{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/20479"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/20479","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Cost estimation of architect and engineer contracts","abstract":"Architectural and Engineering firms are selected for government projects via a technical competition method with a fair and reasonable fee determined through negotiations The criteria for what is fair and reasonable is the government estimate. There is a limited guidance available on the preparation of estimates for A&E contracts. Additionally, there is limited use of empirical information due to the lack of an organized database. This research defined the cost estimation method as a decision process and supported that process with numerous analytical computations, statistical techniques, and regression cost models derived from a database comprised of previous A&E contract awards. This approach was effective in that estimates were generated which more closely represented negotiated fees.","abstract_html":"Architectural and Engineering firms are selected for government projects via a technical competition method with a fair and reasonable fee determined through negotiations The criteria for what is fair and reasonable is the government estimate. There is a limited guidance available on the preparation of estimates for A&amp;E contracts. Additionally, there is limited use of empirical information due to the lack of an organized database. This research defined the cost estimation method as a decision process and supported that process with numerous analytical computations, statistical techniques, and regression cost models derived from a database comprised of previous A&amp;E contract awards. This approach was effective in that estimates were generated which more closely represented negotiated fees.","abstract_has_math":false,"creators":["Herndon, Everette L., Jr."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Liao, S.S."],"committee_chairs":[],"committee_members":["Barr, Donald R."],"year":1981,"date_issued":"1981-12","date_published":"1981-12","updated_at":"2026-11-26T00:18:10Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/20479","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/20479","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F20479","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F20479","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Liao, S.S."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Barr, Donald R."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Herndon, Everette L., Jr."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1981"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-20T00:16:07Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-20T00:16:07Z"]},{"key":"dc:date.issued","label":"Date","values":["1981-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Architect and Engineer contracts","A&E contracts","Construction design contracts","Brook's Bill","Acquisition database","Cost models","Cost estimation"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/20479"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Architectural and Engineering firms are selected for government projects via a technical competition method with a fair and reasonable fee determined through negotiations The criteria for what is fair and reasonable is the government estimate. There is a limited guidance available on the preparation of estimates for A&E contracts. Additionally, there is limited use of empirical information due to the lack of an organized database. This research defined the cost estimation method as a decision process and supported that process with numerous analytical computations, statistical techniques, and regression cost models derived from a database comprised of previous A&E contract awards. This approach was effective in that estimates were generated which more closely represented negotiated fees."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/costestimationof1094520479"]},{"key":"dc:title","label":"Title","values":["Cost estimation of architect and engineer contracts"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Liao, S.S."],"dc:contributor.committeemember":["Barr, Donald R."],"dc:contributor.department":["Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Herndon, Everette L., Jr."],"dc:date":["December 1981"],"dc:date.accessioned":["2012-11-20T00:16:07Z"],"dc:date.available":["2012-11-20T00:16:07Z"],"dc:date.issued":["1981-12"],"dc:description.abstract":["Architectural and Engineering firms are selected for government projects via a technical competition method with a fair and reasonable fee determined through negotiations The criteria for what is fair and reasonable is the government estimate. There is a limited guidance available on the preparation of estimates for A&E contracts. Additionally, there is limited use of empirical information due to the lack of an organized database. This research defined the cost estimation method as a decision process and supported that process with numerous analytical computations, statistical techniques, and regression cost models derived from a database comprised of previous A&E contract awards. This approach was effective in that estimates were generated which more closely represented negotiated fees."],"dc:description.uri":["http://archive.org/details/costestimationof1094520479"],"dc:identifier.uri":["https://hdl.handle.net/10945/20479"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Architect and Engineer contracts","A&E contracts","Construction design contracts","Brook's Bill","Acquisition database","Cost models","Cost estimation"],"dc:subject.lcsh":["Management"],"dc:title":["Cost estimation of architect and engineer contracts"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-26T00:18:10Z"}