{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/18253"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/18253","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A quadratic assignment/linear programming approach to ship scheduling for the U.S. Coast Guard.","abstract":"As part of the management planning and control function, the U.S. Coast Guard's Pacific Area Commander schedules the operational missions for all High Endurance Cutters in the Pacific Area. To provide a powerful management tool to assist this scheduling process, an analytic model for this large scale problem has been developed and implemented. It contains mission requirements, restricted sequencing of missions, ships' physical limitations and crews' morale-related considerations. The modeling approach is based on the Geoffrion-Graves model for parallel production lines with significant changeover costs. The implementation solves a large (860 row) Koopmans-Beckmann fixed charge Quadratic Assignment model using a new method with an advanced, feasible starting solution provided by an imbedded network (with 1,720 nodes and 739,600 arcs). Many linear programming problems (200 row, 450 variable) are then solved with a linear programming subroutine of advanced design. The resulting model and these implementation techniques produce excellent quality working schedules with very reasonable execution time and memory requirements. Alternative solutions are easily generated","abstract_html":"As part of the management planning and control function, the U.S. Coast Guard&#x27;s Pacific Area Commander schedules the operational missions for all High Endurance Cutters in the Pacific Area. To provide a powerful management tool to assist this scheduling process, an analytic model for this large scale problem has been developed and implemented. It contains mission requirements, restricted sequencing of missions, ships&#x27; physical limitations and crews&#x27; morale-related considerations. The modeling approach is based on the Geoffrion-Graves model for parallel production lines with significant changeover costs. The implementation solves a large (860 row) Koopmans-Beckmann fixed charge Quadratic Assignment model using a new method with an advanced, feasible starting solution provided by an imbedded network (with 1,720 nodes and 739,600 arcs). Many linear programming problems (200 row, 450 variable) are then solved with a linear programming subroutine of advanced design. The resulting model and these implementation techniques produce excellent quality working schedules with very reasonable execution time and memory requirements. Alternative solutions are easily generated","abstract_has_math":false,"creators":["Sibre, Charles Edwin"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Computer Science","degree_level":"Masters","degree_discipline":"Computer Science","degree_department":"Computer Science","school":null,"contributors":[],"advisors":["Brown, Gerald G.","Bradley, Gordon Hoover","Graves, G.W."],"committee_chairs":[],"committee_members":[],"year":1977,"date_issued":"1977-06","date_published":"1977-06","updated_at":"2026-11-21T22:51:03Z","subjects":["Computer science"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/18253","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/18253","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F18253","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F18253","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Brown, Gerald G.","Bradley, Gordon Hoover","Graves, G.W."]},{"key":"dc:contributor.department","label":"Department","values":["Computer Science","Operations Research"]},{"key":"dc:creator","label":"Author","values":["Sibre, Charles Edwin"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-16T19:16:34Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-16T19:16:34Z"]},{"key":"dc:date.issued","label":"Date","values":["1977-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Computer Science","Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Computer Science","M.S. in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Ship Scheduling","Quadratic Assignment","Linear Programming","Optimization (large scale)"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Computer science"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/18253"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["As part of the management planning and control function, the U.S. Coast Guard's Pacific Area Commander schedules the operational missions for all High Endurance Cutters in the Pacific Area. To provide a powerful management tool to assist this scheduling process, an analytic model for this large scale problem has been developed and implemented. It contains mission requirements, restricted sequencing of missions, ships' physical limitations and crews' morale-related considerations. The modeling approach is based on the Geoffrion-Graves model for parallel production lines with significant changeover costs. The implementation solves a large (860 row) Koopmans-Beckmann fixed charge Quadratic Assignment model using a new method with an advanced, feasible starting solution provided by an imbedded network (with 1,720 nodes and 739,600 arcs). Many linear programming problems (200 row, 450 variable) are then solved with a linear programming subroutine of advanced design. The resulting model and these implementation techniques produce excellent quality working schedules with very reasonable execution time and memory requirements. Alternative solutions are easily generated"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/aquadraticssignm1094518253"]},{"key":"dc:title","label":"Title","values":["A quadratic assignment/linear programming approach to ship scheduling for the U.S. Coast Guard."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Coast Guard"]}]}],"canonical_facts":{"dc:contributor.advisor":["Brown, Gerald G.","Bradley, Gordon Hoover","Graves, G.W."],"dc:contributor.department":["Computer Science","Operations Research"],"dc:creator":["Sibre, Charles Edwin"],"dc:date.accessioned":["2012-11-16T19:16:34Z"],"dc:date.available":["2012-11-16T19:16:34Z"],"dc:date.issued":["1977-06"],"dc:description.abstract":["As part of the management planning and control function, the U.S. Coast Guard's Pacific Area Commander schedules the operational missions for all High Endurance Cutters in the Pacific Area. To provide a powerful management tool to assist this scheduling process, an analytic model for this large scale problem has been developed and implemented. It contains mission requirements, restricted sequencing of missions, ships' physical limitations and crews' morale-related considerations. The modeling approach is based on the Geoffrion-Graves model for parallel production lines with significant changeover costs. The implementation solves a large (860 row) Koopmans-Beckmann fixed charge Quadratic Assignment model using a new method with an advanced, feasible starting solution provided by an imbedded network (with 1,720 nodes and 739,600 arcs). Many linear programming problems (200 row, 450 variable) are then solved with a linear programming subroutine of advanced design. The resulting model and these implementation techniques produce excellent quality working schedules with very reasonable execution time and memory requirements. Alternative solutions are easily generated"],"dc:description.uri":["http://archive.org/details/aquadraticssignm1094518253"],"dc:identifier.uri":["https://hdl.handle.net/10945/18253"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:subject.keyword":["Ship Scheduling","Quadratic Assignment","Linear Programming","Optimization (large scale)"],"dc:subject.lcsh":["Computer science"],"dc:title":["A quadratic assignment/linear programming approach to ship scheduling for the U.S. Coast Guard."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Coast Guard"],"thesis:degree_discipline":["Computer Science","Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Computer Science","M.S. in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:51:03Z"}