{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/18366"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/18366","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Case study : FFG-7 class ship.","abstract":"Estimating the cost of a major weapons system is an extremely complex process involving interrelationships between a number of organizations. This thesis is an examination of the events surrounding the cost estimating effort involved for the FFG class ship using a case study approach. The case discusses concepts involved in the FFG procurement which include the high-low mix, design to cost, life cycle costing, lead ship/follow-on ship procurement, fly before buy, independent cost estimating, and learning curve theory. A teaching note is provided to stimulate classroom discussion and analysis of the major areas covered in the case. Questions which may be used in classroom discussion or for assignment and the essentials of learning curve theory are also provided.","abstract_html":"Estimating the cost of a major weapons system is an extremely complex process involving interrelationships between a number of organizations. This thesis is an examination of the events surrounding the cost estimating effort involved for the FFG class ship using a case study approach. The case discusses concepts involved in the FFG procurement which include the high-low mix, design to cost, life cycle costing, lead ship/follow-on ship procurement, fly before buy, independent cost estimating, and learning curve theory. A teaching note is provided to stimulate classroom discussion and analysis of the major areas covered in the case. Questions which may be used in classroom discussion or for assignment and the essentials of learning curve theory are also provided.","abstract_has_math":false,"creators":["Easton, Frederick Bigelow"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":null,"school":null,"contributors":[],"advisors":["Buttinger, J.D."],"committee_chairs":[],"committee_members":["Owens, J.W."],"year":1978,"date_issued":"1978","date_published":"1978","updated_at":"2026-11-21T23:32:03Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/18366","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/18366","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F18366","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Buttinger, J.D."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Owens, J.W."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Easton, Frederick Bigelow"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["June 1978"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-16T19:21:11Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-16T19:21:11Z"]},{"key":"dc:date.issued","label":"Date","values":["1978"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Cost - Estimating","Design to cost","Frigate","Procurement","Shipbuilding"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/18366"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Estimating the cost of a major weapons system is an extremely complex process involving interrelationships between a number of organizations. This thesis is an examination of the events surrounding the cost estimating effort involved for the FFG class ship using a case study approach. The case discusses concepts involved in the FFG procurement which include the high-low mix, design to cost, life cycle costing, lead ship/follow-on ship procurement, fly before buy, independent cost estimating, and learning curve theory. A teaching note is provided to stimulate classroom discussion and analysis of the major areas covered in the case. Questions which may be used in classroom discussion or for assignment and the essentials of learning curve theory are also provided."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/casestudyffgclas1094518366"]},{"key":"dc:title","label":"Title","values":["Case study : FFG-7 class ship."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Buttinger, J.D."],"dc:contributor.committeemember":["Owens, J.W."],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Easton, Frederick Bigelow"],"dc:date":["June 1978"],"dc:date.accessioned":["2012-11-16T19:21:11Z"],"dc:date.available":["2012-11-16T19:21:11Z"],"dc:date.issued":["1978"],"dc:description.abstract":["Estimating the cost of a major weapons system is an extremely complex process involving interrelationships between a number of organizations. This thesis is an examination of the events surrounding the cost estimating effort involved for the FFG class ship using a case study approach. The case discusses concepts involved in the FFG procurement which include the high-low mix, design to cost, life cycle costing, lead ship/follow-on ship procurement, fly before buy, independent cost estimating, and learning curve theory. A teaching note is provided to stimulate classroom discussion and analysis of the major areas covered in the case. Questions which may be used in classroom discussion or for assignment and the essentials of learning curve theory are also provided."],"dc:description.uri":["http://archive.org/details/casestudyffgclas1094518366"],"dc:identifier.uri":["https://hdl.handle.net/10945/18366"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Cost - Estimating","Design to cost","Frigate","Procurement","Shipbuilding"],"dc:subject.lcsh":["Management"],"dc:title":["Case study : FFG-7 class ship."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T23:32:03Z"}