{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/21182"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/21182","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Capital equipment acquisition procedures for enhancing productivity at PWC San Francisco.","abstract":"The purpose of this thesis is to detail the management control process as related to the Productivity Program at the Navy Public Works Center (PWC) San Francisco, Calif. The Department of Defense and Navy programs provide a broad framework within all PWCs have developed their own unique Productivity Programs. The Asset Capitalization program (ACP) has provided industrial fund activities like PWCs with the means of implementing the productivity strategy. In particular, the Capital Equipment Investment Plan establishes a systematic approach in the substitution of capital equipment for labor with enhanced productivity a desired result. With such a plan, PWC San Francisco, has been able to achieve revitalization and modernization of capital assets. However, there are weaknesses in the planning and acquisition procedures which have been identified and which require management attention. Keywords: Public Works Centers; Productivity; Capital investments; Asset Capitalization Program; Capital equipment; Navy industrial fund; Five-year Capital Equipment Investment Plan. (Theses)","abstract_html":"The purpose of this thesis is to detail the management control process as related to the Productivity Program at the Navy Public Works Center (PWC) San Francisco, Calif. The Department of Defense and Navy programs provide a broad framework within all PWCs have developed their own unique Productivity Programs. The Asset Capitalization program (ACP) has provided industrial fund activities like PWCs with the means of implementing the productivity strategy. In particular, the Capital Equipment Investment Plan establishes a systematic approach in the substitution of capital equipment for labor with enhanced productivity a desired result. With such a plan, PWC San Francisco, has been able to achieve revitalization and modernization of capital assets. However, there are weaknesses in the planning and acquisition procedures which have been identified and which require management attention. Keywords: Public Works Centers; Productivity; Capital investments; Asset Capitalization Program; Capital equipment; Navy industrial fund; Five-year Capital Equipment Investment Plan. (Theses)","abstract_has_math":false,"creators":["Wolfe, Douglas A."],"institution":"Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"NA","school":"NA","contributors":[],"advisors":[],"committee_chairs":[],"committee_members":["NA"],"year":1985,"date_issued":"1985","date_published":"1985","updated_at":"2026-11-21T22:36:06Z","subjects":["Management"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["o80569170"],"render_values":[{"text":"o80569170","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/21182","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/21182","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F21182","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F21182","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.committeemember","label":"Committee Member","values":["NA"]},{"key":"dc:contributor.department","label":"Department","values":["NA"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["NA"]},{"key":"dc:contributor.school","label":"School","values":["NA"]},{"key":"dc:creator","label":"Author","values":["Wolfe, Douglas A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-27T00:00:18Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-27T00:00:18Z"]},{"key":"dc:date.issued","label":"Date","values":["1985"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["NA"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["o80569170"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/21182"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this thesis is to detail the management control process as related to the Productivity Program at the Navy Public Works Center (PWC) San Francisco, Calif. The Department of Defense and Navy programs provide a broad framework within all PWCs have developed their own unique Productivity Programs. The Asset Capitalization program (ACP) has provided industrial fund activities like PWCs with the means of implementing the productivity strategy. In particular, the Capital Equipment Investment Plan establishes a systematic approach in the substitution of capital equipment for labor with enhanced productivity a desired result. With such a plan, PWC San Francisco, has been able to achieve revitalization and modernization of capital assets. However, there are weaknesses in the planning and acquisition procedures which have been identified and which require management attention. Keywords: Public Works Centers; Productivity; Capital investments; Asset Capitalization Program; Capital equipment; Navy industrial fund; Five-year Capital Equipment Investment Plan. (Theses)"]},{"key":"dc:description.award","label":"Dc Description Award","values":["NA"]},{"key":"dc:description.sponsorship","label":"Dc Description Sponsorship","values":["NA"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/capitalequipment1094521182"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["98 p."]},{"key":"dc:title","label":"Title","values":["Capital equipment acquisition procedures for enhancing productivity at PWC San Francisco."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.committeemember":["NA"],"dc:contributor.department":["NA"],"dc:contributor.other":["NA"],"dc:contributor.school":["NA"],"dc:creator":["Wolfe, Douglas A."],"dc:date.accessioned":["2012-11-27T00:00:18Z"],"dc:date.available":["2012-11-27T00:00:18Z"],"dc:date.issued":["1985"],"dc:description.abstract":["The purpose of this thesis is to detail the management control process as related to the Productivity Program at the Navy Public Works Center (PWC) San Francisco, Calif. The Department of Defense and Navy programs provide a broad framework within all PWCs have developed their own unique Productivity Programs. The Asset Capitalization program (ACP) has provided industrial fund activities like PWCs with the means of implementing the productivity strategy. In particular, the Capital Equipment Investment Plan establishes a systematic approach in the substitution of capital equipment for labor with enhanced productivity a desired result. With such a plan, PWC San Francisco, has been able to achieve revitalization and modernization of capital assets. However, there are weaknesses in the planning and acquisition procedures which have been identified and which require management attention. Keywords: Public Works Centers; Productivity; Capital investments; Asset Capitalization Program; Capital equipment; Navy industrial fund; Five-year Capital Equipment Investment Plan. (Theses)"],"dc:description.award":["NA"],"dc:description.sponsorship":["NA"],"dc:description.uri":["http://archive.org/details/capitalequipment1094521182"],"dc:format.extent":["98 p."],"dc:identifier.oclc":["o80569170"],"dc:identifier.uri":["https://hdl.handle.net/10945/21182"],"dc:subject.keyword":["NA"],"dc:subject.lcsh":["Management"],"dc:title":["Capital equipment acquisition procedures for enhancing productivity at PWC San Francisco."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:36:06Z"}