{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/19183"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/19183","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Capital investment motivational techniques used by prime contractors to subcontractors.","abstract":"The current Acquisition Improvement Program (AIP) has focused a great deal of attention on many of the perceived management problems in the federal acquisition process. Included among these are the motivation of contractors to make productivity enhancing capital investments. Although this problem has been addressed previously by profit policy, the effect has been minimal. Most efforts have been directed at the prime contractor level with little effect to date. This research examines the complex array of factors which result in productivity enhancing capital investment and raises the question of what has been accomplished at the subcontractor level. The research, through the use of a subcontractor survey, determined that little if any effort was expended at the prime contractor level to motivate subcontractors to invest in productivity enhancing capital equipment. Until recently, subcontractors have been excluded from DOD efforts to incentivize capital investment.","abstract_html":"The current Acquisition Improvement Program (AIP) has focused a great deal of attention on many of the perceived management problems in the federal acquisition process. Included among these are the motivation of contractors to make productivity enhancing capital investments. Although this problem has been addressed previously by profit policy, the effect has been minimal. Most efforts have been directed at the prime contractor level with little effect to date. This research examines the complex array of factors which result in productivity enhancing capital investment and raises the question of what has been accomplished at the subcontractor level. The research, through the use of a subcontractor survey, determined that little if any effort was expended at the prime contractor level to motivate subcontractors to invest in productivity enhancing capital equipment. Until recently, subcontractors have been excluded from DOD efforts to incentivize capital investment.","abstract_has_math":false,"creators":["Holtsclaw, Keith S."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Lamm, David W."],"committee_chairs":[],"committee_members":["Guyer, Dean C."],"year":1984,"date_issued":"1984-12","date_published":"1984-12","updated_at":"2026-11-26T00:19:59Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/19183","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/19183","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F19183","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F19183","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Lamm, David W."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Guyer, Dean C."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Holtsclaw, Keith S."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1984"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-19T23:48:53Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-19T23:48:53Z"]},{"key":"dc:date.issued","label":"Date","values":["1984-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["productivity","profit policy","subcontractors","weighted guidelines","profitability","profit"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/19183"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The current Acquisition Improvement Program (AIP) has focused a great deal of attention on many of the perceived management problems in the federal acquisition process. Included among these are the motivation of contractors to make productivity enhancing capital investments. Although this problem has been addressed previously by profit policy, the effect has been minimal. Most efforts have been directed at the prime contractor level with little effect to date. This research examines the complex array of factors which result in productivity enhancing capital investment and raises the question of what has been accomplished at the subcontractor level. The research, through the use of a subcontractor survey, determined that little if any effort was expended at the prime contractor level to motivate subcontractors to invest in productivity enhancing capital equipment. Until recently, subcontractors have been excluded from DOD efforts to incentivize capital investment."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/capitalinvestmen1094519183"]},{"key":"dc:title","label":"Title","values":["Capital investment motivational techniques used by prime contractors to subcontractors."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Lamm, David W."],"dc:contributor.committeemember":["Guyer, Dean C."],"dc:contributor.department":["Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Holtsclaw, Keith S."],"dc:date":["December 1984"],"dc:date.accessioned":["2012-11-19T23:48:53Z"],"dc:date.available":["2012-11-19T23:48:53Z"],"dc:date.issued":["1984-12"],"dc:description.abstract":["The current Acquisition Improvement Program (AIP) has focused a great deal of attention on many of the perceived management problems in the federal acquisition process. Included among these are the motivation of contractors to make productivity enhancing capital investments. Although this problem has been addressed previously by profit policy, the effect has been minimal. Most efforts have been directed at the prime contractor level with little effect to date. This research examines the complex array of factors which result in productivity enhancing capital investment and raises the question of what has been accomplished at the subcontractor level. The research, through the use of a subcontractor survey, determined that little if any effort was expended at the prime contractor level to motivate subcontractors to invest in productivity enhancing capital equipment. Until recently, subcontractors have been excluded from DOD efforts to incentivize capital investment."],"dc:description.uri":["http://archive.org/details/capitalinvestmen1094519183"],"dc:identifier.uri":["https://hdl.handle.net/10945/19183"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["productivity","profit policy","subcontractors","weighted guidelines","profitability","profit"],"dc:subject.lcsh":["Management"],"dc:title":["Capital investment motivational techniques used by prime contractors to subcontractors."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-26T00:19:59Z"}