{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/18908"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/18908","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"U.S. Naval shipbuilding claims settlement : 1974-1978.","abstract":"The 1974 Seapower Subcommittee hearings, in part, expressed concern over the $1.3 billion in shipbuilding claims then outstanding and concluded that the existing procedures allowed unacceptable delay in claims settlement. These claims grew to over $2.7 billion before they were settled in 19 78. In addition to the nature of these claims, this thesis contains an investigation of the three principal initiatives exercised within the Department of Defense to settle these claims: the 1976 attempt to use P.L. 85-804, the Navy Claims Settlement Board, and the negotiated settlements in 19 78. Case studies are included for the claims from General Dynamics Corp., Electric Boat Division, and Litton Industries, Inc., Ingalls Shipbuilding Division. Finally, this thesis concludes that changes in the nature of the shipbuilding industry, contracting methods and procurement policies altered the nature of claims. Further, negotiated settlement, using claims entitlement as a basis, proved an effective alternative to litigation in resolving shipbuilding claims.","abstract_html":"The 1974 Seapower Subcommittee hearings, in part, expressed concern over the $1.3 billion in shipbuilding claims then outstanding and concluded that the existing procedures allowed unacceptable delay in claims settlement. These claims grew to over $2.7 billion before they were settled in 19 78. In addition to the nature of these claims, this thesis contains an investigation of the three principal initiatives exercised within the Department of Defense to settle these claims: the 1976 attempt to use P.L. 85-804, the Navy Claims Settlement Board, and the negotiated settlements in 19 78. Case studies are included for the claims from General Dynamics Corp., Electric Boat Division, and Litton Industries, Inc., Ingalls Shipbuilding Division. Finally, this thesis concludes that changes in the nature of the shipbuilding industry, contracting methods and procurement policies altered the nature of claims. Further, negotiated settlement, using claims entitlement as a basis, proved an effective alternative to litigation in resolving shipbuilding claims.","abstract_has_math":true,"creators":["Kesler, Gene Paul"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Crosby, A.C."],"committee_chairs":[],"committee_members":["Lamm, David V."],"year":1979,"date_issued":"1979-03","date_published":"1979-03","updated_at":"2026-11-21T22:38:23Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/18908","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/18908","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F18908","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F18908","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Crosby, A.C."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Lamm, David V."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Kesler, Gene Paul"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["March 1979"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-16T19:31:56Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-16T19:31:56Z"]},{"key":"dc:date.issued","label":"Date","values":["1979-03"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["shipbuilding claims","shipbuilding cost overruns","claims settlement","Public Law 85-804","shipbuilding inflation","contract disputes"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/18908"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The 1974 Seapower Subcommittee hearings, in part, expressed concern over the $1.3 billion in shipbuilding claims then outstanding and concluded that the existing procedures allowed unacceptable delay in claims settlement. These claims grew to over $2.7 billion before they were settled in 19 78. In addition to the nature of these claims, this thesis contains an investigation of the three principal initiatives exercised within the Department of Defense to settle these claims: the 1976 attempt to use P.L. 85-804, the Navy Claims Settlement Board, and the negotiated settlements in 19 78. Case studies are included for the claims from General Dynamics Corp., Electric Boat Division, and Litton Industries, Inc., Ingalls Shipbuilding Division. Finally, this thesis concludes that changes in the nature of the shipbuilding industry, contracting methods and procurement policies altered the nature of claims. Further, negotiated settlement, using claims entitlement as a basis, proved an effective alternative to litigation in resolving shipbuilding claims."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/usnavalshipbuild1094518908"]},{"key":"dc:title","label":"Title","values":["U.S. Naval shipbuilding claims settlement : 1974-1978."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Crosby, A.C."],"dc:contributor.committeemember":["Lamm, David V."],"dc:contributor.department":["Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Kesler, Gene Paul"],"dc:date":["March 1979"],"dc:date.accessioned":["2012-11-16T19:31:56Z"],"dc:date.available":["2012-11-16T19:31:56Z"],"dc:date.issued":["1979-03"],"dc:description.abstract":["The 1974 Seapower Subcommittee hearings, in part, expressed concern over the $1.3 billion in shipbuilding claims then outstanding and concluded that the existing procedures allowed unacceptable delay in claims settlement. These claims grew to over $2.7 billion before they were settled in 19 78. In addition to the nature of these claims, this thesis contains an investigation of the three principal initiatives exercised within the Department of Defense to settle these claims: the 1976 attempt to use P.L. 85-804, the Navy Claims Settlement Board, and the negotiated settlements in 19 78. Case studies are included for the claims from General Dynamics Corp., Electric Boat Division, and Litton Industries, Inc., Ingalls Shipbuilding Division. Finally, this thesis concludes that changes in the nature of the shipbuilding industry, contracting methods and procurement policies altered the nature of claims. Further, negotiated settlement, using claims entitlement as a basis, proved an effective alternative to litigation in resolving shipbuilding claims."],"dc:description.uri":["http://archive.org/details/usnavalshipbuild1094518908"],"dc:identifier.uri":["https://hdl.handle.net/10945/18908"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["shipbuilding claims","shipbuilding cost overruns","claims settlement","Public Law 85-804","shipbuilding inflation","contract disputes"],"dc:subject.lcsh":["Management"],"dc:title":["U.S. Naval shipbuilding claims settlement : 1974-1978."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Commander, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:38:23Z"}