{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/20760"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/20760","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Application of Reliability Improvement Warranty (RIW) to DoD procurements.","abstract":"The existence of a goal conflict in the buyer/seller relationship is inherent under a profit motivated system where conventional procurement techniques are used. The buyer seeks maximum performance at minimum life cycle cost and the seller seeks to maximize profit which may translate to minimizing reliability improvement costs. Experience of military and commercial procurement activities with the use of Reliability Improvement Warranties (RIW's) has led to the conclusion that the RIW may be a valuable tool in bringing buyer/ seller goals into agreement by transferring the management of costs to the seller. Background material on DoD and commercial warranty experience is used to form the framework for an evaluation criteria developed by ARINC Research Corporation to test the applicability of RIW to a particular acquisition. The limited DoD guidance which has been promulgated is recapitulated for consolidation with the ARINC criteria and recent experience.","abstract_html":"The existence of a goal conflict in the buyer/seller relationship is inherent under a profit motivated system where conventional procurement techniques are used. The buyer seeks maximum performance at minimum life cycle cost and the seller seeks to maximize profit which may translate to minimizing reliability improvement costs. Experience of military and commercial procurement activities with the use of Reliability Improvement Warranties (RIW&#x27;s) has led to the conclusion that the RIW may be a valuable tool in bringing buyer/ seller goals into agreement by transferring the management of costs to the seller. Background material on DoD and commercial warranty experience is used to form the framework for an evaluation criteria developed by ARINC Research Corporation to test the applicability of RIW to a particular acquisition. The limited DoD guidance which has been promulgated is recapitulated for consolidation with the ARINC criteria and recent experience.","abstract_has_math":false,"creators":["Allen, Dennis Jean"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":null,"school":null,"contributors":[],"advisors":["Judson, R.R."],"committee_chairs":[],"committee_members":["Raike, William M."],"year":1975,"date_issued":"1975-03","date_published":"1975-03","updated_at":"2026-11-26T00:21:19Z","subjects":["Management"],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/20760","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/20760","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F20760","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F20760","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Judson, R.R."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Raike, William M."]},{"key":"dc:creator","label":"Author","values":["Allen, Dennis Jean"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-20T00:25:14Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-20T00:25:14Z"]},{"key":"dc:date.issued","label":"Date","values":["1975-03"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Warranty","Failure Free Warranty","Reliability Improvement Warranty"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/20760"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The existence of a goal conflict in the buyer/seller relationship is inherent under a profit motivated system where conventional procurement techniques are used. The buyer seeks maximum performance at minimum life cycle cost and the seller seeks to maximize profit which may translate to minimizing reliability improvement costs. Experience of military and commercial procurement activities with the use of Reliability Improvement Warranties (RIW's) has led to the conclusion that the RIW may be a valuable tool in bringing buyer/ seller goals into agreement by transferring the management of costs to the seller. Background material on DoD and commercial warranty experience is used to form the framework for an evaluation criteria developed by ARINC Research Corporation to test the applicability of RIW to a particular acquisition. The limited DoD guidance which has been promulgated is recapitulated for consolidation with the ARINC criteria and recent experience."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/applicationofrel1094520760"]},{"key":"dc:title","label":"Title","values":["Application of Reliability Improvement Warranty (RIW) to DoD procurements."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, Supply Corps, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Judson, R.R."],"dc:contributor.committeemember":["Raike, William M."],"dc:creator":["Allen, Dennis Jean"],"dc:date.accessioned":["2012-11-20T00:25:14Z"],"dc:date.available":["2012-11-20T00:25:14Z"],"dc:date.issued":["1975-03"],"dc:description.abstract":["The existence of a goal conflict in the buyer/seller relationship is inherent under a profit motivated system where conventional procurement techniques are used. The buyer seeks maximum performance at minimum life cycle cost and the seller seeks to maximize profit which may translate to minimizing reliability improvement costs. Experience of military and commercial procurement activities with the use of Reliability Improvement Warranties (RIW's) has led to the conclusion that the RIW may be a valuable tool in bringing buyer/ seller goals into agreement by transferring the management of costs to the seller. Background material on DoD and commercial warranty experience is used to form the framework for an evaluation criteria developed by ARINC Research Corporation to test the applicability of RIW to a particular acquisition. The limited DoD guidance which has been promulgated is recapitulated for consolidation with the ARINC criteria and recent experience."],"dc:description.uri":["http://archive.org/details/applicationofrel1094520760"],"dc:identifier.uri":["https://hdl.handle.net/10945/20760"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Warranty","Failure Free Warranty","Reliability Improvement Warranty"],"dc:subject.lcsh":["Management"],"dc:title":["Application of Reliability Improvement Warranty (RIW) to DoD procurements."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, Supply Corps, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-26T00:21:19Z"}