{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/20382"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/20382","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A two-period repair parts inventory for a Naval Air Rework Facility.","abstract":"A Ready Supply Store (RSS) containing repair parts which are anticipated to be used during the production process has been established to support the Naval Air Rework Facility (NARF) . While this supporting inventory has previously been constructed using historical demand data, a model which computes stock levels based on the next quarter's production schedule has been proposed. This thesis extends the use of projected production information in calculating RSS inventory levels from one to two periods, and compares the expected total costs from both systems under the assumption of a binomial demand distribution which is appropriate to a NARF. As a result of this comparison, the conclusion is made that the two-period model offers only very minor expected cost advantages over a single-period formulation, while also being much more difficult to utilize due to the complex calculations involved in the computation process.","abstract_html":"A Ready Supply Store (RSS) containing repair parts which are anticipated to be used during the production process has been established to support the Naval Air Rework Facility (NARF) . While this supporting inventory has previously been constructed using historical demand data, a model which computes stock levels based on the next quarter&#x27;s production schedule has been proposed. This thesis extends the use of projected production information in calculating RSS inventory levels from one to two periods, and compares the expected total costs from both systems under the assumption of a binomial demand distribution which is appropriate to a NARF. As a result of this comparison, the conclusion is made that the two-period model offers only very minor expected cost advantages over a single-period formulation, while also being much more difficult to utilize due to the complex calculations involved in the computation process.","abstract_has_math":false,"creators":["Hund, John J."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Management","school":"Naval Postgraduate School","contributors":[],"advisors":["McMasters, Alan W."],"committee_chairs":[],"committee_members":["Solis, Armondo"],"year":1982,"date_issued":"1982-12","date_published":"1982-12","updated_at":"2026-11-21T22:32:58Z","subjects":["Management"],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/20382","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/20382","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F20382","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F20382","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["McMasters, Alan W."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Solis, Armondo"]},{"key":"dc:contributor.department","label":"Department","values":["Management"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:contributor.school","label":"School","values":["Naval Postgraduate School"]},{"key":"dc:creator","label":"Author","values":["Hund, John J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-20T00:09:05Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-20T00:09:05Z"]},{"key":"dc:date.issued","label":"Date","values":["1982-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/20382"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["A Ready Supply Store (RSS) containing repair parts which are anticipated to be used during the production process has been established to support the Naval Air Rework Facility (NARF) . While this supporting inventory has previously been constructed using historical demand data, a model which computes stock levels based on the next quarter's production schedule has been proposed. This thesis extends the use of projected production information in calculating RSS inventory levels from one to two periods, and compares the expected total costs from both systems under the assumption of a binomial demand distribution which is appropriate to a NARF. As a result of this comparison, the conclusion is made that the two-period model offers only very minor expected cost advantages over a single-period formulation, while also being much more difficult to utilize due to the complex calculations involved in the computation process."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/atwoperiodrepair1094520382"]},{"key":"dc:title","label":"Title","values":["A two-period repair parts inventory for a Naval Air Rework Facility."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, Supply Corps, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["McMasters, Alan W."],"dc:contributor.committeemember":["Solis, Armondo"],"dc:contributor.department":["Management"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:contributor.school":["Naval Postgraduate School"],"dc:creator":["Hund, John J."],"dc:date.accessioned":["2012-11-20T00:09:05Z"],"dc:date.available":["2012-11-20T00:09:05Z"],"dc:date.issued":["1982-12"],"dc:description.abstract":["A Ready Supply Store (RSS) containing repair parts which are anticipated to be used during the production process has been established to support the Naval Air Rework Facility (NARF) . While this supporting inventory has previously been constructed using historical demand data, a model which computes stock levels based on the next quarter's production schedule has been proposed. This thesis extends the use of projected production information in calculating RSS inventory levels from one to two periods, and compares the expected total costs from both systems under the assumption of a binomial demand distribution which is appropriate to a NARF. As a result of this comparison, the conclusion is made that the two-period model offers only very minor expected cost advantages over a single-period formulation, while also being much more difficult to utilize due to the complex calculations involved in the computation process."],"dc:description.uri":["http://archive.org/details/atwoperiodrepair1094520382"],"dc:identifier.uri":["https://hdl.handle.net/10945/20382"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.lcsh":["Management"],"dc:title":["A two-period repair parts inventory for a Naval Air Rework Facility."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, Supply Corps, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:32:58Z"}