{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/21164"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/21164","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An application of cost risk in incentive contracts.","abstract":"This paper begins with an examination of the literature concerning incentive contract effectiveness and contractor motivation. Citing the most frequently supported conclusions, the researcher integrates these with a cost risk analysis methodology based upon the Beta distribution. The result is a share curve that automatically adjusts the share ratio based upon estimated cost variance. The researcher suggests that this approach is better at reflecting cost risk than the standard linear design. The share curve provides more risk sharing, especially at higher levels of cost variance, and provides both significant rewards and penalties only for significant deviations from target cost. The final conclusion is that the share curve mitigates the defense contractors' \"risk averse\" nature, thus allowing the profit motive to become operative in incentivizing the contractor to control or reduce costs.","abstract_html":"This paper begins with an examination of the literature concerning incentive contract effectiveness and contractor motivation. Citing the most frequently supported conclusions, the researcher integrates these with a cost risk analysis methodology based upon the Beta distribution. The result is a share curve that automatically adjusts the share ratio based upon estimated cost variance. The researcher suggests that this approach is better at reflecting cost risk than the standard linear design. The share curve provides more risk sharing, especially at higher levels of cost variance, and provides both significant rewards and penalties only for significant deviations from target cost. The final conclusion is that the share curve mitigates the defense contractors&#x27; &quot;risk averse&quot; nature, thus allowing the profit motive to become operative in incentivizing the contractor to control or reduce costs.","abstract_has_math":false,"creators":["McGrath, Christopher Michael"],"institution":"Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Greer, Willis R. Jr."],"committee_chairs":[],"committee_members":["Smith, Ray W."],"year":1985,"date_issued":"1985-12","date_published":"1985-12","updated_at":"2026-11-21T22:53:13Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/21164","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/21164","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F21164","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F21164","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Greer, Willis R. Jr."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Smith, Ray W."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["McGrath, Christopher Michael"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1985"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-27T00:00:10Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-27T00:00:10Z"]},{"key":"dc:date.issued","label":"Date","values":["1985-12"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["cost estimates","incentive contracts","motivation","cost analysis","risk analysis"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/21164"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This paper begins with an examination of the literature concerning incentive contract effectiveness and contractor motivation. Citing the most frequently supported conclusions, the researcher integrates these with a cost risk analysis methodology based upon the Beta distribution. The result is a share curve that automatically adjusts the share ratio based upon estimated cost variance. The researcher suggests that this approach is better at reflecting cost risk than the standard linear design. The share curve provides more risk sharing, especially at higher levels of cost variance, and provides both significant rewards and penalties only for significant deviations from target cost. The final conclusion is that the share curve mitigates the defense contractors' \"risk averse\" nature, thus allowing the profit motive to become operative in incentivizing the contractor to control or reduce costs."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/anpplicationofco1094521164"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["95 p."]},{"key":"dc:title","label":"Title","values":["An application of cost risk in incentive contracts."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Greer, Willis R. Jr."],"dc:contributor.committeemember":["Smith, Ray W."],"dc:contributor.department":["Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["McGrath, Christopher Michael"],"dc:date":["December 1985"],"dc:date.accessioned":["2012-11-27T00:00:10Z"],"dc:date.available":["2012-11-27T00:00:10Z"],"dc:date.issued":["1985-12"],"dc:description.abstract":["This paper begins with an examination of the literature concerning incentive contract effectiveness and contractor motivation. Citing the most frequently supported conclusions, the researcher integrates these with a cost risk analysis methodology based upon the Beta distribution. The result is a share curve that automatically adjusts the share ratio based upon estimated cost variance. The researcher suggests that this approach is better at reflecting cost risk than the standard linear design. The share curve provides more risk sharing, especially at higher levels of cost variance, and provides both significant rewards and penalties only for significant deviations from target cost. The final conclusion is that the share curve mitigates the defense contractors' \"risk averse\" nature, thus allowing the profit motive to become operative in incentivizing the contractor to control or reduce costs."],"dc:description.uri":["http://archive.org/details/anpplicationofco1094521164"],"dc:format.extent":["95 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/21164"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["cost estimates","incentive contracts","motivation","cost analysis","risk analysis"],"dc:subject.lcsh":["Management"],"dc:title":["An application of cost risk in incentive contracts."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:53:13Z"}