{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/20456"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/20456","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"A comparison of the acquisition process for ship construction projects of the Royal Australian Navy and the United States Navy","abstract":"This tnesis compares the processes of acquisition for ship construction projects in the Royal Australian Navy and the United States Navy. It examines the problems associated with government furnished equipment with regard to specifications, timing, quality assurance, and cost. The requirements of standardisation, commonality, and interoperability with allied nations is also discussed. The differences are not many, and can be attributed to the demographic aspects of each country, and the fact there is always more tnan one way of operating. The process theoretically should flow smoothly from one phase to the next, however, differences between authorities on minor aspects can lead to delays in the total project. A proposal for a replacement shipbuilding programme for the Royal Australian Navy is presented, whereby the fleet would be continually updated with new ships and new weapon systems on a cyclical basis. This proposal would increase involvement by Australian industries in warships for Australia. It would also solve many of the current problems with government furnished equipment, and provide a substantial degree of standardisation.","abstract_html":"This tnesis compares the processes of acquisition for ship construction projects in the Royal Australian Navy and the United States Navy. It examines the problems associated with government furnished equipment with regard to specifications, timing, quality assurance, and cost. The requirements of standardisation, commonality, and interoperability with allied nations is also discussed. The differences are not many, and can be attributed to the demographic aspects of each country, and the fact there is always more tnan one way of operating. The process theoretically should flow smoothly from one phase to the next, however, differences between authorities on minor aspects can lead to delays in the total project. A proposal for a replacement shipbuilding programme for the Royal Australian Navy is presented, whereby the fleet would be continually updated with new ships and new weapon systems on a cyclical basis. This proposal would increase involvement by Australian industries in warships for Australia. It would also solve many of the current problems with government furnished equipment, and provide a substantial degree of standardisation.","abstract_has_math":false,"creators":["Caton, David P. R."],"institution":"Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Management","school":"Naval Postgraduate School","contributors":[],"advisors":["Cullen, William H."],"committee_chairs":[],"committee_members":["Nickerson, R.G."],"year":1981,"date_issued":"1981-06","date_published":"1981-06","updated_at":"2026-11-19T21:59:10Z","subjects":["Management"],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/20456","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/20456","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F20456","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F20456","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Cullen, William H."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Nickerson, R.G."]},{"key":"dc:contributor.department","label":"Department","values":["Management"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:contributor.school","label":"School","values":["Naval Postgraduate School"]},{"key":"dc:creator","label":"Author","values":["Caton, David P. R."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-20T00:15:56Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-20T00:15:56Z"]},{"key":"dc:date.issued","label":"Date","values":["1981-06"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Australia","Procurement","Shipbuilding"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/20456"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This tnesis compares the processes of acquisition for ship construction projects in the Royal Australian Navy and the United States Navy. It examines the problems associated with government furnished equipment with regard to specifications, timing, quality assurance, and cost. The requirements of standardisation, commonality, and interoperability with allied nations is also discussed. The differences are not many, and can be attributed to the demographic aspects of each country, and the fact there is always more tnan one way of operating. The process theoretically should flow smoothly from one phase to the next, however, differences between authorities on minor aspects can lead to delays in the total project. A proposal for a replacement shipbuilding programme for the Royal Australian Navy is presented, whereby the fleet would be continually updated with new ships and new weapon systems on a cyclical basis. This proposal would increase involvement by Australian industries in warships for Australia. It would also solve many of the current problems with government furnished equipment, and provide a substantial degree of standardisation."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/acomparisonofcqu1094520456"]},{"key":"dc:title","label":"Title","values":["A comparison of the acquisition process for ship construction projects of the Royal Australian Navy and the United States Navy"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, Royal Australian Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Cullen, William H."],"dc:contributor.committeemember":["Nickerson, R.G."],"dc:contributor.department":["Management"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:contributor.school":["Naval Postgraduate School"],"dc:creator":["Caton, David P. R."],"dc:date.accessioned":["2012-11-20T00:15:56Z"],"dc:date.available":["2012-11-20T00:15:56Z"],"dc:date.issued":["1981-06"],"dc:description.abstract":["This tnesis compares the processes of acquisition for ship construction projects in the Royal Australian Navy and the United States Navy. It examines the problems associated with government furnished equipment with regard to specifications, timing, quality assurance, and cost. The requirements of standardisation, commonality, and interoperability with allied nations is also discussed. The differences are not many, and can be attributed to the demographic aspects of each country, and the fact there is always more tnan one way of operating. The process theoretically should flow smoothly from one phase to the next, however, differences between authorities on minor aspects can lead to delays in the total project. A proposal for a replacement shipbuilding programme for the Royal Australian Navy is presented, whereby the fleet would be continually updated with new ships and new weapon systems on a cyclical basis. This proposal would increase involvement by Australian industries in warships for Australia. It would also solve many of the current problems with government furnished equipment, and provide a substantial degree of standardisation."],"dc:description.uri":["http://archive.org/details/acomparisonofcqu1094520456"],"dc:identifier.uri":["https://hdl.handle.net/10945/20456"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Australia","Procurement","Shipbuilding"],"dc:subject.lcsh":["Management"],"dc:title":["A comparison of the acquisition process for ship construction projects of the Royal Australian Navy and the United States Navy"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, Royal Australian Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T21:59:10Z"}