued":"1977","date_published":"1977","updated_at":"2026-11-21T22:31:47Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/18011","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/18011","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F18011","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F18011","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Sovereign, M.G."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Hartman, James K."]},{"key":"dc:contributor.department","label":"Department","values":["Operations Research"]},{"key":"dc:creator","label":"Author","values":["Grigsby, Jerry Carson"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["June 1977"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-16T19:13:46Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-16T19:13:46Z"]},{"key":"dc:date.issued","label":"Date","values":["1977"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["maintenance factors","shipboard maintenance","preventive maintenance","EMRM Project"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/18011"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This study examined certain reported maintenance factors to better understand how they influence the accomplishment of shipboard maintenance in cruisers and guided missile destroyers. The data was generated by the Equipment Maintenance and Related Maintenance (EMRM) Project, Pacific, and other reports normally submitted by the ships. Though part of the data was broken down to work center level, this research did not go below the ship level. This study showed 1) how the accomplishment of preventive maintenance varied as additional maintenance requirements were scheduled; 2) how the accomplishment of preventive versus corrective maintenance changed as funds for repair parts were increased; and 3) how the ships' employment schedules affected their accomplishment of shipboard maintenance Additionally, an hypothesis test was used to show that there was a difference in the maintenance activity of the EMRM test group ships compared to the EMRM control group ships."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/annalysisofmaint1094518011"]},{"key":"dc:title","label":"Title","values":["An analysis of maintenance factors on selected U.S. Navy ships."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Sovereign, M.G."],"dc:contributor.committeemember":["Hartman, James K."],"dc:contributor.department":["Operations Research"],"dc:creator":["Grigsby, Jerry Carson"],"dc:date":["June 1977"],"dc:date.accessioned":["2012-11-16T19:13:46Z"],"dc:date.available":["2012-11-16T19:13:46Z"],"dc:date.issued":["1977"],"dc:description.abstract":["This study examined certain reported maintenance factors to better understand how they influence the accomplishment of shipboard maintenance in cruisers and guided missile destroyers. The data was generated by the Equipment Maintenance and Related Maintenance (EMRM) Project, Pacific, and other reports normally submitted by the ships. Though part of the data was broken down to work center level, this research did not go below the ship level. This study showed 1) how the accomplishment of preventive maintenance varied as additional maintenance requirements were scheduled; 2) how the accomplishment of preventive versus corrective maintenance changed as funds for repair parts were increased; and 3) how the ships' employment schedules affected their accomplishment of shipboard maintenance Additionally, an hypothesis test was used to show that there was a difference in the maintenance activity of the EMRM test group ships compared to the EMRM control group ships."],"dc:description.uri":["http://archive.org/details/annalysisofmaint1094518011"],"dc:identifier.uri":["https://hdl.handle.net/10945/18011"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["maintenance factors","shipboard maintenance","preventive maintenance","EMRM Project"],"dc:title":["An analysis of maintenance factors on selected U.S. Navy ships."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:31:47Z"}