{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/21322"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/21322","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An examination of the feasibility of identifying Marine Corps Reserve depot maintenance costs for use in budgeting.","abstract":"The Marine Corps Reserve has the depot maintenance portion of the O&M, MCR appropriation derived by inflating last years budget figure. The appropriation is then billed for depot maintenance on a \"fair share\" basis, with no system to identify whether the costs of work performed by the depot maintenance activities were actually incurred in work performed on Marine Corps Reserve equipment. The focus of this thesis is the breakdown in the current process of linking costs charged to the Reserve appropriation to actual Reserve generated depot maintenance requirements. Two alternative proposals are presented that allow for a link between actual measures of depot maintenance attributable to the Reserves, and the planning, programming, budgeting, and execution processes. The study recommends a change from the current methods of managing depot maintenance for the Reserves to an alternative method which measures Reserve depot maintenance in terms of equipment issued to Reserve units from the supply system.","abstract_html":"The Marine Corps Reserve has the depot maintenance portion of the O&amp;M, MCR appropriation derived by inflating last years budget figure. The appropriation is then billed for depot maintenance on a &quot;fair share&quot; basis, with no system to identify whether the costs of work performed by the depot maintenance activities were actually incurred in work performed on Marine Corps Reserve equipment. The focus of this thesis is the breakdown in the current process of linking costs charged to the Reserve appropriation to actual Reserve generated depot maintenance requirements. Two alternative proposals are presented that allow for a link between actual measures of depot maintenance attributable to the Reserves, and the planning, programming, budgeting, and execution processes. The study recommends a change from the current methods of managing depot maintenance for the Reserves to an alternative method which measures Reserve depot maintenance in terms of equipment issued to Reserve units from the supply system.","abstract_has_math":false,"creators":["Foulk, Robert E."],"institution":"Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Administrative Sciences","school":null,"contributors":[],"advisors":["Fremgen, J. M."],"committee_chairs":[],"committee_members":["Melchar, D. E."],"year":1985,"date_issued":"1985-12","date_published":"1985-12","updated_at":"2026-11-21T22:46:55Z","subjects":["Management"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/21322","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/21322","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F21322","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Fremgen, J. M."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Melchar, D. E."]},{"key":"dc:contributor.department","label":"Department","values":["Administrative Sciences"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Foulk, Robert E."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1985"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-11-27T00:01:20Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-11-27T00:01:20Z"]},{"key":"dc:date.issued","label":"Date","values":["1985-12"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Marine Corps Reserve","depot maintenance","inventory control point","PPBS","O&M","MCR"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/21322"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The Marine Corps Reserve has the depot maintenance portion of the O&M, MCR appropriation derived by inflating last years budget figure. The appropriation is then billed for depot maintenance on a \"fair share\" basis, with no system to identify whether the costs of work performed by the depot maintenance activities were actually incurred in work performed on Marine Corps Reserve equipment. The focus of this thesis is the breakdown in the current process of linking costs charged to the Reserve appropriation to actual Reserve generated depot maintenance requirements. Two alternative proposals are presented that allow for a link between actual measures of depot maintenance attributable to the Reserves, and the planning, programming, budgeting, and execution processes. The study recommends a change from the current methods of managing depot maintenance for the Reserves to an alternative method which measures Reserve depot maintenance in terms of equipment issued to Reserve units from the supply system."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/anexaminationoff1094521322"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["67 p."]},{"key":"dc:title","label":"Title","values":["An examination of the feasibility of identifying Marine Corps Reserve depot maintenance costs for use in budgeting."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Captain, United States Marine Corps"]}]}],"canonical_facts":{"dc:contributor.advisor":["Fremgen, J. M."],"dc:contributor.committeemember":["Melchar, D. E."],"dc:contributor.department":["Administrative Sciences"],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Foulk, Robert E."],"dc:date":["December 1985"],"dc:date.accessioned":["2012-11-27T00:01:20Z"],"dc:date.available":["2012-11-27T00:01:20Z"],"dc:date.issued":["1985-12"],"dc:description.abstract":["The Marine Corps Reserve has the depot maintenance portion of the O&M, MCR appropriation derived by inflating last years budget figure. The appropriation is then billed for depot maintenance on a \"fair share\" basis, with no system to identify whether the costs of work performed by the depot maintenance activities were actually incurred in work performed on Marine Corps Reserve equipment. The focus of this thesis is the breakdown in the current process of linking costs charged to the Reserve appropriation to actual Reserve generated depot maintenance requirements. Two alternative proposals are presented that allow for a link between actual measures of depot maintenance attributable to the Reserves, and the planning, programming, budgeting, and execution processes. The study recommends a change from the current methods of managing depot maintenance for the Reserves to an alternative method which measures Reserve depot maintenance in terms of equipment issued to Reserve units from the supply system."],"dc:description.uri":["http://archive.org/details/anexaminationoff1094521322"],"dc:format.extent":["67 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/21322"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Marine Corps Reserve","depot maintenance","inventory control point","PPBS","O&M","MCR"],"dc:subject.lcsh":["Management"],"dc:title":["An examination of the feasibility of identifying Marine Corps Reserve depot maintenance costs for use in budgeting."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Captain, United States Marine Corps"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:46:55Z"}