{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/18184"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/18184","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Life cycle cost analysis in building design","abstract":"Life cycle cost analysis has been a part of good architectural design for many years. It has received even greater attention as the energy crisis makes it more clear that architects and owners must plan with greater emphasis on life cycle cost (LCC) versus initial construction cost. This thesis investigates the formulas and procedures currently used and illustrates life cycle cost analysis as applied to building operating cost savings, maintenance cost savings, and savings on replacement of building components and systems. Included is a discussion of the Economic Building Performance Model now used by the Western Division Naval Facilities Command, and current federal agency efforts to apply LCC concepts to building design.","abstract_html":"Life cycle cost analysis has been a part of good architectural design for many years. It has received even greater attention as the energy crisis makes it more clear that architects and owners must plan with greater emphasis on life cycle cost (LCC) versus initial construction cost. This thesis investigates the formulas and procedures currently used and illustrates life cycle cost analysis as applied to building operating cost savings, maintenance cost savings, and savings on replacement of building components and systems. Included is a discussion of the Economic Building Performance Model now used by the Western Division Naval Facilities Command, and current federal agency efforts to apply LCC concepts to building design.","abstract_has_math":false,"creators":["Kelley, Kenneth C."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Tibbitts, J.C., Jr."],"committee_chairs":[],"committee_members":[],"year":1977,"date_issued":"1977-12","date_published":"1977-12","updated_at":"2026-11-20T22:18:02Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/18184","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/18184","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F18184","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F18184","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Tibbitts, J.C., Jr."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Kelley, Kenneth C."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1977"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-16T19:15:54Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-16T19:15:54Z"]},{"key":"dc:date.issued","label":"Date","values":["1977-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Life cycle cost analysis","LCC","Construction cost","Economic Building Performance Model","LCC model","Building design","Heating analysis","Maintenance analysis","Replacement analysis"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/18184"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Life cycle cost analysis has been a part of good architectural design for many years. It has received even greater attention as the energy crisis makes it more clear that architects and owners must plan with greater emphasis on life cycle cost (LCC) versus initial construction cost. This thesis investigates the formulas and procedures currently used and illustrates life cycle cost analysis as applied to building operating cost savings, maintenance cost savings, and savings on replacement of building components and systems. Included is a discussion of the Economic Building Performance Model now used by the Western Division Naval Facilities Command, and current federal agency efforts to apply LCC concepts to building design."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/lifecyclecostnal1094518184"]},{"key":"dc:title","label":"Title","values":["Life cycle cost analysis in building design"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Tibbitts, J.C., Jr."],"dc:contributor.department":["Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Kelley, Kenneth C."],"dc:date":["December 1977"],"dc:date.accessioned":["2012-11-16T19:15:54Z"],"dc:date.available":["2012-11-16T19:15:54Z"],"dc:date.issued":["1977-12"],"dc:description.abstract":["Life cycle cost analysis has been a part of good architectural design for many years. It has received even greater attention as the energy crisis makes it more clear that architects and owners must plan with greater emphasis on life cycle cost (LCC) versus initial construction cost. This thesis investigates the formulas and procedures currently used and illustrates life cycle cost analysis as applied to building operating cost savings, maintenance cost savings, and savings on replacement of building components and systems. Included is a discussion of the Economic Building Performance Model now used by the Western Division Naval Facilities Command, and current federal agency efforts to apply LCC concepts to building design."],"dc:description.uri":["http://archive.org/details/lifecyclecostnal1094518184"],"dc:identifier.uri":["https://hdl.handle.net/10945/18184"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Life cycle cost analysis","LCC","Construction cost","Economic Building Performance Model","LCC model","Building design","Heating analysis","Maintenance analysis","Replacement analysis"],"dc:subject.lcsh":["Management"],"dc:title":["Life cycle cost analysis in building design"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-20T22:18:02Z"}