{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/18033"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/18033","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Budget formulation and apportionment of the Shipbuilding and Conversion, Navy (SCN) appropriation.","abstract":"The budget process is the final phase in the Planning, Programming and Budgeting System (PPBS) . It is divided into three phases: Formulation, Justification and Execution. Of specific interest within the budget process is the Shipbuilding and Conversion, Navy Appropriation (SCN). This thesis describes the SCN budget formulation process along with the interaction of the Shipbuilding Cost Adjustment (SCA) review. The budget process for SCN is traced through to the President's budget and the Congress where the second phase, justification, occurs. After Congressional approval, the SCN appropriation is traced through the execution phase where Congressionally- appropriated funds are obligated and expended. Finally, some conclusions are made with respect to cost estimating and the SCN budget process.","abstract_html":"The budget process is the final phase in the Planning, Programming and Budgeting System (PPBS) . It is divided into three phases: Formulation, Justification and Execution. Of specific interest within the budget process is the Shipbuilding and Conversion, Navy Appropriation (SCN). This thesis describes the SCN budget formulation process along with the interaction of the Shipbuilding Cost Adjustment (SCA) review. The budget process for SCN is traced through to the President&#x27;s budget and the Congress where the second phase, justification, occurs. After Congressional approval, the SCN appropriation is traced through the execution phase where Congressionally- appropriated funds are obligated and expended. Finally, some conclusions are made with respect to cost estimating and the SCN budget process.","abstract_has_math":false,"creators":["Ebright, Arthur L."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Buttinger, J.D."],"committee_chairs":[],"committee_members":["Soverign, M.G."],"year":1977,"date_issued":"1977-03","date_published":"1977-03","updated_at":"2026-11-19T06:07:50Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/18033","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/18033","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F18033","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F18033","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Buttinger, J.D."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Soverign, M.G."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:creator","label":"Author","values":["Ebright, Arthur L."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-16T19:14:01Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-16T19:14:01Z"]},{"key":"dc:date.issued","label":"Date","values":["1977-03"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Shipbuilding","Conversion","Appropriation","Budget"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/18033"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The budget process is the final phase in the Planning, Programming and Budgeting System (PPBS) . It is divided into three phases: Formulation, Justification and Execution. Of specific interest within the budget process is the Shipbuilding and Conversion, Navy Appropriation (SCN). This thesis describes the SCN budget formulation process along with the interaction of the Shipbuilding Cost Adjustment (SCA) review. The budget process for SCN is traced through to the President's budget and the Congress where the second phase, justification, occurs. After Congressional approval, the SCN appropriation is traced through the execution phase where Congressionally- appropriated funds are obligated and expended. Finally, some conclusions are made with respect to cost estimating and the SCN budget process."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/budgetformulatio1094518033"]},{"key":"dc:title","label":"Title","values":["Budget formulation and apportionment of the Shipbuilding and Conversion, Navy (SCN) appropriation."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Buttinger, J.D."],"dc:contributor.committeemember":["Soverign, M.G."],"dc:contributor.department":["Administrative Sciences"],"dc:creator":["Ebright, Arthur L."],"dc:date.accessioned":["2012-11-16T19:14:01Z"],"dc:date.available":["2012-11-16T19:14:01Z"],"dc:date.issued":["1977-03"],"dc:description.abstract":["The budget process is the final phase in the Planning, Programming and Budgeting System (PPBS) . It is divided into three phases: Formulation, Justification and Execution. Of specific interest within the budget process is the Shipbuilding and Conversion, Navy Appropriation (SCN). This thesis describes the SCN budget formulation process along with the interaction of the Shipbuilding Cost Adjustment (SCA) review. The budget process for SCN is traced through to the President's budget and the Congress where the second phase, justification, occurs. After Congressional approval, the SCN appropriation is traced through the execution phase where Congressionally- appropriated funds are obligated and expended. Finally, some conclusions are made with respect to cost estimating and the SCN budget process."],"dc:description.uri":["http://archive.org/details/budgetformulatio1094518033"],"dc:identifier.uri":["https://hdl.handle.net/10945/18033"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:subject.keyword":["Shipbuilding","Conversion","Appropriation","Budget"],"dc:title":["Budget formulation and apportionment of the Shipbuilding and Conversion, Navy (SCN) appropriation."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:07:50Z"}