{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/1841"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/1841","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Shipbuilding integration","abstract":"The build cycle of a first in class combat ship takes about six years. During that timeframe, systems are being designed, installed, and tested, but, until the ship is in the water and tested at sea trials, it is not known if the ship is fully integrated and will actually work. As time progresses, integration problems become harder and more expensive to solve. Every time a new system is added or upgraded, there may be interference from another system that was not anticipated. It is important to test and verify each system, but there is limited time and resources to do so. By successfully planning and performing systems integration at the correct time of the acquisition cycle, it is possible to reduce the chance of system failure. This thesis explains and establishes a process for designing and building a fully integrated combat ship by first defining systems integration for the customer and the shipbuilder and explaining why performing systems integration is important.","abstract_html":"The build cycle of a first in class combat ship takes about six years. During that timeframe, systems are being designed, installed, and tested, but, until the ship is in the water and tested at sea trials, it is not known if the ship is fully integrated and will actually work. As time progresses, integration problems become harder and more expensive to solve. Every time a new system is added or upgraded, there may be interference from another system that was not anticipated. It is important to test and verify each system, but there is limited time and resources to do so. By successfully planning and performing systems integration at the correct time of the acquisition cycle, it is possible to reduce the chance of system failure. This thesis explains and establishes a process for designing and building a fully integrated combat ship by first defining systems integration for the customer and the shipbuilder and explaining why performing systems integration is important.","abstract_has_math":false,"creators":["Carter, Joanna M."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Systems Engineering Management","degree_level":"Masters","degree_discipline":"Systems Engineering Management","degree_department":null,"school":null,"contributors":[],"advisors":["Marvel, Orin","Gudas, John"],"committee_chairs":[],"committee_members":[],"year":2005,"date_issued":"2005-12","date_published":"2005-12","updated_at":"2026-11-19T06:08:15Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["62881400"],"render_values":[{"text":"62881400","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/1841","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/1841","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F1841","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Marvel, Orin","Gudas, John"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Wayne E. Meyer Institute of Systems Engineering"]},{"key":"dc:creator","label":"Author","values":["Carter, Joanna M."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-03-14T17:33:17Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-03-14T17:33:17Z"]},{"key":"dc:date.issued","label":"Date","values":["2005-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["27b3547d-d334-4374-9c7d-ff74b5bd651a"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems Engineering Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Systems Engineering Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Shipbuilding","Integration","Systems Engineering","Systems Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["62881400"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/1841"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The build cycle of a first in class combat ship takes about six years. During that timeframe, systems are being designed, installed, and tested, but, until the ship is in the water and tested at sea trials, it is not known if the ship is fully integrated and will actually work. As time progresses, integration problems become harder and more expensive to solve. Every time a new system is added or upgraded, there may be interference from another system that was not anticipated. It is important to test and verify each system, but there is limited time and resources to do so. By successfully planning and performing systems integration at the correct time of the acquisition cycle, it is possible to reduce the chance of system failure. This thesis explains and establishes a process for designing and building a fully integrated combat ship by first defining systems integration for the customer and the shipbuilder and explaining why performing systems integration is important."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/shipbuildinginte109451841"]},{"key":"dc:title","label":"Title","values":["Shipbuilding integration"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Northrop Grumman"]}]}],"canonical_facts":{"dc:contributor.advisor":["Marvel, Orin","Gudas, John"],"dc:contributor.other":["Wayne E. Meyer Institute of Systems Engineering"],"dc:creator":["Carter, Joanna M."],"dc:date.accessioned":["2012-03-14T17:33:17Z"],"dc:date.available":["2012-03-14T17:33:17Z"],"dc:date.issued":["2005-12"],"dc:description.abstract":["The build cycle of a first in class combat ship takes about six years. During that timeframe, systems are being designed, installed, and tested, but, until the ship is in the water and tested at sea trials, it is not known if the ship is fully integrated and will actually work. As time progresses, integration problems become harder and more expensive to solve. Every time a new system is added or upgraded, there may be interference from another system that was not anticipated. It is important to test and verify each system, but there is limited time and resources to do so. By successfully planning and performing systems integration at the correct time of the acquisition cycle, it is possible to reduce the chance of system failure. This thesis explains and establishes a process for designing and building a fully integrated combat ship by first defining systems integration for the customer and the shipbuilder and explaining why performing systems integration is important."],"dc:description.uri":["http://archive.org/details/shipbuildinginte109451841"],"dc:identifier.oclc":["62881400"],"dc:identifier.uri":["https://hdl.handle.net/10945/1841"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["27b3547d-d334-4374-9c7d-ff74b5bd651a"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Shipbuilding","Integration","Systems Engineering","Systems Management"],"dc:title":["Shipbuilding integration"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Northrop Grumman"],"thesis:degree_discipline":["Systems Engineering Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Systems Engineering Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:08:15Z"}