{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/19025"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/19025","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A proposed material requirements planning system for NARF Alameda.","abstract":"The United States Navy is currently implementing a plan to consolidate the wholesale supply functions of the Naval Air Station at Alameda and the Naval Supply Center at Oakland. Improving supply support of the Naval Air Rework Facility Alameda in general and stock availability in particular is a vital part of the plan. Demand forecasting by workload driven material requirements planning (MRP) is being considered as a means to improve stock availability. This thesis begins with an overview of the MRP technique and the current supply support of NARF Alameda. It proceeds with the description and evaluation of a temporary MRP system that is currently implemented and uses it as a background for development of an MRP system that is designed to operate in a maintenance oriented environment in general and at NARF Alameda in particular. Finally, suggestions are made for transition from the temporary to the proposed system.","abstract_html":"The United States Navy is currently implementing a plan to consolidate the wholesale supply functions of the Naval Air Station at Alameda and the Naval Supply Center at Oakland. Improving supply support of the Naval Air Rework Facility Alameda in general and stock availability in particular is a vital part of the plan. Demand forecasting by workload driven material requirements planning (MRP) is being considered as a means to improve stock availability. This thesis begins with an overview of the MRP technique and the current supply support of NARF Alameda. It proceeds with the description and evaluation of a temporary MRP system that is currently implemented and uses it as a background for development of an MRP system that is designed to operate in a maintenance oriented environment in general and at NARF Alameda in particular. Finally, suggestions are made for transition from the temporary to the proposed system.","abstract_has_math":false,"creators":["Eylon, Barauch"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["McMasters, Alan W.","Schneidewind, Norman F."],"committee_chairs":[],"committee_members":[],"year":1980,"date_issued":"1980-03","date_published":"1980-03","updated_at":"2026-11-19T06:08:40Z","subjects":["Management"],"languages":[],"rights":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/19025","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/19025","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F19025","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F19025","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["McMasters, Alan W.","Schneidewind, Norman F."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Eylon, Barauch"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["March 1980"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-16T21:01:38Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-16T21:01:38Z"]},{"key":"dc:date.issued","label":"Date","values":["1980-03"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["inventory","MRP","production","planning","control","forecasting"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/19025"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The United States Navy is currently implementing a plan to consolidate the wholesale supply functions of the Naval Air Station at Alameda and the Naval Supply Center at Oakland. Improving supply support of the Naval Air Rework Facility Alameda in general and stock availability in particular is a vital part of the plan. Demand forecasting by workload driven material requirements planning (MRP) is being considered as a means to improve stock availability. This thesis begins with an overview of the MRP technique and the current supply support of NARF Alameda. It proceeds with the description and evaluation of a temporary MRP system that is currently implemented and uses it as a background for development of an MRP system that is designed to operate in a maintenance oriented environment in general and at NARF Alameda in particular. Finally, suggestions are made for transition from the temporary to the proposed system."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/aproposedmateria1094519025"]},{"key":"dc:title","label":"Title","values":["A proposed material requirements planning system for NARF Alameda."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, Israeli Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["McMasters, Alan W.","Schneidewind, Norman F."],"dc:contributor.department":["Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Eylon, Barauch"],"dc:date":["March 1980"],"dc:date.accessioned":["2012-11-16T21:01:38Z"],"dc:date.available":["2012-11-16T21:01:38Z"],"dc:date.issued":["1980-03"],"dc:description.abstract":["The United States Navy is currently implementing a plan to consolidate the wholesale supply functions of the Naval Air Station at Alameda and the Naval Supply Center at Oakland. Improving supply support of the Naval Air Rework Facility Alameda in general and stock availability in particular is a vital part of the plan. Demand forecasting by workload driven material requirements planning (MRP) is being considered as a means to improve stock availability. This thesis begins with an overview of the MRP technique and the current supply support of NARF Alameda. It proceeds with the description and evaluation of a temporary MRP system that is currently implemented and uses it as a background for development of an MRP system that is designed to operate in a maintenance oriented environment in general and at NARF Alameda in particular. Finally, suggestions are made for transition from the temporary to the proposed system."],"dc:description.uri":["http://archive.org/details/aproposedmateria1094519025"],"dc:identifier.uri":["https://hdl.handle.net/10945/19025"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["inventory","MRP","production","planning","control","forecasting"],"dc:subject.lcsh":["Management"],"dc:title":["A proposed material requirements planning system for NARF Alameda."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, Israeli Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:08:40Z"}