{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/18020"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/18020","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An analysis of a zero-base budgeting system implementation at a U.S. Naval activity.","abstract":"This study evolved from a series of zero-base budgeting seminars given by Naval Postgraduate School at Naval Weapons Center, China Lake during the summer of 1977. Using a survey questionnaire as a data base, the analysis compares the actual problems of implementation with the theoretical problems of implementation. The study includes a brief outline of zero-base budgeting theory and a detailed outline of the theoretical problems of implementation. The study concluded that the problems encountered by China Lake had already been adequately described in theory and that the dominant problem categories experienced were those of Administrative, Planning Assumption, Top Management, Time, and Behavioral. The study also concluded that initial efforts of top management to use the cost-cutting feature of zero-base budgeting, which predisposed a significant portion of the management and staff population against the system, affected negatively its later, full-scale implementation.","abstract_html":"This study evolved from a series of zero-base budgeting seminars given by Naval Postgraduate School at Naval Weapons Center, China Lake during the summer of 1977. Using a survey questionnaire as a data base, the analysis compares the actual problems of implementation with the theoretical problems of implementation. The study includes a brief outline of zero-base budgeting theory and a detailed outline of the theoretical problems of implementation. The study concluded that the problems encountered by China Lake had already been adequately described in theory and that the dominant problem categories experienced were those of Administrative, Planning Assumption, Top Management, Time, and Behavioral. The study also concluded that initial efforts of top management to use the cost-cutting feature of zero-base budgeting, which predisposed a significant portion of the management and staff population against the system, affected negatively its later, full-scale implementation.","abstract_has_math":false,"creators":["Heaivilin, Gale Eugene"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Robertson, James Clay"],"committee_chairs":[],"committee_members":[],"year":1977,"date_issued":"1977-12","date_published":"1977-12","updated_at":"2026-11-21T23:24:54Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/18020","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/18020","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F18020","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F18020","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Robertson, James Clay"]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Heaivilin, Gale Eugene"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1977"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-16T19:13:53Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-16T19:13:53Z"]},{"key":"dc:date.issued","label":"Date","values":["1977-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["zero-base budgeting"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/18020"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This study evolved from a series of zero-base budgeting seminars given by Naval Postgraduate School at Naval Weapons Center, China Lake during the summer of 1977. Using a survey questionnaire as a data base, the analysis compares the actual problems of implementation with the theoretical problems of implementation. The study includes a brief outline of zero-base budgeting theory and a detailed outline of the theoretical problems of implementation. The study concluded that the problems encountered by China Lake had already been adequately described in theory and that the dominant problem categories experienced were those of Administrative, Planning Assumption, Top Management, Time, and Behavioral. The study also concluded that initial efforts of top management to use the cost-cutting feature of zero-base budgeting, which predisposed a significant portion of the management and staff population against the system, affected negatively its later, full-scale implementation."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/annalysisofzerob1094518020"]},{"key":"dc:title","label":"Title","values":["An analysis of a zero-base budgeting system implementation at a U.S. Naval activity."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Major, United States Marine Corps"]}]}],"canonical_facts":{"dc:contributor.advisor":["Robertson, James Clay"],"dc:contributor.department":["Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Heaivilin, Gale Eugene"],"dc:date":["December 1977"],"dc:date.accessioned":["2012-11-16T19:13:53Z"],"dc:date.available":["2012-11-16T19:13:53Z"],"dc:date.issued":["1977-12"],"dc:description.abstract":["This study evolved from a series of zero-base budgeting seminars given by Naval Postgraduate School at Naval Weapons Center, China Lake during the summer of 1977. Using a survey questionnaire as a data base, the analysis compares the actual problems of implementation with the theoretical problems of implementation. The study includes a brief outline of zero-base budgeting theory and a detailed outline of the theoretical problems of implementation. The study concluded that the problems encountered by China Lake had already been adequately described in theory and that the dominant problem categories experienced were those of Administrative, Planning Assumption, Top Management, Time, and Behavioral. The study also concluded that initial efforts of top management to use the cost-cutting feature of zero-base budgeting, which predisposed a significant portion of the management and staff population against the system, affected negatively its later, full-scale implementation."],"dc:description.uri":["http://archive.org/details/annalysisofzerob1094518020"],"dc:identifier.uri":["https://hdl.handle.net/10945/18020"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["zero-base budgeting"],"dc:subject.lcsh":["Management"],"dc:title":["An analysis of a zero-base budgeting system implementation at a U.S. Naval activity."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Major, United States Marine Corps"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T23:24:54Z"}