{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/19507"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/19507","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Preparation costs of step two special project submissions at Navy Public Works Centers","abstract":"This thesis compares the cost to the government of contracting out Special Project Step Two submissions versus the cost of preparing Step Two submissions with in-house government employees, Data from 80 Step Twos prepared at two Navy Public Works Centers were collected and analyzed, The results indicate conclusively that Step Two preparation by in-house employees is much less costly than contracting out Step Two preparation. In addition to the cost comparison, predictive models were developed for Step Two preparation cost, based upon certain characteristics of the Special Project for which the Step Two is being prepared. The thesis contains background information on the Naval Facilities Engineering Command, Navy Public Works Center, the Special Project Program, and the negotiated architectural and engineering contract process. Possible alternatives to the current Step Two preparation process are presented and discussed.","abstract_html":"This thesis compares the cost to the government of contracting out Special Project Step Two submissions versus the cost of preparing Step Two submissions with in-house government employees, Data from 80 Step Twos prepared at two Navy Public Works Centers were collected and analyzed, The results indicate conclusively that Step Two preparation by in-house employees is much less costly than contracting out Step Two preparation. In addition to the cost comparison, predictive models were developed for Step Two preparation cost, based upon certain characteristics of the Special Project for which the Step Two is being prepared. The thesis contains background information on the Naval Facilities Engineering Command, Navy Public Works Center, the Special Project Program, and the negotiated architectural and engineering contract process. Possible alternatives to the current Step Two preparation process are presented and discussed.","abstract_has_math":false,"creators":["Dressel, Kenneth W."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Department of Administrative Sciences","school":null,"contributors":[],"advisors":["Carrick, P. M.","Talutis, W. R."],"committee_chairs":[],"committee_members":[],"year":1984,"date_issued":"1984-12","date_published":"1984-12","updated_at":"2026-11-21T23:42:51Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/19507","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/19507","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F19507","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F19507","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Carrick, P. M.","Talutis, W. R."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Dressel, Kenneth W."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1984"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-19T23:51:07Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-19T23:51:07Z"]},{"key":"dc:date.issued","label":"Date","values":["1984-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Architect and engineer contracts","A&E contracts","Cost estimation","Cost models","Cost comparison","Government contracting","Public works centers","Special projects","Step Two submission"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/19507"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis compares the cost to the government of contracting out Special Project Step Two submissions versus the cost of preparing Step Two submissions with in-house government employees, Data from 80 Step Twos prepared at two Navy Public Works Centers were collected and analyzed, The results indicate conclusively that Step Two preparation by in-house employees is much less costly than contracting out Step Two preparation. In addition to the cost comparison, predictive models were developed for Step Two preparation cost, based upon certain characteristics of the Special Project for which the Step Two is being prepared. The thesis contains background information on the Naval Facilities Engineering Command, Navy Public Works Center, the Special Project Program, and the negotiated architectural and engineering contract process. Possible alternatives to the current Step Two preparation process are presented and discussed."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/preparationcosts1094519507"]},{"key":"dc:title","label":"Title","values":["Preparation costs of step two special project submissions at Navy Public Works Centers"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Carrick, P. M.","Talutis, W. R."],"dc:contributor.department":["Department of Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Dressel, Kenneth W."],"dc:date":["December 1984"],"dc:date.accessioned":["2012-11-19T23:51:07Z"],"dc:date.available":["2012-11-19T23:51:07Z"],"dc:date.issued":["1984-12"],"dc:description.abstract":["This thesis compares the cost to the government of contracting out Special Project Step Two submissions versus the cost of preparing Step Two submissions with in-house government employees, Data from 80 Step Twos prepared at two Navy Public Works Centers were collected and analyzed, The results indicate conclusively that Step Two preparation by in-house employees is much less costly than contracting out Step Two preparation. In addition to the cost comparison, predictive models were developed for Step Two preparation cost, based upon certain characteristics of the Special Project for which the Step Two is being prepared. The thesis contains background information on the Naval Facilities Engineering Command, Navy Public Works Center, the Special Project Program, and the negotiated architectural and engineering contract process. Possible alternatives to the current Step Two preparation process are presented and discussed."],"dc:description.uri":["http://archive.org/details/preparationcosts1094519507"],"dc:identifier.uri":["https://hdl.handle.net/10945/19507"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Architect and engineer contracts","A&E contracts","Cost estimation","Cost models","Cost comparison","Government contracting","Public works centers","Special projects","Step Two submission"],"dc:subject.lcsh":["Management"],"dc:title":["Preparation costs of step two special project submissions at Navy Public Works Centers"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T23:42:51Z"}